Page 1 of 6
SDN World 3 Construction Queue Thread
Posted: 2009-11-13 02:32pm
by Steve
Gonna sticky this, basically this is where we will post our construction queues, with month attached. For the most part I only expect quarterly updates, and given most things take even longer to finish than a quarter you may only end up updating once every six game months. I will allow monthly updates, however, for those who wish to.
Anyway, here's the rough format I'm looking at, demonstrated by my own listing.
Edit: Put in separate post to make editing easier later on, that way I don't accidentally wipe out the rest of this text.
When you update your queue, I ask that you put new stuff in bold and, for one update, strike out old stuff that's complete, though the first run doesn't have to be done this way for... obvious reasons.
Edit 2: To make it clear, I've decided that every update to your queue should be a new post. Please begin doing so.
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-13 02:35pm
by Steve
April 1925 Construction Queue
Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550
National Projects:
Air Tech 4 = 20 IBPs
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 IBPs (Completion Date January 1927)
Infrastructure Upgrades - Northern Australia Rail lines = 10 IBPs
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Future Investment Project = 10 IBPs
Total Cost: 115 IBPs
Army
10 Activations of Reserve Infantry Divisions for Regular service = 10 IBPs, complete in August 1925
Upgrading 3rd Australian Guards to Motorized Status = 9 IBPs, complete in February 1926, full effectiveness reduced until November 1926
5 Reserve Infantry Divisions = 10 IBPs (Cost Date Completed 1 August 1925, unit effectiveness full in 1 August 1926)
3 Motorized Infantry Divisions w/ Armored Recon Battalion = 33 IBPs (Cost Date completed February 1926, unit effectiveness 1 February 1927)
1 Motorized Artillery Brigade = 6 IBPs, complete in February 1926, max effectiveness in February 1927
Maintenance Costs:
270,000 Actives = 2.7 IBPs
2,970,000 Reservists = 5.94 IBPs
Total Cost: 76.64 IBPs
Navy
2 Henken-class (1,400t) = 0.14 IBPs (completion in March 1925)
3 L-class (2,000t) = 0.3 IBPs (completion in April 1925)
10
Nez Perce-class (14,300t) = 151.2 IBPs (construction phase complete June-August 1925, full completion in February-April of 1926)
6 1
Sovereign-class (50,428t) = 50.4 IBPs (construction phase complete in May of 1925, full completion in May 1926)
5 Sovereign-class (50,428t) = 12.6 IBPs (fitting out phase, completion in March-April 1926)
2 Defiant-class (53,348t) = 106.6 IBPs (construction phase complete in March 1927, full completion in March 1928)
Maintenance Costs:
1,508,800 tonnes = 15.08 IBPs
Total Cost: 320.88 IBPs
Air Force
4 prototype PF-4 biplane fighters = 4 IBPs(Completion July 1925)
4 prototype BF-3 biplane bombers = 4 IBPs(Completion July 1925_
40 PF-3 biplane fighters = 4 IBPs (Completion July 1925)
12 8 T-1 transport aircraft = 4 IBPs (completion July 1925)
20 10 RC-2 coastal patrol flying boats = 5 IBPs (completion July 1925)
Maintenance Costs:
192 Aircraft = 1.92 IBPs
Total Cost: 22.92 IBPs
Overall Expenditures: 535.44/550 IBPs
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-13 04:26pm
by Raj Ahten
Republic of Chilitina
Quarter One 1925
Total IBP's: 525 (500 base +5% economy)
National Projects:
Infrastructure Upgrades: 6 IBP's for better highway connections to the borders.
Army:
Upgrade of 13 Artillery Brigades to Motorized: 39 IBP's, complete January 1926.
Upgrade of 39 Infantry/Marine Brigades to Motorized: 117 IBP's, complete October 1925.
Building 6 armored Recon Batts to augment Cavalry: 12 IBP's, complete January 1926.
Navy:
17 Fubuki class Destroyers (1780t), 28.48 IBP's. Complete October 1925.
7 Aoba class Heavy Cruisers (7100t), 49.7 IBP's. Complete Janaury 1926.
4 South Dakota class Battleships (43200t), 172.8 IBP's. Complete January 1927.
1 Lexington conversion New build (38746t), 38.75 IBP's. Complete January 1927
1 Lexington conversion being finished (38746t), 38.75 IBP's. Complete June 1925
Total Naval IBP's: 330.26 rounded up to 331.
Air Force
100 Air Superiority Fighters. 10 IBP's, complete March 1925.
20 Level Bombers. 10 IBP's, complete March 1925.
Total spending:525/525 points.
Quarter Two 1925
Total IBP's: 525 (500 base +5% economy)
National Projects:
Infrastructure Upgrades: 26 IBP's for better highway connections to the borders and better roads in general.
Army:
Upgrade of 13 Artillery Brigades to Motorized: 39 IBP's, complete January 1926.
Upgrade of 39 Infantry/Marine Brigades to Motorized: 117 IBP's, complete October 1925.
Building 6 armored Recon Batts to augment Cavalry: 12 IBP's, complete January 1926.
Navy:
17 Fubuki class Destroyers (1780t), 28.48 IBP's. Complete October 1925.
7 Aoba class Heavy Cruisers (7100t), 49.7 IBP's. Complete Janaury 1926.
4 South Dakota class Battleships (43200t), 172.8 IBP's. Complete January 1927.
1 Lexington conversion New build (38746t), 38.75 IBP's. Complete January 1927
1 Lexington conversion being finished (38746t), 38.75 IBP's. Complete June 1925
Total Naval IBP's: 330.26 rounded up to 331.
Total spending:525/525 points.
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-13 05:08pm
by Siege
Egyptian Sultanate
Industry 4: 400 pts/quarter
Q1, 1925
National Projects 91
49 Economy Investments
42 Infrastructure Investments (Wedjahor Railroad & others)
Army 77
10 - 10x Infantry Divisions (H) [From reserves] (1/2)
10 - 10x Cavalry Divisions [From reserves] (1/2)
27 - 3x Infantry Division (M) (1/8)
30 - 3x Armored Brigade (1/8)
Air Corps 90
10 - 100 Avia BH-21
15 - 150 Fokker D.XIV
15 - 150 Gloster Grebe
10 - 100 Blackburn Dart
20 - 40 Vickers Virginia
20 - 4 Airship Carrier (1/2)
Navy 142
2 Misr class heavy cruiser (8 KT)
1 Imperator class battleship (53 KT) [From Germany]
1 Ersatz Yorck class battlecruiser (33 KT) [From Germany]
+ 40 [German profit margin]
Q2, 1925
Paid & Pending:
10x Infantry Divisions (H) [From reserves] (2/2)
10x Cavalry Divisions [From reserves] (2/2)
3x Infantry Division (M) (2/4)
3x Armored Brigade (2/4)
National Projects 123
55 Economy Investments
70 Infrastructure Investments (Wedjahor Railroad & others)
Army 75
25 Development of Tank, Cavalry, Mk I
50 Upgrade Cavalry Divisions to Armored Cavalry Divisions (1/4)
Air Corps 100
10 - 100 Avia BH-21
15 - 150 Fokker D.XIV
05 - 050 Gloster Grebe
10 - 100 Breguet 19
10 - 100 Blackburn Dart
10 - 20 Vickers Virginia
10 - 20 Handley Page V/1500
20 - 4 Airship Carrier (2/2)
Navy 102
2 Misr class heavy cruiser (8 KT) (2/8)
1 Imperator class battleship (53 KT) (2/8)
1 Ersatz Yorck class battlecruiser (33 KT) (2/8)
Q3, 1925
Paid & Pending:
3x Infantry Division (M) (3/4)
3x Armored Brigade (3/4)
5x Upgrade Cavalry Divisions to Armored Cavalry Divisions (2/4)
National Projects 73
33 Economy Investments
40 Infrastructure Investments (Wedjahor Railroad & others)
Army 125
25 Development of Tank, Cavalry, Mk I
50 Motorization of 5 Infantry Divisions (1/4)
50 For development & distribution of organic tank units (25 corps-level tank battalions) (1/4)
Air Corps 100
10 - 100 Avia BH-21
10 - 100 Fokker D.XIV
30 - 60 Vickers Virginia
30 - 60 Handley Page V/1500
20 - 4 airship carriers (1/2)
Navy 102
2 Misr class heavy cruiser (8 KT) (3/8)
1 Imperator class battleship (53 KT) (3/8)
1 Ersatz Yorck class battlecruiser (33 KT) (3/8)
Q4, 1925
Paid & Pending:
3x Infantry Division (M) (4/4)
3x Armored Brigade (4/4)
5x Upgrade Cavalry Divisions to Armored Cavalry Divisions (3/4)
5x Motorization of Infantry Divisions (2/4)
25x Corps-level Tank Battalions (2/4)
4x airship carriers (2/2)
National Projects 100
50 Economy Investments
50 Infrastructure Investments (Wedjahor Railroad & others)
Army 65
25 Development of Tank, Cavalry, Mk I
4 Armored Brigades (1/4)
Air Corps 125
25 Development of V/2500 bomber
10 KTW Sparrowhawk prototype airframe
10 - 100 Avia BH-21
10 - 100 Fokker D.XIV
10 - 100 Gloster Grebe
30 - 60 Vickers Virginia
30 - 60 Handley Page V/1500
Navy 110
2 Misr class heavy cruiser (8 KT) (4/8)
1 Imperator class battleship (53 KT) (4/8)
1 Ersatz Yorck class battlecruiser (33 KT) (4/8)
16 R-class submarines (500t) 8 (1/4)
1925 Investment Summary
Economy Investment: 187
Infrastructure Investment: 202
Development of Tank, Cavalry, Mk I: 75
Aircraft Constructed:
400 Avia BH-21
500 Fokker D.XIV
300 Gloster Grebe
100 Breguet 19
200 Blackburn Dart
180 Vickers Virginia
140 Handley Page V/1500
8 Jibrail class airship carriers
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-13 08:28pm
by Evincer
300 pts total build points per quarter
Maintenance Costs
1010 aircraft (including auxilliaries) = 10 IBP
504,000 active duty soldiers = 5 IBP
2,000,000 reservists = 4 IBP
300,000 tons of naval combatants = 3 IBP
Total: 22 IBP
Research and Construction Projects
30 pts for one year for conversion to all-metal production of aircraft
48 pts for construction of "Phase 2" Inka habitats
30 pts for construction of redundant subway tunnels
40 pts for expansion of telegraph and telephone lines and radio towers to every small community
30 pts for television research
The above are all yearly expenses
Total = 190 pts
Naval
Under Construction
3+3+2(4) = 10
80,000-100,000 tons of yard capacity
2 Svierge-class Coastal Defense ships = 14 pts
10 2,000-ton destroyers = 20,000 tons = 20 pts
4 2,850-ton submarines (improved) = 11,400 tons = 11 pts
4 2,000-ton type U46a submarines = 8,000 tons = 8 pts
4 420-ton R-class submarines = 1,680 tons =2 pts
= 55 pts
All ready in 9 months except for Svierge-class, which requires 1 year of construction
Q1-1925 projects that are now complete
Construction and Research
Aside from the yearly projects,
60 pts into construction of "Phase 2" Inka habitats
Army
Accelerated production of Model-1918 submachinegun - 15 pts
Air
Sopwith Siskin - 100 [10 pts]
Supermarine Southhampton - 10 [5 pts]
Torpedo Bomber - 80 [8 pts]
Constructing Vickers Victoria Prototype Airframe - 2 [10 pts]
Constructing Autogyro Prototypes - 4 [4 pts]
F8C Prototypes - 4 [4 pts]
Total Air Construction: 40 pts
New Q2 Projects
Air
Sopwith Siskin - 100 - [10 pts]
Torpedo Bomber - 40 [4 pts]
Supermarine Southampton - 4 [2 pts]
Foreign prototype - 5 pts
Evaluation of Vickers Victoria Prototype Airframes - 1 pt
Evaluation of F8C Prototypes - 1 pt
Constructing further Autogyro Prototypes - 4 [4 pts]
Fighter replacements - 1 pt
Larger aircraft replacements - 2 pts
Total = 30 pts
Army
Continued acceleration of submachinegun production - 10 pts
Acceleration of Model 1897 trench shotgun production - 5 pts
Funding and contribution of engineers to foreign prototype - 5 pts
Initiating improved anti-tank mine research - 5 pts
Total = 25 pts
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-15 01:35pm
by Master_Baerne
French Republic
675 Industrial Points
Army Expenditures:
45x Infantry Brigades to Mechanized Status; 135 points, Q1 1929
TOTAL: 135 Points
Navy Expenditures:
2x Richelieu-Class Fast Battleship; 49 points; 49 200 tons, Q1 1930
4x Admiral-Class Battlecruiser; 45 points; 45 200 tons, Q1 19230
10x Suffren-Class Cruiser; 10 points; 10 000 tons, Q1 1929
TOTAL: 378 Points
Air Force Expenditures:
150x bomber monoplane 1927 - 15 points
100x dive bomber 1925 - 10 points
150x fighter monoplane 1927 - 15 points
50x transport 1928 - 5 points
TOTAL: 45 Points
Military Expenditures Subtotal: 558 Points
German Canal Project: 50 Points; ongoing
Aerodrome Construction: 67 Points; ongoing
TOTAL EXPENDITURES: 675 Points
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-15 10:30pm
by Czechmate
Nordic Union - Q1 (Winter), 1925
525ibp
Navy - 170ibp
1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)
Army - 290ibp
Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)
Air Force - 65ibp
260 Boeing FB - 26pts (completing Q2 1925)
120 Boeing DT - 24pts (completing Q2 1925)
3 Zeppelins - 15pts (completing Q3 1925)
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-16 12:43am
by RogueIce
United States of America - Q1 FY1925
Total: 550 IBPs (5 IND/5 ECON)
National Projects
100 IBPs to Air Tech 4
100 IBPs to Army Tech 4
United States Navy
Fitting out Omaha class CL (7050t): 0.3525 (Completed FEB 1925)
Fitting out South Dakota class BB (43200t): 2.16 (Complete AUG 1925)
Building South Dakota class BB (43200t): 43.2 (Construction complete AUG 1925; Fitting out complete AUG 1926)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
TOTAL: 368.1125 / 550
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-16 02:04am
by K. A. Pital
Soviet Union - year 1925
Industrial Points: 400 per quarter.
1925, Q2: Massive mobilization. 400 + 300 = 700 IBPs per quarter.
Maintenance: Q1 - 26, Q2 - 51, Q3 - 51.
Q1 - 9 IBP for Navy, 13 IBP for active and called-up Army, 4 IBPs for the Air Forces.
Q2 - 9 IBP for Navy, 38 IBP for active and called-up Army, 4 IBPs for the Air Forces.
Q3 - 9 IBP for Navy, 38 IBP for active and called-up Army, 4 IBPs for the Air Forces.
Naval Buildup: Q1 - 83, Q2 - 83, Q3 - 83,
- Outfitting launched battleship
SNS Ivan Bubnov: 48 kt x 4 quarters (a total of 192 pt for the year)
- Rebuilding training ship "Ocean" into the carrier
SNS Komsomolets: 12 kt x 4 quarters (a total of 48 pt for the year)
- Outfitting launched hull of battleship "Imperatritsa Maria", converted into the carrier
SNS Sokol: 23 kt x 4 quarters (a total of 92 pt for the year)
Army Buildup: Q1 - 30, Q2 - 60, Q3 - ~200 (reflecting the continuing training of almost all mobilized units, hence still carrying the expenditures)
- 1500 Renault Russian Tanks for 10x Armored Brigades - 100 points (included in costs below)
Raising units, Q1: 30
30 reserve divisions to full strength - 30 points. Special Far Eastern Army.
Raising units, Q2: 60
30 reserve divisions to full strength - 30 points. Special Far Eastern Army.
10 reserve divisions to full strength - 10 points. Siberian Military District.
20 reserve divisions to full strength - 20 points. Central Asian Military District.
Mobilization: 149 points
Moscow: 23 points (5x 50% complect divisions to full strength - 3 points, 20x reserve rifle 10% complect divisions to full strength - 20 points)
Leningrad: 22 points (3x 50% complect divisions to full strength - 2 points, 20x reserve rifle 10% complect divisions to full strength - 20 point)
Belorusso-Baltic Military District: 33 points (5x 50% complect divisions to full strength - 3 points, 30x reserve rifle 10% complect divisions to full strength - 30 points)
Ukrainian Military District: 35 points (10x 50% complect divisions to full strength - 5 points, 30x reserve rifle 10% complect divisions to full strength - 30 points)
North Caucases Military District: 7 points (4x 50% complect divisions to full strength - 2 points, 5x reserve rifle 10% complect divisions to full strength - 5 points)
Volga Military District: 24 points (8x 50% complect divisions to full strength - 4 points, 10x reserve rifle 10% complect divisions to full strength - 10 points, 10x reserve cavalry divisions to full strength - 10 points)
Activation of all 20 territorial reserve regiments: 5 points (equal to 5 divisions' worth of manpower).
Formation of 10x new armored brigades and production of 1500
Renault Russian light tanks for it: 100 points
Total Q2 activation expenditures: 319 points.
Raising units, Q3: none.
Airforce buildup: Q1 - 17, Q2 - 9, Q4 - 1.
Q1 1925: 17 points
110
R-1 - 11 points.
30
R-2 - 3 points
1
Tupolev ANT-3 (R-3) - 1 points (tenfold expenses for prototypes)
1
Tupolev ANT-4 (TB-1) - 2 points (tenfold expenses for prototypes)
Q2 1925: 24 points
1
Polikarpov MR-1 - 1 points (conversion of R-1 to seaplane)
30
R-1 - 3 points.
200
R-2 - 20 points.
1x Tupolev ANT-4 (TB-1) - 2 points for second prototype (paid for by Evincer as joint investment)
Q4 1925: 1 point
1
Tupolev ANT-3 (R-3) - 1 points (tenfold expenses for prototypes)
Year totals: 38 points
200
R-1 - 20 points.
130
R-2 - 13 points.
2
Tupolev ANT-3 (R-3) - 2 points (tenfold expenses for prototypes)
1
Tupolev ANT-4 (TB-1) - 2 points (tenfold expenses for prototypes)
1
Polikarpov MR-1 - 1 points (conversion of R-1 to seaplane)
Various industrial investments:
- Volkhov dam - upgrading from 58 MWt to 66 MWt (included in overall GOELRO expenditure).
- Shatura powerplant - launch. Power: 2x16 MWt turbines in 1925 (included in overall GOELRO expenditure).
-
Total GOELRO plan (construction and expansion of energy plants): so far planned 1750 MWt over the course of 15 years. Cost - 175 points total, or 12 points every year and 3 points every quarter.
Industrial investment in Tech Level Upgrade:
1925, Q1: 100 points (fullmetal aircraft; railway rolling bearings; metals and alloys; gun engineering; engine and turbine research)
1925, Q2: 100 points (fullmetal aircraft; railway rolling bearings; metals and alloys; gun engineering; engine and turbine research)
Industrial investment in Infrastructure Upgrade:
1925, Q1: 100 points (railways 60%, channels, sea and river water transport 20%, roads 20%).
1925, Q2: 100 points (railways 60%, channels, sea and river water transport 20%, roads 20%).
Industrial lease or gift points to other nations for military or overall economic assistance:
TBD
Industrial investment in Industry level upgrade:
Q1: 20 IBP
Q2: 20 IBP
Q3: 20 IBP
Q4: 20 IBP
Totals wrote:Points unused by the USSR (reflecting deficiencies and excess industrial capacity not fully utilized):
1st quarter 1925: 21 pt = 400 - 26 - 83 - 30 - 17 - 3 - 100 - 100 - 20
2nd quarter 1925: 10 pt = 700 - 51 - 83 - 319 - 24 - 3 - 100 - 100 - 20
3rd quarter 1925: TBD
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-16 10:13am
by Norade
Portuguese Production Log - 1925
Industrial Points:
Quarterly: 525
Used First Quarter: 515.3
Used Second Quarter: 519.7
Used Third Quarter: 524.8
Used Forth Quarter: 524.8
Domestic Projects: 20 points per quarter
-Health care research 5 IBP per quarter starting in Q2.
-Education funding, 5 IBP per quarter starting in Q2.
-Welfare, 10 IBP per quarter starting in Q2.
Naval Projects: 395.7 points per quarter
-Two 25kt hulls being converted to carriers, conversion started in 1923, in final fitting stage [Expected commission date: third quarter 1925] (2.5 points per quarter)
-Two 50kt Gigante-class Dreadnoughts, Laid in 1923, in final fitting/sea trial stage [Expected commission date: first quarter 1926] (5 points per quarter)
-Two 50kt Gigante-class Dreadnoughts, Laid in 1924, in hull construction stage [Expected commission date: first quarter 1927] (100 points per quarter)
-Four 26.3kt Intervenção-class Battleships, Laid in 1924, in hull construction stage [Expected commission date: first quarter 1927] (105.2 points per quarter)
-One 23.2kt Cidade-class Battleships, Laid in Q1 1925, in hull construction stage [Expected commission date: first quarter 1927] (23.2 points per quarter)
-Four 22kt Portugal-class Dreadnoughts undergoing a modernization, started in 1925, in initial phase [Expected re-commission date: forth quarter 1926] (88 points per quarter)
-Twenty 2.5kt Cruiser-class submarines, started in 1925, in initial phase [Expected commission date: fourth quarter 1925] (50 points per quarter)
Army Projects: 100 points per quarter, 100 points for the year
-Motorization of three artillery brigades [Expected completion date: first quarter 1926] (30 points, Q1)
-Creation of one armored brigade [Expected completion date: first quarter 1926, first quarter 1927 for maximum effectiveness] (10 points, Q1)
-Motorization of three artillery brigades [Expected completion date: second quarter 1926] (30 points, Q2)
-Creation of one armored brigade [Expected completion date: second quarter 1926, second quarter 1927 for maximum effectiveness] (10 points, Q2)
Air Projects: 28.4 points per quarter, 14.4 points for the year
-Twelve Fábrica F 1 flights [Expected completion date: first quarter 1925] (14.4 points, Q1) *Done*
-New Prototype fighter design [Expected project completion date: ???] (2 points, Q1)
-New Prototype bomber design [Expected project completion date: ???] (10 points, Q1)
-Two Fábrica AG 1 flights [Expected completion date: second quarter 1925] (2 IBP, Q2) *Done*
-Twelve Fábrica F 1 flights [Expected completion date: second quarter 1925] (14.4 points, Q2)
Military Research:
-Research into rotary winged aircraft [No projected completion date at this time.] (27 IBP starting in Q2, 20 IBP a quarter starting in Q3) [7 IBP from Spain]
-Research in jet engine design [No projected completion date at this time.] (20 IBP starting in Q2)
-Research in rocketry [No projected completion date at this time.] (15 IBP starting in Q2)
-Aircraft research [20 IBP starting in Q3]
-Naval research [6 IBP, starting in Q3]
-Tank research [5 IBP, starting in Q3]
-Small Arms research [5 IBP, starting in Q3]
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-16 10:35am
by Fingolfin_Noldor
Byzantine Empire
Industrial Points: 550points per quarter, 2200points per year
R&D and National Projects
1925Q1
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date January 1927, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia: 20 points
Total: 295 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
T-35 analogue prototype = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 111 points
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 28 points
Navy
4 carrier fighter bomber prototypes = 4 points (type to be determined)
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 2.5*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in construction till end Q1 1925 - 16.9*4 = 67.6 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) till end Q3 1925 = 16 points
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 115.6 points
Total: 549.6 points
1925Q2
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date January 1927, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia: 20 points
Total: 295 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
T-35 analogue prototype = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 111 points
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 30 points
Navy
4 carrier fighter bomber prototypes = 4 points (type to be determined)
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in construction till end Q3 1925 = 16 points
12 destroyers laid down (Chacal class, using 5"/38 guns, 40mm/39 guns, 20mm/40 guns.) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 113.22 points
Total: 549.6 points
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-16 10:43am
by Ryan Thunder
I'm going to mechanize as much of the Third Army Group as I can.
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-16 11:10pm
by Shinn Langley Soryu
Southeast Asian Union
GAME STATS
Basic industrial points: Industry 4 = 400 points / quarter
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 420 points / quarter during peacetime, 800 points / quarter during wartime
CONSTRUCTON ORDERS (Q1 1925)
Army
Upgrade to army tech level 4 = 60 IBPs (complete January 1927)
Air Force
Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started March 1925, construction complete April 1925)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started March 1925, construction complete April 1925)
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBPs each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
2 x Independencia class aircraft carrier (Lexington class aircraft carrier analogue; 38,746 tons standard, 38.7 IBPs each) = 3.8 IBPs (laid down July 1922, construction complete July 1924, trials complete July 1925)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
Industrial
Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)
CONSTRUCTON ORDERS (Q2 1925)
Army
Upgrade to army tech level 4 = 60 IBPs (complete January 1927)
Air Force
Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started June 1925, construction complete July 1925)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started June 1925, construction complete July 1925)
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBPs each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
2 x Independencia class aircraft carrier (Lexington class aircraft carrier analogue; 38,746 tons standard, 38.7 IBPs each) = 3.8 IBPs (laid down July 1922, construction complete July 1924, trials complete July 1925)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
Industrial
Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)
CONSTRUCTON ORDERS (Q3 1925)
Army
Upgrade to army tech level 4 = 60 IBPs (complete January 1927)
Reactivation of I-V Marine Expeditionary Forces + Caroline Islands Garrison = 16 IBPs (complete January 1926)
Air Force
Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started September 1925, construction complete October 1925)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started September 1925, construction complete October 1925)
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1925, construction complete April 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
Industrial
Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)
CONSTRUCTON ORDERS (Q4 1925)
Army
Upgrade to army tech level 4 = 60 IBPs (complete January 1927)
Reactivation of I-V Marine Expeditionary Forces + Caroline Islands Garrison = 16 IBPs (complete January 1926)
Air Force
Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started December 1925, construction complete January 1926)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started December 1925, construction complete January 1926)
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 3.2 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1925, construction complete April 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
Industrial
Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-18 06:03pm
by Minister of Pigeonry
Kingdom of Spain
Industrial Points Totals:
Industry: 3
Economy: 3
- (Peacetime): 300 Points
- (Wartime Mobilized): 525 Points
Q4, October-December 1925 - Total Points Used: 300
General Allotments:
Industrial Base Investment
Total: 10 Points (Began: Q2, 1925 - Completion: Ongoing)
Caribbean Territory Improvement Projects
Total: 10 Points (Began: Q4, 1925 - Completion: Ongoing)
Navy Budget Allotments:
"Even Acquisition Plan" - Spanish-German Naval Cooperation Agreement
Vessels to be built in Spain:
- 2x Fransisco Pizzaro-Class 40kt Battleships - 2x Royal Arsenal Shipyards, Ferrol
- 1x Ferdinand II-Class 40kt Battlecruiser - 1x Royal Arsenal Shipyards, Ferrol
Cost: 120
Vessels to be built in Germany:
- 2x Fransisco Pizzaro-Class 40kt Battleships - 1x Naval Shipyard, Bremerhaven - 1x Germaniawerft, Kiel
- 1x Ferdinand II-Class 40kt Battlecruiser - 1x Vulcan Stettin
Cost: 132 (10% Mark up on Vessels built in German Yards)
Total Cost for EAP: 264.6 Points (1925-1927)
- 252 Points - Construction (Began: Q1, 1925 - Completion: December 1926)
- 12.6 Points - Trials/Fitting Out (Begins: Q1, 1926 - Completion: December 1927)
Yard Usage:
3x 25k-40k Yards in Spain
3x 25k-40k Yards in Germany
"Seaplane Carrier Project"
- 1x Semental Volador-Class 15kt Seaplane Carrier (Details Pending) - 1x Royal Arsenal Shipyards, Ferrol
Total Cost for Project: 15.75 Points (1925-1927)
- 15 Points - Construction (Began: Q1, 1925 - Completion: April 1926)
- .75 Points - Trials/Fitting Out (Completion: October 1926)
Yard Usage:
15kt of Yard Space out of 180,000T
Submarine Technology Research Studies
Total Cost: 10 Points (Began: Q1, 1925 - Completion: On Hold)
‘Air Force’ Allotments:
General Military Aviation Research (Progress toward Tech 4 A.F.)
Total: 6 Points (Began: Q1, 1925 - Completion: Ongoing)
Autogyro/Helicopter Joint R&D with Portugal and Germany
Total: 7 Points (Began: Q2, 1925 - Completion: Ongoing)
‘Army’ Allotments:
EDIT: Altered to reflect removal of maintenance costs.
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-18 06:17pm
by Raesene
Available per Quarter: 420pts
Infrastructure: 20 General improvement to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and aborad
total 40pts
(Purpose is of course to increase the point value after some time)
Research
towards Air focus 3: 20
towards Army focus 4: 20
total 40pts
Indian Ocean Operation Costs 3 points, representing increased wear and tear as well as ships used for resupply ?
Ship Construction
- type |# building |pts/ship |pts/class |Q in construction/ of total time
BB |2x Patria |50 |100 |Quarter 1/8 |2 Patria-class; new ships
BB |1x Oceano |48 |48 |Quarter 6/8 |1 Il Principe-class
BC |1x Lepanto |33 |33 |quarter 8/8 |1 Medici-class
CA |1x Sangro |17 |17 |quarter 5/5 |1 Tevere-class
CV |1x Cigno |22 |22 |quarter 1/5 |1 as HMS Courageous
CV |1x Albatro |22 |22 |quarter 1/5 |1 as HMS Courageous
DD |12x Alkali et… |3 |36 |quarter 1/3 |new DDs
SS |14x long range |1 |14 |quarter 1/3
total 292 pts
Point cost of ships on trial/fitting out: 5.6 (1 BB; ready in July 1925; 2 CAs ready in March 1925, 1 CV ready in February 1925): 5.6 pts
Aircraft: # Sq|type |pts/sq |pts /type|
3 Squadron |Blackburn Dart |1 |3 |Bomber; 1 Sq. ready per month
6 Squadrons |Fairey Flycatcher |1 |6 |Fighter; 2 Sq. ready per month
Prototype |Fairey Horsely |1 |3 |Bomber/Recon; 3 aircraft; one wooden, one mixed and one completely metal
total 12
Used so far: 392.6
This list isn't completed yet, I'll build some more and also upgrade some army units.
EDIT: sorry ! made a mistake when creating the spreadsheet and -as Stas supposed - I entered 1pt/10k instead of for 1k. Hope the vertical lines Is there a way to format a table in this system ?
EDIT of EDIT: I will check my entries and formulae in excel more closely...
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-18 11:46pm
by CmdrWilkens
Industrial Projects of the Mexican Empire
Industry Level: 5 (Econ 4 +5% bonus)
525 pts available
520 In Use
Q4 1925 Current Projects
Army: (72)
- Upgrades: (18)
- VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
Acquisitions:
Navy: (350)
- Slipways: (130)
- Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
Acquisitions: (220)
- Four (4) Majestuoso class Battlecruisers: 220pts [(4 ships at 54.9 kt with 1pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
Air Force (16)
Acquisition: (16)
- 80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
Other: (80)
- Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
Shore Based HF/DF installations: 20pts (Started Q3 1925, ongoing)
Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)
============================================================
Q3 WARTIME Production [Started Q3 1925]
478 IBPs (1000 total available - 522 continuing Q3 items)
477.4 IBPs in use
Army: (311)
- Acquisitions: (14)
- Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization
7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
Upgrades: (297)
- Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
Navy: (138.4)
- Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
Eight (8) San Juan-class Cruisers [(10 ships at 9.4kt with 1pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
Air Force: (28)
- One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)
=======================
Q2 1985:
Army:
Navy:
Air Force:
- 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
Other:
=======================
Q3 1825:
Army:
- IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
Navy:
Air Force:
- 160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
Other:
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-19 11:16pm
by Beowulf
Manchuria
525 pts/qtr
Q1/1925
National projects:
48pts economy improvement
Army:
Units:
Activation of:
1st - 9th Reserve Infantry Corps, Heilongjiang province 4 pts/Corps = 36 pts
3nd Fortress Corps, Heilongjiang province 3pt/Div * 5 Div = 15 pts
51 pts
4 Armored Brigades (for upgrade of secondary reserve Corps)
40 pts
Aircraft:
100 J-2 - 10 points
100 Q-2 - 10 points
9 Q-3 - 9 points (prototype)
Metal aircraft development - 7
Wasp Radial engine development - 3 pts
39 pts
Fortresses:
Defense line Yat densification:
Hailar He/Heilongjiang Section - 4 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 44 pts
Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts
55pts total
Navy:
Slipway improvements:
1 new 70kton slips - 25 points complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, complete Winter 1927- Incheon Naval Shipyard
35pts total
Ships:
4 CA1923 - 2.5pts/qtr ea 8/8 complete 0/4 fitting out
2 BB1925 - 40 pts/qtr ea 0/8 complete
2 CA1925 - 53 pts/qtr ea 0/8 complete
4 CS1923 - 12.1 pts/qtr ea 0/5.33 complete
4 DD1923 - 1.2 pts/qtr 0/3 complete
252.6pts total
Aircraft:
10 Q-2 - 1 pt
Remaining 11.4 pts
Q2/1925
1000 pts available
National projects:
48pts economy improvement
Army:
Units:
Activation of:
1st - 9th Reserve Infantry Corps, Heilongjiang province 4 pts/Corps = 36 pts
3nd Fortress Corps, Heilongjiang province 3pt/Div * 5 Div = 15 pts
51 pts
5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 0/4
3 Infantry division motorization - 9 points ea - 27 points 0/4
+1 Armor Regiment - 10 points 0/4
40 points
4 Armored Brigades (for upgrade of secondary reserve Corps) 0/4
40 pts
4 Motorized Corps
Motor Artillery Brigade - 6 points 0/4
3 Motor Infantry division - 9 points ea - 27 points 0/4
+1 Armor Regiment - 10 points 0/4
172 pts
4 Infantry Corps
Artillery Brigade - 3 points 0/4
3 Infantry division - 2 points ea - 27 points 0/2
+1 Armor Regiment - 10 points 0/4
76 pts
International Volunteer Division - 3 pts 0/2
382 pts total
Aircraft:
210 J-2 - 21 points
210 Q-2 - 21 points
Metal aircraft development - 7
Wasp Radial engine development - 3 pts
52 pts
Fortresses:
Defense line Yat densification
Hailar He/Heilongjiang Section - 4 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 44 pts 1/4 complete
Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts 1/4 complete
55pts total
Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 1/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 1/8 complete Winter 1927- Incheon Naval Shipyard
35pts total
Ships:
4 CA1923 - 2.5pts/qtr ea 8/8 complete 1/4 fitting out
2 BB1925 - 40 pts/qtr ea 1/8 complete
2 CA1925 - 53 pts/qtr ea 1/8 complete
4 CS1923 - 12.1 pts/qtr ea 1/5.33 complete
4 DD1923 - 1.2 pts/qtr 1/3 complete
252.6pts total
Aircraft:
Over SML limit penalty: 3% of base = 15 points
Remaining 160.4 pts
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-20 12:12am
by Akhlut
500 points/quarter
Army
Upgrading 10 Reservists to Motorized Infantry: 100 Points
Upgrading 10 Active Cavalry Brigades to Armored: 25 Points/Quarter
10 Armored Recon Batallions: 5 Points/Quarter
Air Force Research: 20 Points
Tank Research: 20 Points
Weapons Research: 15 Points
Increase in Weapon Production: 80 Points
Bomber Production (1926): 10 Points
Fighter Production (1926): 10 Points
Weapon Production sent to USSR: 75
Army Total: 330 Points
Mining Improvements: 30 Points
Railroad Improvements: 30 Points
Electrification Improvements: 30 Points
Fortification Improvements: 30
Economy: 50 Points
Total: 140 Points
Grand Total: 500 Points
Remaining Points: 0
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-20 04:44am
by loomer
April, 1925, People's Republic of Afghanistan:
200 available
Army:
Infantry Weapons research, 5 points
Artillery design funding, 10 points
Force maintenance: 2.5 for AF, 2.5 for active military, 2 for reserves
Total: 23
Infrastructure:
National roadwork construction, 25 points
Electrical Grid for Kabul maintenance, design, and construction, 15 points
Radio research and Kabul Broadcasting Agency establishment, 15 points
Total: 55
Economy:
Oil exploration and drilling programs, 30 points
Gold and gem mining programs, 20 points
Total: 0
Industry:
General industrial improvements and construction, 50 points
Total: 50
Fortifications:
Initial fort constructions along Sheppo border (one 3 miles north of the border in Helmand, on a kilometre tall mountain/hill. It's an artillery fort (coords 29,29'7.22N 63,8'57.92E, Fort Akmar. It gets 10 points because its out of the way) (The other is situated 53 miles South-East of Kabul, in a mountain pass. 33,58'57.65N, 69,52'20.22E) 19 points
Russian border outpost construction, 12 points
Total: 32
Other:
Remainder: 3 points
Edit: Second revision.
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-20 12:18pm
by Coyote
The Yishuv
Yearly Stipend: 200 IBPs (Industry of 2) + 30 (Econ of 3) = 230 IBPs per year.
Military cost per year: 86 IBPs.
Remaining IBPs for year: 144
IBPs divided into quarterly allocations: 36 per quarter
Current Projects:
Coastal Railroad, 20 IBPs for 2Q 1925 (8 quarters projected)
Factory Upgrades, 10 IBPs for 2Q 1925 (1-time cost to buy industrial equipment from Europe)
Remaining: 6 IBPs being used for ongoing maintenance to barely-adequate electric & plumbing grid, roadways, streetcars, etc.
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-20 10:34pm
by Agent Sorchus
Sudan Blue Sultanate
Q1
ships
Ishmael class BC x3 from Q1 of 1924 to Q4 1925 . . . . . . . . .78Ibp
Shakir class BB x2 from Q1 1924 to Q4 1925 . . . . . . . . . . . .100IBp
4 Junayed class CL x4 from Q1 1925 to Q4 1925 . . . . . . . . . . 18.4IBp
4 Junayed class in fitting out from Q1 1925 to Q2 1925 . . . . . 9/10IBp
Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197.3IBps
10 Heavy Bombers . . . . . . . . . . . 5 IBp
110 Fighters . . . . . . . . . . . . . . .11 IBp
Maintenence
- Navy 12points
Air 2.4
Active 6.3
Reserve 5
Port refurbishment 42 IBp [6 Quarters]
60 IBp 6x 100 MWt electric plants [8Q]
30 IBp for new oil field digging [4Q]
15 for new oil refineries [6Q]
15 new Rail-lines [4Q]
Grand Total . 400IBp
Q2
ships
Ishmael class BC x3 from Q1 of 1924 to Q4 1925 . . . . . . . . .78Ibp
Shakir class BB x2 from Q1 1924 to Q4 1925 . . . . . . . . . . . .100IBp
4 Junayed class CL x4 from Q1 1925 to Q4 1925 . . . . . . . . . . 18.4IBp
4 Junayed class in fitting out from Q1 1925 to Q2 1925 . . . . . 9/10IBp
Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197.3IBps
160 Fighters . . . . . . . . . . . . . . .16 IBp
Maintenence
- Navy 12points
Air 2.4
Active 6.3
Reserve 5
Port refurbishment 42 IBp [5 Quarters]
60 IBp 6x 100 MWt electric plants [7 Q]
30 IBp for new oil field digging [3Q]
15 for new oil refineries [5Q]
15 new Rail-lines [3Q]
Grand Total . 400IBp
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-25 04:23pm
by Steve
I've decided it might be better if we post new construction queues so to better keep track of what we've built. You can still edit up until it is "due".
My mini-update, not actually due until later this week, for May, to account for launching my final
Sovereign and laying my third fast battleship.
May 1925 Construction Queue
Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550
National Projects:
Air Tech 4 =
20 10 IBPs
Upgrading 2 25-40kT Slipways to
40-55kT 55-70kT capacity = 40 IBPs (Completion Date March 1927)
Infrastructure Upgrades - Northern Australia Rail lines = 10 IBPs
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Future Investment Project = 10 IBPs
Total Cost: 125 IBPs
Army
10 Activations of Reserve Infantry Divisions for Regular service = 10 IBPs, complete in August 1925
Upgrading 3rd Australian Guards to Motorized Status = 9 IBPs, complete in February 1926, full effectiveness reduced until November 1926
5 Reserve Infantry Divisions = 10 IBPs (Cost Date Completed 1 August 1925, unit effectiveness full in 1 August 1926)
3 Motorized Infantry Divisions w/ Armored Recon Battalion = 33 IBPs (Cost Date completed February 1926, unit effectiveness 1 February 1927)
1 Motorized Artillery Brigade = 6 IBPs, complete in February 1926, max effectiveness in February 1927
Total Cost: 68 IBPs
Navy
10
Nez Perce-class (14,300t) = 151.2 IBPs (construction phase complete June-August 1925, full completion in February-April of 1926)
6 Sovereign-class (50,428t) = 0 IBPs (construction phase complete in May of 1925, full completion in May 1926)
6 Sovereign-class (50,428t) = 15.12 IBPs (fitting out phase, completion in March-April 1926)
2 3 Defiant-class (55,000t) = 165 IBPs (construction phase complete in March 1927, full completion in March 1928)
Total Cost: 331.32 IBPs
Air Force
4 prototype PF-4 biplane fighters = 4 IBPs(Completion July 1925)
4 prototype BF-3 biplane bombers = 4 IBPs(Completion July 1925_
40
PF-3 biplane fighters = 4 IBPs (Completion July 1925)
12 8 T-1 transport aircraft = 4 IBPs (completion July 1925)
20 10 RC-2 coastal patrol flying boats = 5 IBPs (completion July 1925)
Total Cost: 21 IBPs
Overall Expenditures: 545.32/550 IBPs
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-27 03:46pm
by Raesene
still to be fleshed out/recalculated/modified
Available per Quarter: 420pts
Infrastructure: 20 General improvement to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and abroad
total 40pts
(Purpose is of course to increase the point value after some time; 20 spent last Q in Inf and Econ)
Research
towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; 20 points spent last quarter on each
Ship Construction; bolded vessels are laid down this quarter
type |# building |pts/ship |pts/class |Q in construction/ of total time
BB |1x Patria |50 | 50 |Quarter 2/8 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 2/8 | Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 1/8 |Patria-class under construction
BB |1x Oceano |48 | 2.4 |Quarter 7/8 |1 Il Principe-class fitting out
BC |1x Lepanto |33 | 0|quarter 8/8 |1 Medici-class finished
CA |1x ? |17 |17 |quarter 1/5 |1 Tevere-class new ld under construction
CA |1x ? |17 |17 |quarter 1/5 |1 Tevere-class new ld under construction
CA |1x Sangro |17 | 0 |quarter 5/5 |1 Tevere-class finished
CV |1x Cigno |22 |22 |quarter 2/5 |1 as HMS Courageous under construction
CV |1x Albatro |22 |22 |quarter 2/5 |1 as HMS Courageous under construction
DD |12x Alkali et… |3 |36 |quarter 2/3 |new DDs under construction
SS |14x long range |1 |14 |quarter 2/3 under construction
SS |7 x long range |3 |21 |quarter 1/3 new Submarines, Surcouf-type (3000 ts) under construction
Point cost of ships on trial/fitting out: 2.4 for Oceano, battlecruiser, carrier and heavy cruiser are in service.
Aircraft: # Sq|type |pts/sq |pts /type|
3 Squadron |Blackburn Dart |1 |3 |Bomber; 1 Sq. ready per month
6 Squadrons |Fairey Flycatcher |1 |6 |Fighter; 2 Sq. ready per month
Prototype |Fairey Horsely |1 |3 |Bomber/Recon; 3 aircraft; one wooden, one mixed and one completely metal; repeat prototypes
total 12
total 376 so far
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-27 09:22pm
by Czechmate
Nordic Union - Q2 (Spring), 1925
525ibp
* denotes new build for this quarter
Navy - 170ibp
1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)
Army - 290ibp
Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)
Air Force - 65ibp
260 Boeing FB - 26pts (completing Q3 1925)*
120 Boeing DT - 24pts (completing Q3 1925)*
3 Zeppelins - 15pts (completing Q3 1925)
Units Completed:
260 Boeing FB - 26pts (completing Q2 1925)
120 Boeing DT - 24pts (completing Q2 1925)
Re: SDN World 3 Construction Queue Thread
Posted: 2009-11-27 11:45pm
by Lonestar
1927Q1
Navy
2XCenturion-BB 92 (laid down Q2 1927, launch Q3 1928)
2XMercury-BC 88 (laid down Q2 1927 launch Q3 1928)
2XCenturion-BB 5-Fitting out
2XMercury-BC 5-fitting out
6XM1925-DD 8
2XM1925CL 14
6XM1926DL-12
12XM1926MS-8
3XM1926DMS-4
1XM1926CV-20
6XM1927(a)SS-6
1XM1927"Large Vessel"-45
30XPursuit Planes- 3
30XTorpedo bomber-3
20Xshore-based naval patrol-10
Research
Slot 1: 24" "Special longrange" torpedo.
Started: Dec 1926
Complete: Feb 1930
Slot 2: Superheavy Naval Shells (15", 16" and 18" calibers)
Started: Dec 1926
Complete: Feb 1928
Slot 3: Medium Tank M1927
Started: Dec 1926
Complete: Dec 1927
Army
Corps Motorization: 27
New M1925 105mm SPG design=10 IBP
Equipping artillery brigades with M1925 105mm SPG for Motorized/Mechanized/Armored divisions=5 IBP
Coastal Defense Program=25IBP
Industrial
Chemical R&D=20IBP
Build 2 55,000-70,000 slipways(35IBP)(Q31925)
Build 2 55,000-70,000 slipways(35IBP)(Q21926)
Aviation production and R&D Investment=20IBP
General Industrial investment=60IBP for an additional 15 IBP(1928Q1)
Transfer of IBP to Manchuria=30IBP.
MOAR to come