SDN World 3 Construction Queue Thread

Create, read, or participate in text-based RPGs

Moderators: Thanas, Steve

User avatar
Steve
Emperor's Hand
Posts: 9774
Joined: 2002-07-03 01:09pm
Location: Florida USA
Contact:

SDN World 3 Construction Queue Thread

Post by Steve »

Gonna sticky this, basically this is where we will post our construction queues, with month attached. For the most part I only expect quarterly updates, and given most things take even longer to finish than a quarter you may only end up updating once every six game months. I will allow monthly updates, however, for those who wish to.

Anyway, here's the rough format I'm looking at, demonstrated by my own listing.

Edit: Put in separate post to make editing easier later on, that way I don't accidentally wipe out the rest of this text.

When you update your queue, I ask that you put new stuff in bold and, for one update, strike out old stuff that's complete, though the first run doesn't have to be done this way for... obvious reasons.

Edit 2: To make it clear, I've decided that every update to your queue should be a new post. Please begin doing so.
”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt

"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia

American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.

DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
User avatar
Steve
Emperor's Hand
Posts: 9774
Joined: 2002-07-03 01:09pm
Location: Florida USA
Contact:

Re: SDN World 3 Construction Queue Thread

Post by Steve »

April 1925 Construction Queue

Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550

National Projects:

Air Tech 4 = 20 IBPs
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 IBPs (Completion Date January 1927)
Infrastructure Upgrades - Northern Australia Rail lines = 10 IBPs
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Future Investment Project = 10 IBPs

Total Cost: 115 IBPs


Army

10 Activations of Reserve Infantry Divisions for Regular service = 10 IBPs, complete in August 1925
Upgrading 3rd Australian Guards to Motorized Status = 9 IBPs, complete in February 1926, full effectiveness reduced until November 1926
5 Reserve Infantry Divisions = 10 IBPs (Cost Date Completed 1 August 1925, unit effectiveness full in 1 August 1926)
3 Motorized Infantry Divisions w/ Armored Recon Battalion = 33 IBPs (Cost Date completed February 1926, unit effectiveness 1 February 1927)
1 Motorized Artillery Brigade = 6 IBPs, complete in February 1926, max effectiveness in February 1927

Maintenance Costs:
270,000 Actives = 2.7 IBPs
2,970,000 Reservists = 5.94 IBPs

Total Cost: 76.64 IBPs


Navy

2 Henken-class (1,400t) = 0.14 IBPs (completion in March 1925)
3 L-class (2,000t) = 0.3 IBPs (completion in April 1925)
10 Nez Perce-class (14,300t) = 151.2 IBPs (construction phase complete June-August 1925, full completion in February-April of 1926)
6 1 Sovereign-class (50,428t) = 50.4 IBPs (construction phase complete in May of 1925, full completion in May 1926)
5 Sovereign-class (50,428t) = 12.6 IBPs (fitting out phase, completion in March-April 1926)
2 Defiant-class (53,348t) = 106.6 IBPs (construction phase complete in March 1927, full completion in March 1928)

Maintenance Costs:
1,508,800 tonnes = 15.08 IBPs

Total Cost: 320.88 IBPs

Air Force


4 prototype PF-4 biplane fighters = 4 IBPs(Completion July 1925)
4 prototype BF-3 biplane bombers = 4 IBPs(Completion July 1925_
40 PF-3 biplane fighters = 4 IBPs (Completion July 1925)
12 8 T-1 transport aircraft = 4 IBPs (completion July 1925)
20 10 RC-2 coastal patrol flying boats = 5 IBPs (completion July 1925)

Maintenance Costs:
192 Aircraft = 1.92 IBPs

Total Cost: 22.92 IBPs

Overall Expenditures: 535.44/550 IBPs
”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt

"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia

American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.

DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
User avatar
Raj Ahten
Jedi Council Member
Posts: 2068
Joined: 2006-04-30 12:49pm
Location: Back in NOVA

Re: SDN World 3 Construction Queue Thread

Post by Raj Ahten »

Republic of Chilitina
Quarter One 1925


Total IBP's: 525 (500 base +5% economy)

National Projects:

Infrastructure Upgrades: 6 IBP's for better highway connections to the borders.

Army:

Upgrade of 13 Artillery Brigades to Motorized: 39 IBP's, complete January 1926.
Upgrade of 39 Infantry/Marine Brigades to Motorized: 117 IBP's, complete October 1925.
Building 6 armored Recon Batts to augment Cavalry: 12 IBP's, complete January 1926.

Navy:

17 Fubuki class Destroyers (1780t), 28.48 IBP's. Complete October 1925.
7 Aoba class Heavy Cruisers (7100t), 49.7 IBP's. Complete Janaury 1926.
4 South Dakota class Battleships (43200t), 172.8 IBP's. Complete January 1927.
1 Lexington conversion New build (38746t), 38.75 IBP's. Complete January 1927
1 Lexington conversion being finished (38746t), 38.75 IBP's. Complete June 1925

Total Naval IBP's: 330.26 rounded up to 331.

Air Force

100 Air Superiority Fighters. 10 IBP's, complete March 1925.
20 Level Bombers. 10 IBP's, complete March 1925.

Total spending:525/525 points.

Quarter Two 1925

Total IBP's: 525 (500 base +5% economy)

National Projects:
Infrastructure Upgrades: 26 IBP's for better highway connections to the borders and better roads in general.

Army:

Upgrade of 13 Artillery Brigades to Motorized: 39 IBP's, complete January 1926.
Upgrade of 39 Infantry/Marine Brigades to Motorized: 117 IBP's, complete October 1925.
Building 6 armored Recon Batts to augment Cavalry: 12 IBP's, complete January 1926.

Navy:

17 Fubuki class Destroyers (1780t), 28.48 IBP's. Complete October 1925.
7 Aoba class Heavy Cruisers (7100t), 49.7 IBP's. Complete Janaury 1926.
4 South Dakota class Battleships (43200t), 172.8 IBP's. Complete January 1927.
1 Lexington conversion New build (38746t), 38.75 IBP's. Complete January 1927
1 Lexington conversion being finished (38746t), 38.75 IBP's. Complete June 1925

Total Naval IBP's: 330.26 rounded up to 331.

Total spending:525/525 points.
Last edited by Raj Ahten on 2009-11-21 01:02am, edited 1 time in total.
User avatar
Siege
Sith Marauder
Posts: 4108
Joined: 2004-12-11 12:35pm

Re: SDN World 3 Construction Queue Thread

Post by Siege »

Egyptian Sultanate

Industry 4: 400 pts/quarter

Q1, 1925

National Projects 91

49 Economy Investments
42 Infrastructure Investments (Wedjahor Railroad & others)

Army 77

10 - 10x Infantry Divisions (H) [From reserves] (1/2)
10 - 10x Cavalry Divisions [From reserves] (1/2)
27 - 3x Infantry Division (M) (1/8)
30 - 3x Armored Brigade (1/8)

Air Corps 90

10 - 100 Avia BH-21
15 - 150 Fokker D.XIV
15 - 150 Gloster Grebe

10 - 100 Blackburn Dart
20 - 40 Vickers Virginia

20 - 4 Airship Carrier (1/2)

Navy 142

2 Misr class heavy cruiser (8 KT)

1 Imperator class battleship (53 KT) [From Germany]
1 Ersatz Yorck class battlecruiser (33 KT) [From Germany]
+ 40 [German profit margin]


Q2, 1925

Paid & Pending:

10x Infantry Divisions (H) [From reserves] (2/2)
10x Cavalry Divisions [From reserves] (2/2)
3x Infantry Division (M) (2/4)
3x Armored Brigade (2/4)

National Projects 123

55 Economy Investments
70 Infrastructure Investments (Wedjahor Railroad & others)

Army 75

25 Development of Tank, Cavalry, Mk I
50 Upgrade Cavalry Divisions to Armored Cavalry Divisions (1/4)

Air Corps 100

10 - 100 Avia BH-21
15 - 150 Fokker D.XIV
05 - 050 Gloster Grebe

10 - 100 Breguet 19
10 - 100 Blackburn Dart
10 - 20 Vickers Virginia
10 - 20 Handley Page V/1500

20 - 4 Airship Carrier (2/2)

Navy 102

2 Misr class heavy cruiser (8 KT) (2/8)
1 Imperator class battleship (53 KT) (2/8)
1 Ersatz Yorck class battlecruiser (33 KT) (2/8)


Q3, 1925

Paid & Pending:
3x Infantry Division (M) (3/4)
3x Armored Brigade (3/4)
5x Upgrade Cavalry Divisions to Armored Cavalry Divisions (2/4)

National Projects 73

33 Economy Investments
40 Infrastructure Investments (Wedjahor Railroad & others)

Army 125

25 Development of Tank, Cavalry, Mk I
50 Motorization of 5 Infantry Divisions (1/4)
50 For development & distribution of organic tank units (25 corps-level tank battalions) (1/4)

Air Corps 100

10 - 100 Avia BH-21
10 - 100 Fokker D.XIV
30 - 60 Vickers Virginia
30 - 60 Handley Page V/1500
20 - 4 airship carriers (1/2)

Navy 102

2 Misr class heavy cruiser (8 KT) (3/8)
1 Imperator class battleship (53 KT) (3/8)
1 Ersatz Yorck class battlecruiser (33 KT) (3/8)


Q4, 1925

Paid & Pending:
3x Infantry Division (M) (4/4)
3x Armored Brigade (4/4)
5x Upgrade Cavalry Divisions to Armored Cavalry Divisions (3/4)
5x Motorization of Infantry Divisions (2/4)
25x Corps-level Tank Battalions (2/4)
4x airship carriers (2/2)

National Projects 100

50 Economy Investments
50 Infrastructure Investments (Wedjahor Railroad & others)

Army 65

25 Development of Tank, Cavalry, Mk I
4 Armored Brigades (1/4)

Air Corps 125

25 Development of V/2500 bomber
10 KTW Sparrowhawk prototype airframe

10 - 100 Avia BH-21
10 - 100 Fokker D.XIV
10 - 100 Gloster Grebe
30 - 60 Vickers Virginia
30 - 60 Handley Page V/1500

Navy 110

2 Misr class heavy cruiser (8 KT) (4/8)
1 Imperator class battleship (53 KT) (4/8)
1 Ersatz Yorck class battlecruiser (33 KT) (4/8)
16 R-class submarines (500t) 8 (1/4)

1925 Investment Summary

Economy Investment: 187
Infrastructure Investment: 202
Development of Tank, Cavalry, Mk I: 75

Aircraft Constructed:
400 Avia BH-21
500 Fokker D.XIV
300 Gloster Grebe
100 Breguet 19
200 Blackburn Dart
180 Vickers Virginia
140 Handley Page V/1500
8 Jibrail class airship carriers
Last edited by Siege on 2010-02-09 09:17am, edited 15 times in total.
Image
SDN World 2: The North Frequesuan Trust
SDN World 3: The Sultanate of Egypt
SDN World 4: The United Solarian Sovereignty
SDN World 5: San Dorado
There'll be a bodycount, we're gonna watch it rise
The folks at CNN, they won't believe their eyes
Evincer
Youngling
Posts: 68
Joined: 2009-11-07 01:19pm

Re: SDN World 3 Construction Queue Thread

Post by Evincer »

300 pts total build points per quarter

Maintenance Costs

1010 aircraft (including auxilliaries) = 10 IBP

504,000 active duty soldiers = 5 IBP
2,000,000 reservists = 4 IBP

300,000 tons of naval combatants = 3 IBP

Total: 22 IBP

Research and Construction Projects

30 pts for one year for conversion to all-metal production of aircraft
48 pts for construction of "Phase 2" Inka habitats
30 pts for construction of redundant subway tunnels
40 pts for expansion of telegraph and telephone lines and radio towers to every small community
30 pts for television research

The above are all yearly expenses

Total = 190 pts

Naval

Under Construction

3+3+2(4) = 10

80,000-100,000 tons of yard capacity

2 Svierge-class Coastal Defense ships = 14 pts
10 2,000-ton destroyers = 20,000 tons = 20 pts
4 2,850-ton submarines (improved) = 11,400 tons = 11 pts
4 2,000-ton type U46a submarines = 8,000 tons = 8 pts
4 420-ton R-class submarines = 1,680 tons =2 pts

= 55 pts


All ready in 9 months except for Svierge-class, which requires 1 year of construction
Q1-1925 projects that are now complete

Construction and Research

Aside from the yearly projects,
60 pts into construction of "Phase 2" Inka habitats

Army

Accelerated production of Model-1918 submachinegun - 15 pts

Air

Sopwith Siskin - 100 [10 pts]
Supermarine Southhampton - 10 [5 pts]
Torpedo Bomber - 80 [8 pts]
Constructing Vickers Victoria Prototype Airframe - 2 [10 pts]
Constructing Autogyro Prototypes - 4 [4 pts]
F8C Prototypes - 4 [4 pts]

Total Air Construction: 40 pts
New Q2 Projects

Air

Sopwith Siskin - 100 - [10 pts]
Torpedo Bomber - 40 [4 pts]
Supermarine Southampton - 4 [2 pts]
Foreign prototype - 5 pts
Evaluation of Vickers Victoria Prototype Airframes - 1 pt
Evaluation of F8C Prototypes - 1 pt
Constructing further Autogyro Prototypes - 4 [4 pts]
Fighter replacements - 1 pt
Larger aircraft replacements - 2 pts

Total = 30 pts

Army

Continued acceleration of submachinegun production - 10 pts
Acceleration of Model 1897 trench shotgun production - 5 pts
Funding and contribution of engineers to foreign prototype - 5 pts
Initiating improved anti-tank mine research - 5 pts

Total = 25 pts
Last edited by Evincer on 2009-11-21 11:46am, edited 6 times in total.
User avatar
Master_Baerne
Jedi Council Member
Posts: 1984
Joined: 2006-11-09 08:54am
Location: Wouldn't you like to know?

Re: SDN World 3 Construction Queue Thread

Post by Master_Baerne »

French Republic
675 Industrial Points

Army Expenditures:
45x Infantry Brigades to Mechanized Status; 135 points, Q1 1929
TOTAL: 135 Points

Navy Expenditures:
2x Richelieu-Class Fast Battleship; 49 points; 49 200 tons, Q1 1930
4x Admiral-Class Battlecruiser; 45 points; 45 200 tons, Q1 19230
10x Suffren-Class Cruiser; 10 points; 10 000 tons, Q1 1929
TOTAL: 378 Points

Air Force Expenditures:
150x bomber monoplane 1927 - 15 points
100x dive bomber 1925 - 10 points
150x fighter monoplane 1927 - 15 points
50x transport 1928 - 5 points
TOTAL: 45 Points
Military Expenditures Subtotal: 558 Points

German Canal Project: 50 Points; ongoing
Aerodrome Construction: 67 Points; ongoing

TOTAL EXPENDITURES: 675 Points
Last edited by Master_Baerne on 2010-05-15 10:01am, edited 11 times in total.
Conversion Table:

2000 Mockingbirds = 2 Kilomockingbirds
Basic Unit of Laryngitis = 1 Hoarsepower
453.6 Graham Crackers = 1 Pound Cake
1 Kilogram of Falling Figs - 1 Fig Newton
Time Between Slipping on a Banana Peel and Smacking the Pavement = 1 Bananosecond
Half of a Large Intestine = 1 Semicolon
User avatar
Czechmate
Jedi Knight
Posts: 656
Joined: 2008-08-11 08:59am
Location: das volkische republik von canadische
Contact:

Re: SDN World 3 Construction Queue Thread

Post by Czechmate »

Nordic Union - Q1 (Winter), 1925

525ibp

Navy - 170ibp
1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)

Army - 290ibp
Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)

Air Force - 65ibp
260 Boeing FB - 26pts (completing Q2 1925)
120 Boeing DT - 24pts (completing Q2 1925)
3 Zeppelins - 15pts (completing Q3 1925)
Last edited by Czechmate on 2009-11-27 09:12pm, edited 5 times in total.
tiny friendly crab.
User avatar
RogueIce
_______
Posts: 13387
Joined: 2003-01-05 01:36am
Location: Tampa Bay, Florida, USA
Contact:

Re: SDN World 3 Construction Queue Thread

Post by RogueIce »

United States of America - Q1 FY1925

Total: 550 IBPs (5 IND/5 ECON)

National Projects
100 IBPs to Air Tech 4
100 IBPs to Army Tech 4

United States Navy
Fitting out Omaha class CL (7050t): 0.3525 (Completed FEB 1925)
Fitting out South Dakota class BB (43200t): 2.16 (Complete AUG 1925)
Building South Dakota class BB (43200t): 43.2 (Construction complete AUG 1925; Fitting out complete AUG 1926)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)

TOTAL: 368.1125 / 550
Last edited by RogueIce on 2009-12-04 05:06pm, edited 8 times in total.
Image
"How can I wait unknowing?
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)

"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
User avatar
K. A. Pital
Glamorous Commie
Posts: 20813
Joined: 2003-02-26 11:39am
Location: Elysium

Re: SDN World 3 Construction Queue Thread

Post by K. A. Pital »

Soviet Union - year 1925

Industrial Points: 400 per quarter.

1925, Q2: Massive mobilization. 400 + 300 = 700 IBPs per quarter.

Maintenance: Q1 - 26, Q2 - 51, Q3 - 51.

Q1 - 9 IBP for Navy, 13 IBP for active and called-up Army, 4 IBPs for the Air Forces.
Q2 - 9 IBP for Navy, 38 IBP for active and called-up Army, 4 IBPs for the Air Forces.
Q3 - 9 IBP for Navy, 38 IBP for active and called-up Army, 4 IBPs for the Air Forces.

Naval Buildup: Q1 - 83, Q2 - 83, Q3 - 83,

- Outfitting launched battleship SNS Ivan Bubnov: 48 kt x 4 quarters (a total of 192 pt for the year)
- Rebuilding training ship "Ocean" into the carrier SNS Komsomolets: 12 kt x 4 quarters (a total of 48 pt for the year)
- Outfitting launched hull of battleship "Imperatritsa Maria", converted into the carrier SNS Sokol: 23 kt x 4 quarters (a total of 92 pt for the year)

Army Buildup: Q1 - 30, Q2 - 60, Q3 - ~200 (reflecting the continuing training of almost all mobilized units, hence still carrying the expenditures)

- 1500 Renault Russian Tanks for 10x Armored Brigades - 100 points (included in costs below)

Raising units, Q1: 30
30 reserve divisions to full strength - 30 points. Special Far Eastern Army.

Raising units, Q2: 60
30 reserve divisions to full strength - 30 points. Special Far Eastern Army.
10 reserve divisions to full strength - 10 points. Siberian Military District.
20 reserve divisions to full strength - 20 points. Central Asian Military District.

Mobilization: 149 points
Moscow: 23 points (5x 50% complect divisions to full strength - 3 points, 20x reserve rifle 10% complect divisions to full strength - 20 points)
Leningrad: 22 points (3x 50% complect divisions to full strength - 2 points, 20x reserve rifle 10% complect divisions to full strength - 20 point)
Belorusso-Baltic Military District: 33 points (5x 50% complect divisions to full strength - 3 points, 30x reserve rifle 10% complect divisions to full strength - 30 points)
Ukrainian Military District: 35 points (10x 50% complect divisions to full strength - 5 points, 30x reserve rifle 10% complect divisions to full strength - 30 points)
North Caucases Military District: 7 points (4x 50% complect divisions to full strength - 2 points, 5x reserve rifle 10% complect divisions to full strength - 5 points)
Volga Military District: 24 points (8x 50% complect divisions to full strength - 4 points, 10x reserve rifle 10% complect divisions to full strength - 10 points, 10x reserve cavalry divisions to full strength - 10 points)

Activation of all 20 territorial reserve regiments: 5 points (equal to 5 divisions' worth of manpower).

Formation of 10x new armored brigades and production of 1500 Renault Russian light tanks for it: 100 points

Total Q2 activation expenditures: 319 points.

Raising units, Q3: none.

Airforce buildup: Q1 - 17, Q2 - 9, Q4 - 1.

Q1 1925: 17 points
110 R-1 - 11 points.
30 R-2 - 3 points
1 Tupolev ANT-3 (R-3) - 1 points (tenfold expenses for prototypes)
1 Tupolev ANT-4 (TB-1) - 2 points (tenfold expenses for prototypes)

Q2 1925: 24 points
1 Polikarpov MR-1 - 1 points (conversion of R-1 to seaplane)
30 R-1 - 3 points.
200 R-2 - 20 points.

1x Tupolev ANT-4 (TB-1) - 2 points for second prototype (paid for by Evincer as joint investment)

Q4 1925: 1 point
1 Tupolev ANT-3 (R-3) - 1 points (tenfold expenses for prototypes)

Year totals: 38 points
200 R-1 - 20 points.
130 R-2 - 13 points.
2 Tupolev ANT-3 (R-3) - 2 points (tenfold expenses for prototypes)
1 Tupolev ANT-4 (TB-1) - 2 points (tenfold expenses for prototypes)
1 Polikarpov MR-1 - 1 points (conversion of R-1 to seaplane)

Various industrial investments:
- Volkhov dam - upgrading from 58 MWt to 66 MWt (included in overall GOELRO expenditure).
- Shatura powerplant - launch. Power: 2x16 MWt turbines in 1925 (included in overall GOELRO expenditure).
- Total GOELRO plan (construction and expansion of energy plants): so far planned 1750 MWt over the course of 15 years. Cost - 175 points total, or 12 points every year and 3 points every quarter.

Industrial investment in Tech Level Upgrade:
1925, Q1: 100 points (fullmetal aircraft; railway rolling bearings; metals and alloys; gun engineering; engine and turbine research)
1925, Q2: 100 points (fullmetal aircraft; railway rolling bearings; metals and alloys; gun engineering; engine and turbine research)

Industrial investment in Infrastructure Upgrade:
1925, Q1: 100 points (railways 60%, channels, sea and river water transport 20%, roads 20%).
1925, Q2: 100 points (railways 60%, channels, sea and river water transport 20%, roads 20%).

Industrial lease or gift points to other nations for military or overall economic assistance:
TBD

Industrial investment in Industry level upgrade:
Q1: 20 IBP
Q2: 20 IBP
Q3: 20 IBP
Q4: 20 IBP
Totals wrote:Points unused by the USSR (reflecting deficiencies and excess industrial capacity not fully utilized):
1st quarter 1925: 21 pt = 400 - 26 - 83 - 30 - 17 - 3 - 100 - 100 - 20
2nd quarter 1925: 10 pt = 700 - 51 - 83 - 319 - 24 - 3 - 100 - 100 - 20
3rd quarter 1925: TBD
Last edited by K. A. Pital on 2009-12-07 01:43am, edited 20 times in total.
Lì ci sono chiese, macerie, moschee e questure, lì frontiere, prezzi inaccessibile e freddure
Lì paludi, minacce, cecchini coi fucili, documenti, file notturne e clandestini
Qui incontri, lotte, passi sincronizzati, colori, capannelli non autorizzati,
Uccelli migratori, reti, informazioni, piazze di Tutti i like pazze di passioni...

...La tranquillità è importante ma la libertà è tutto!
Assalti Frontali
User avatar
Norade
Jedi Council Member
Posts: 2424
Joined: 2005-09-23 11:33pm
Location: Kelowna, BC, Canada
Contact:

Re: SDN World 3 Construction Queue Thread

Post by Norade »

Portuguese Production Log - 1925

Industrial Points:
Quarterly: 525
Used First Quarter: 515.3
Used Second Quarter: 519.7
Used Third Quarter: 524.8
Used Forth Quarter: 524.8


Domestic Projects: 20 points per quarter
-Health care research 5 IBP per quarter starting in Q2.
-Education funding, 5 IBP per quarter starting in Q2.
-Welfare, 10 IBP per quarter starting in Q2.


Naval Projects: 395.7 points per quarter
-Two 25kt hulls being converted to carriers, conversion started in 1923, in final fitting stage [Expected commission date: third quarter 1925] (2.5 points per quarter)
-Two 50kt Gigante-class Dreadnoughts, Laid in 1923, in final fitting/sea trial stage [Expected commission date: first quarter 1926] (5 points per quarter)
-Two 50kt Gigante-class Dreadnoughts, Laid in 1924, in hull construction stage [Expected commission date: first quarter 1927] (100 points per quarter)
-Four 26.3kt Intervenção-class Battleships, Laid in 1924, in hull construction stage [Expected commission date: first quarter 1927] (105.2 points per quarter)
-One 23.2kt Cidade-class Battleships, Laid in Q1 1925, in hull construction stage [Expected commission date: first quarter 1927] (23.2 points per quarter)
-Four 22kt Portugal-class Dreadnoughts undergoing a modernization, started in 1925, in initial phase [Expected re-commission date: forth quarter 1926] (88 points per quarter)
-Twenty 2.5kt Cruiser-class submarines, started in 1925, in initial phase [Expected commission date: fourth quarter 1925] (50 points per quarter)

Army Projects: 100 points per quarter, 100 points for the year
-Motorization of three artillery brigades [Expected completion date: first quarter 1926] (30 points, Q1)
-Creation of one armored brigade [Expected completion date: first quarter 1926, first quarter 1927 for maximum effectiveness] (10 points, Q1)
-Motorization of three artillery brigades [Expected completion date: second quarter 1926] (30 points, Q2)
-Creation of one armored brigade [Expected completion date: second quarter 1926, second quarter 1927 for maximum effectiveness] (10 points, Q2)

Air Projects: 28.4 points per quarter, 14.4 points for the year
-Twelve Fábrica F 1 flights [Expected completion date: first quarter 1925] (14.4 points, Q1) *Done*
-New Prototype fighter design [Expected project completion date: ???] (2 points, Q1)
-New Prototype bomber design [Expected project completion date: ???] (10 points, Q1)
-Two Fábrica AG 1 flights [Expected completion date: second quarter 1925] (2 IBP, Q2) *Done*
-Twelve Fábrica F 1 flights [Expected completion date: second quarter 1925] (14.4 points, Q2)

Military Research:
-Research into rotary winged aircraft [No projected completion date at this time.] (27 IBP starting in Q2, 20 IBP a quarter starting in Q3) [7 IBP from Spain]
-Research in jet engine design [No projected completion date at this time.] (20 IBP starting in Q2)
-Research in rocketry [No projected completion date at this time.] (15 IBP starting in Q2)
-Aircraft research [20 IBP starting in Q3]
-Naval research [6 IBP, starting in Q3]
-Tank research [5 IBP, starting in Q3]
-Small Arms research [5 IBP, starting in Q3]
Last edited by Norade on 2009-12-06 12:02am, edited 15 times in total.
School requires more work than I remember it taking...
User avatar
Fingolfin_Noldor
Emperor's Hand
Posts: 11834
Joined: 2006-05-15 10:36am
Location: At the Helm of the HAB Star Dreadnaught Star Fist

Re: SDN World 3 Construction Queue Thread

Post by Fingolfin_Noldor »

Byzantine Empire

Industrial Points: 550points per quarter, 2200points per year

R&D and National Projects

1925Q1

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date January 1927, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia: 20 points

Total: 295 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
T-35 analogue prototype = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 111 points

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 28 points

Navy

4 carrier fighter bomber prototypes = 4 points (type to be determined)
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 2.5*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in construction till end Q1 1925 - 16.9*4 = 67.6 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) till end Q3 1925 = 16 points
General research = 10 points (e.g. torpedoes, guns etc.)

Total points: 115.6 points

Total: 549.6 points

1925Q2

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date January 1927, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia: 20 points

Total: 295 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
T-35 analogue prototype = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 111 points

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 30 points

Navy

4 carrier fighter bomber prototypes = 4 points (type to be determined)
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in construction till end Q3 1925 = 16 points
12 destroyers laid down (Chacal class, using 5"/38 guns, 40mm/39 guns, 20mm/40 guns.) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4
General research = 10 points (e.g. torpedoes, guns etc.)

Total points: 113.22 points

Total: 549.6 points
Last edited by Fingolfin_Noldor on 2010-01-02 12:48am, edited 32 times in total.
Image
STGOD: Byzantine Empire
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
User avatar
Ryan Thunder
Village Idiot
Posts: 4139
Joined: 2007-09-16 07:53pm
Location: Canada

Re: SDN World 3 Construction Queue Thread

Post by Ryan Thunder »

I'm going to mechanize as much of the Third Army Group as I can.
SDN Worlds 5: Sanctum
User avatar
Shinn Langley Soryu
Jedi Council Member
Posts: 1526
Joined: 2006-08-18 11:27pm
Location: COOBIE YOU KNOW WHAT TIME IT IS

Re: SDN World 3 Construction Queue Thread

Post by Shinn Langley Soryu »

Southeast Asian Union

GAME STATS

Basic industrial points: Industry 4 = 400 points / quarter
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 420 points / quarter during peacetime, 800 points / quarter during wartime

CONSTRUCTON ORDERS (Q1 1925)

Army

Upgrade to army tech level 4 = 60 IBPs (complete January 1927)

Air Force

Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started March 1925, construction complete April 1925)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started March 1925, construction complete April 1925)

Navy

18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBPs each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
2 x Independencia class aircraft carrier (Lexington class aircraft carrier analogue; 38,746 tons standard, 38.7 IBPs each) = 3.8 IBPs (laid down July 1922, construction complete July 1924, trials complete July 1925)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)

Industrial

Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)

CONSTRUCTON ORDERS (Q2 1925)

Army

Upgrade to army tech level 4 = 60 IBPs (complete January 1927)

Air Force

Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started June 1925, construction complete July 1925)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started June 1925, construction complete July 1925)

Navy

18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBPs each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
2 x Independencia class aircraft carrier (Lexington class aircraft carrier analogue; 38,746 tons standard, 38.7 IBPs each) = 3.8 IBPs (laid down July 1922, construction complete July 1924, trials complete July 1925)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)

Industrial

Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)

CONSTRUCTON ORDERS (Q3 1925)

Army

Upgrade to army tech level 4 = 60 IBPs (complete January 1927)
Reactivation of I-V Marine Expeditionary Forces + Caroline Islands Garrison = 16 IBPs (complete January 1926)

Air Force

Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started September 1925, construction complete October 1925)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started September 1925, construction complete October 1925)

Navy

18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1925, construction complete April 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)

Industrial

Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)

CONSTRUCTON ORDERS (Q4 1925)

Army

Upgrade to army tech level 4 = 60 IBPs (complete January 1927)
Reactivation of I-V Marine Expeditionary Forces + Caroline Islands Garrison = 16 IBPs (complete January 1926)

Air Force

Upgrade to air force tech level 4 = 60 IBPs (complete January 1927)
12 x Blackburn Dart [1921 torpedo bomber] = 1.2 IBPs (construction started December 1925, construction complete January 1926)
24 x Gloster Sparrowhawk [1921 fighter] = 2.4 IBPs (construction started December 1925, construction complete January 1926)

Navy

18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 3.2 IBPs (laid down January 1925, construction complete October 1925, trials complete January 1926)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1925, construction complete April 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)

Industrial

Industrial improvements = 80 IBPs (+20 IBPs starting January 1926)
Last edited by Shinn Langley Soryu on 2010-01-20 05:43pm, edited 7 times in total.
I ship Eino Ilmari Juutilainen x Lydia V. Litvyak.

Image
ImageImageImage
Phantasee: Don't be a dick.
Stofsk: What are you, his mother?
The Yosemite Bear: Obviously, which means that he's grounded, and that she needs to go back to sucking Mr. Coffee's cock.

"d-did... did this thread just turn into Thanas/PeZook slash fiction?" - Ilya Muromets[/size]
User avatar
Minister of Pigeonry
Youngling
Posts: 105
Joined: 2009-10-22 12:45am

Re: SDN World 3 Construction Queue Thread

Post by Minister of Pigeonry »

Kingdom of Spain

Industrial Points Totals:
Industry: 3
Economy: 3
- (Peacetime): 300 Points
- (Wartime Mobilized): 525 Points

Q4, October-December 1925 - Total Points Used: 300
General Allotments:

Industrial Base Investment
Total: 10 Points (Began: Q2, 1925 - Completion: Ongoing)

Caribbean Territory Improvement Projects
Total: 10 Points (Began: Q4, 1925 - Completion: Ongoing)

Navy Budget Allotments:

"Even Acquisition Plan" - Spanish-German Naval Cooperation Agreement

Vessels to be built in Spain:
- 2x Fransisco Pizzaro-Class 40kt Battleships - 2x Royal Arsenal Shipyards, Ferrol
- 1x Ferdinand II-Class 40kt Battlecruiser - 1x Royal Arsenal Shipyards, Ferrol
Cost: 120

Vessels to be built in Germany:
- 2x Fransisco Pizzaro-Class 40kt Battleships - 1x Naval Shipyard, Bremerhaven - 1x Germaniawerft, Kiel
- 1x Ferdinand II-Class 40kt Battlecruiser - 1x Vulcan Stettin
Cost: 132 (10% Mark up on Vessels built in German Yards)

Total Cost for EAP: 264.6 Points (1925-1927)
- 252 Points - Construction (Began: Q1, 1925 - Completion: December 1926)
- 12.6 Points - Trials/Fitting Out (Begins: Q1, 1926 - Completion: December 1927)

Yard Usage:
3x 25k-40k Yards in Spain
3x 25k-40k Yards in Germany


"Seaplane Carrier Project"

- 1x Semental Volador-Class 15kt Seaplane Carrier (Details Pending) - 1x Royal Arsenal Shipyards, Ferrol

Total Cost for Project: 15.75 Points (1925-1927)
- 15 Points - Construction (Began: Q1, 1925 - Completion: April 1926)
- .75 Points - Trials/Fitting Out (Completion: October 1926)

Yard Usage:
15kt of Yard Space out of 180,000T


Submarine Technology Research Studies
Total Cost: 10 Points (Began: Q1, 1925 - Completion: On Hold)


‘Air Force’ Allotments:

General Military Aviation Research (Progress toward Tech 4 A.F.)
Total: 6 Points (Began: Q1, 1925 - Completion: Ongoing)

Autogyro/Helicopter Joint R&D with Portugal and Germany
Total: 7 Points (Began: Q2, 1925 - Completion: Ongoing)

‘Army’ Allotments:


EDIT: Altered to reflect removal of maintenance costs.
Last edited by Minister of Pigeonry on 2009-12-29 12:49pm, edited 11 times in total.
User avatar
Raesene
Jedi Master
Posts: 1341
Joined: 2006-09-09 01:56pm
Location: Vienna, Austria

Re: SDN World 3 Construction Queue Thread

Post by Raesene »

Available per Quarter: 420pts

Infrastructure: 20 General improvement to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and aborad
total 40pts
(Purpose is of course to increase the point value after some time)


Research

towards Air focus 3: 20
towards Army focus 4: 20
total 40pts


Indian Ocean Operation Costs 3 points, representing increased wear and tear as well as ships used for resupply ?

Ship Construction
  • type |# building |pts/ship |pts/class |Q in construction/ of total time
    BB |2x Patria |50 |100 |Quarter 1/8 |2 Patria-class; new ships
    BB |1x Oceano |48 |48 |Quarter 6/8 |1 Il Principe-class
    BC |1x Lepanto |33 |33 |quarter 8/8 |1 Medici-class
    CA |1x Sangro |17 |17 |quarter 5/5 |1 Tevere-class
    CV |1x Cigno |22 |22 |quarter 1/5 |1 as HMS Courageous
    CV |1x Albatro |22 |22 |quarter 1/5 |1 as HMS Courageous
    DD |12x Alkali et… |3 |36 |quarter 1/3 |new DDs
    SS |14x long range |1 |14 |quarter 1/3
    total 292 pts
Point cost of ships on trial/fitting out: 5.6 (1 BB; ready in July 1925; 2 CAs ready in March 1925, 1 CV ready in February 1925): 5.6 pts

Aircraft: # Sq|type |pts/sq |pts /type|
3 Squadron |Blackburn Dart |1 |3 |Bomber; 1 Sq. ready per month
6 Squadrons |Fairey Flycatcher |1 |6 |Fighter; 2 Sq. ready per month
Prototype |Fairey Horsely |1 |3 |Bomber/Recon; 3 aircraft; one wooden, one mixed and one completely metal

total 12


Used so far: 392.6

This list isn't completed yet, I'll build some more and also upgrade some army units.

EDIT: sorry ! made a mistake when creating the spreadsheet and -as Stas supposed - I entered 1pt/10k instead of for 1k. Hope the vertical lines Is there a way to format a table in this system ?
EDIT of EDIT: I will check my entries and formulae in excel more closely...
Last edited by Raesene on 2009-11-19 01:46pm, edited 4 times in total.

"In view of the circumstances, Britannia waives the rules."

"All you have to do is to look at Northern Ireland, [...] to see how seriously the religious folks take "thou shall not kill. The more devout they are, the more they see murder as being negotiable." George Carlin

"We need to make gay people live in fear again! What ever happened to the traditional family values of persecution and lies?" - Darth Wong
"The closet got full and some homosexuals may have escaped onto the internet?"- Stormbringer

User avatar
CmdrWilkens
Emperor's Hand
Posts: 9093
Joined: 2002-07-06 01:24am
Location: Land of the Crabcake
Contact:

Re: SDN World 3 Construction Queue Thread

Post by CmdrWilkens »

Industrial Projects of the Mexican Empire

Industry Level: 5 (Econ 4 +5% bonus)
525 pts available
520 In Use


Q4 1925 Current Projects

Army: (72)
  • Upgrades: (18)
    • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
    Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
    Acquisitions:

    Navy: (350)
    • Slipways: (130)
      • Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
        Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
        Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
      Acquisitions: (220)
      • Four (4) Majestuoso class Battlecruisers: 220pts [(4 ships at 54.9 kt with 1pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]

    Air Force (16)
    Acquisition: (16)
    • 80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)

    Other: (80)
    • Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
      Shore Based HF/DF installations: 20pts (Started Q3 1925, ongoing)
      Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)
    ============================================================
    Q3 WARTIME Production [Started Q3 1925]
    478 IBPs (1000 total available - 522 continuing Q3 items)

    477.4 IBPs in use

    Army: (311)
    • Acquisitions: (14)
      • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization
        7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
      Upgrades: (297)
      • Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]

    Navy: (138.4)
    • Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
      Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
      Eight (8) San Juan-class Cruisers [(10 ships at 9.4kt with 1pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]

    Air Force: (28)
    • One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
      One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)


    ============================================================
    Completed Items
    As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)


    =======================
    Q2 1985:
    Army:

    Navy:

    Air Force:
    • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
      80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
    Other:

    =======================
    Q3 1825:
    Army:
    • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
      III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
    Navy:

    Air Force:
    • 160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
    Other:
    Last edited by CmdrWilkens on 2010-01-07 12:00pm, edited 19 times in total.
    Image
    SDNet World Nation: Wilkonia
    Armourer of the WARWOLVES
    ASVS Vet's Association (Class of 2000)
    Former C.S. Strowbridge Gold Ego Award Winner
    MEMBER of the Anti-PETA Anti-Facist LEAGUE

    "I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
    -Kingdom of Heaven
    User avatar
    Beowulf
    The Patrician
    Posts: 10621
    Joined: 2002-07-04 01:18am
    Location: 32ULV

    Re: SDN World 3 Construction Queue Thread

    Post by Beowulf »

    Manchuria

    525 pts/qtr

    Q1/1925
    National projects:
    48pts economy improvement

    Army:
    Units:
    Activation of:
    1st - 9th Reserve Infantry Corps, Heilongjiang province 4 pts/Corps = 36 pts
    3nd Fortress Corps, Heilongjiang province 3pt/Div * 5 Div = 15 pts
    51 pts

    4 Armored Brigades (for upgrade of secondary reserve Corps)
    40 pts

    Aircraft:
    100 J-2 - 10 points
    100 Q-2 - 10 points
    9 Q-3 - 9 points (prototype)

    Metal aircraft development - 7
    Wasp Radial engine development - 3 pts
    39 pts


    Fortresses:
    Defense line Yat densification:
    Hailar He/Heilongjiang Section - 4 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 44 pts

    Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts

    55pts total

    Navy:
    Slipway improvements:
    1 new 70kton slips - 25 points complete Winter 1927 - Lushunko Naval Shipyard
    1 40kton slip upgrade - 10 points, complete Winter 1927- Incheon Naval Shipyard
    35pts total

    Ships:
    4 CA1923 - 2.5pts/qtr ea 8/8 complete 0/4 fitting out
    2 BB1925 - 40 pts/qtr ea 0/8 complete
    2 CA1925 - 53 pts/qtr ea 0/8 complete
    4 CS1923 - 12.1 pts/qtr ea 0/5.33 complete
    4 DD1923 - 1.2 pts/qtr 0/3 complete

    252.6pts total

    Aircraft:
    10 Q-2 - 1 pt

    Remaining 11.4 pts

    Q2/1925
    1000 pts available

    National projects:
    48pts economy improvement

    Army:
    Units:
    Activation of:
    1st - 9th Reserve Infantry Corps, Heilongjiang province 4 pts/Corps = 36 pts
    3nd Fortress Corps, Heilongjiang province 3pt/Div * 5 Div = 15 pts
    51 pts

    5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
    Artillery Brigade motorization - 3 points 0/4
    3 Infantry division motorization - 9 points ea - 27 points 0/4
    +1 Armor Regiment - 10 points 0/4
    40 points


    4 Armored Brigades (for upgrade of secondary reserve Corps) 0/4
    40 pts

    4 Motorized Corps
    Motor Artillery Brigade - 6 points 0/4
    3 Motor Infantry division - 9 points ea - 27 points 0/4
    +1 Armor Regiment - 10 points 0/4
    172 pts


    4 Infantry Corps
    Artillery Brigade - 3 points 0/4
    3 Infantry division - 2 points ea - 27 points 0/2
    +1 Armor Regiment - 10 points 0/4
    76 pts


    International Volunteer Division - 3 pts 0/2

    382 pts total

    Aircraft:
    210 J-2 - 21 points
    210 Q-2 - 21 points
    Metal aircraft development - 7
    Wasp Radial engine development - 3 pts
    52 pts

    Fortresses:
    Defense line Yat densification
    Hailar He/Heilongjiang Section - 4 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 44 pts 1/4 complete

    Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts 1/4 complete
    55pts total

    Navy:
    Slipway improvements:
    1 new 70kton slips - 25 points, 1/8 complete Winter 1927 - Lushunko Naval Shipyard
    1 40kton slip upgrade - 10 points, 1/8 complete Winter 1927- Incheon Naval Shipyard
    35pts total

    Ships:
    4 CA1923 - 2.5pts/qtr ea 8/8 complete 1/4 fitting out
    2 BB1925 - 40 pts/qtr ea 1/8 complete
    2 CA1925 - 53 pts/qtr ea 1/8 complete
    4 CS1923 - 12.1 pts/qtr ea 1/5.33 complete
    4 DD1923 - 1.2 pts/qtr 1/3 complete

    252.6pts total

    Aircraft:

    Over SML limit penalty: 3% of base = 15 points

    Remaining 160.4 pts
    Last edited by Beowulf on 2009-12-06 12:52am, edited 3 times in total.
    "preemptive killing of cops might not be such a bad idea from a personal saftey[sic] standpoint..." --Keevan Colton
    "There's a word for bias you can't see: Yours." -- William Saletan
    User avatar
    Akhlut
    Sith Devotee
    Posts: 2660
    Joined: 2005-09-06 02:23pm
    Location: The Burger King Bathroom

    Re: SDN World 3 Construction Queue Thread

    Post by Akhlut »

    500 points/quarter

    Army
    Upgrading 10 Reservists to Motorized Infantry: 100 Points
    Upgrading 10 Active Cavalry Brigades to Armored: 25 Points/Quarter
    10 Armored Recon Batallions: 5 Points/Quarter
    Air Force Research: 20 Points
    Tank Research: 20 Points
    Weapons Research: 15 Points
    Increase in Weapon Production: 80 Points
    Bomber Production (1926): 10 Points
    Fighter Production (1926): 10 Points
    Weapon Production sent to USSR: 75
    Army Total: 330 Points


    Mining Improvements: 30 Points
    Railroad Improvements: 30 Points
    Electrification Improvements: 30 Points
    Fortification Improvements: 30
    Economy: 50 Points
    Total: 140 Points

    Grand Total: 500 Points
    Remaining Points: 0
    Last edited by Akhlut on 2010-01-21 10:21pm, edited 2 times in total.
    SDNet: Unbelievable levels of pedantry that you can't find anywhere else on the Internet!
    User avatar
    loomer
    Sith Marauder
    Posts: 4260
    Joined: 2005-11-20 07:57am

    Re: SDN World 3 Construction Queue Thread

    Post by loomer »

    April, 1925, People's Republic of Afghanistan:
    200 available

    Army:
    Infantry Weapons research, 5 points
    Artillery design funding, 10 points
    Force maintenance: 2.5 for AF, 2.5 for active military, 2 for reserves

    Total: 23

    Infrastructure:
    National roadwork construction, 25 points
    Electrical Grid for Kabul maintenance, design, and construction, 15 points
    Radio research and Kabul Broadcasting Agency establishment, 15 points

    Total: 55

    Economy:
    Oil exploration and drilling programs, 30 points
    Gold and gem mining programs, 20 points

    Total: 0

    Industry:
    General industrial improvements and construction, 50 points

    Total: 50

    Fortifications:
    Initial fort constructions along Sheppo border (one 3 miles north of the border in Helmand, on a kilometre tall mountain/hill. It's an artillery fort (coords 29,29'7.22N 63,8'57.92E, Fort Akmar. It gets 10 points because its out of the way) (The other is situated 53 miles South-East of Kabul, in a mountain pass. 33,58'57.65N, 69,52'20.22E) 19 points
    Russian border outpost construction, 12 points
    Total: 32

    Other:


    Remainder: 3 points

    Edit: Second revision.
    Last edited by loomer on 2009-12-02 12:42am, edited 7 times in total.
    "Doctors keep their scalpels and other instruments handy, for emergencies. Keep your philosophy ready too—ready to understand heaven and earth. In everything you do, even the smallest thing, remember the chain that links them. Nothing earthly succeeds by ignoring heaven, nothing heavenly by ignoring the earth." M.A.A.A
    User avatar
    Coyote
    Rabid Monkey
    Posts: 12464
    Joined: 2002-08-23 01:20am
    Location: The glorious Sun-Barge! Isis, Isis, Ra,Ra,Ra!
    Contact:

    Re: SDN World 3 Construction Queue Thread

    Post by Coyote »

    The Yishuv


    Yearly Stipend: 200 IBPs (Industry of 2) + 30 (Econ of 3) = 230 IBPs per year.
    Military cost per year: 86 IBPs.
    Remaining IBPs for year: 144
    IBPs divided into quarterly allocations: 36 per quarter

    Current Projects:
    Coastal Railroad, 20 IBPs for 2Q 1925 (8 quarters projected)
    Factory Upgrades, 10 IBPs for 2Q 1925 (1-time cost to buy industrial equipment from Europe)
    Remaining: 6 IBPs being used for ongoing maintenance to barely-adequate electric & plumbing grid, roadways, streetcars, etc.
    Something about Libertarianism always bothered me. Then one day, I realized what it was:
    Libertarian philosophy can be boiled down to the phrase, "Work Will Make You Free."


    In Libertarianism, there is no Government, so the Bosses are free to exploit the Workers.
    In Communism, there is no Government, so the Workers are free to exploit the Bosses.
    So in Libertarianism, man exploits man, but in Communism, its the other way around!

    If all you want to do is have some harmless, mindless fun, go H3RE INST3ADZ0RZ!!
    Grrr! Fight my Brute, you pansy!
    User avatar
    Agent Sorchus
    Jedi Master
    Posts: 1143
    Joined: 2008-08-16 09:01pm

    Re: SDN World 3 Construction Queue Thread

    Post by Agent Sorchus »

    Sudan Blue Sultanate
    Q1
    ships
    Ishmael class BC x3 from Q1 of 1924 to Q4 1925 . . . . . . . . .78Ibp
    Shakir class BB x2 from Q1 1924 to Q4 1925 . . . . . . . . . . . .100IBp
    4 Junayed class CL x4 from Q1 1925 to Q4 1925 . . . . . . . . . . 18.4IBp
    4 Junayed class in fitting out from Q1 1925 to Q2 1925 . . . . . 9/10IBp
    Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197.3IBps

    10 Heavy Bombers . . . . . . . . . . . 5 IBp
    110 Fighters . . . . . . . . . . . . . . .11 IBp

    Maintenence
    • Navy 12points
      Air 2.4
      Active 6.3
      Reserve 5
    Port refurbishment 42 IBp [6 Quarters]
    60 IBp 6x 100 MWt electric plants [8Q]
    30 IBp for new oil field digging [4Q]
    15 for new oil refineries [6Q]
    15 new Rail-lines [4Q]

    Grand Total . 400IBp

    Q2
    ships
    Ishmael class BC x3 from Q1 of 1924 to Q4 1925 . . . . . . . . .78Ibp
    Shakir class BB x2 from Q1 1924 to Q4 1925 . . . . . . . . . . . .100IBp
    4 Junayed class CL x4 from Q1 1925 to Q4 1925 . . . . . . . . . . 18.4IBp
    4 Junayed class in fitting out from Q1 1925 to Q2 1925 . . . . . 9/10IBp
    Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197.3IBps

    160 Fighters . . . . . . . . . . . . . . .16 IBp

    Maintenence
    • Navy 12points
      Air 2.4
      Active 6.3
      Reserve 5
    Port refurbishment 42 IBp [5 Quarters]
    60 IBp 6x 100 MWt electric plants [7 Q]
    30 IBp for new oil field digging [3Q]
    15 for new oil refineries [5Q]
    15 new Rail-lines [3Q]

    Grand Total . 400IBp
    User avatar
    Steve
    Emperor's Hand
    Posts: 9774
    Joined: 2002-07-03 01:09pm
    Location: Florida USA
    Contact:

    Re: SDN World 3 Construction Queue Thread

    Post by Steve »

    I've decided it might be better if we post new construction queues so to better keep track of what we've built. You can still edit up until it is "due".

    My mini-update, not actually due until later this week, for May, to account for launching my final Sovereign and laying my third fast battleship.
    May 1925 Construction Queue

    Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550

    National Projects:

    Air Tech 4 = 20 10 IBPs
    Upgrading 2 25-40kT Slipways to 40-55kT 55-70kT capacity = 40 IBPs (Completion Date March 1927)
    Infrastructure Upgrades - Northern Australia Rail lines = 10 IBPs
    Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
    Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
    Future Investment Project = 10 IBPs

    Total Cost: 125 IBPs


    Army

    10 Activations of Reserve Infantry Divisions for Regular service = 10 IBPs, complete in August 1925
    Upgrading 3rd Australian Guards to Motorized Status = 9 IBPs, complete in February 1926, full effectiveness reduced until November 1926
    5 Reserve Infantry Divisions = 10 IBPs (Cost Date Completed 1 August 1925, unit effectiveness full in 1 August 1926)
    3 Motorized Infantry Divisions w/ Armored Recon Battalion = 33 IBPs (Cost Date completed February 1926, unit effectiveness 1 February 1927)
    1 Motorized Artillery Brigade = 6 IBPs, complete in February 1926, max effectiveness in February 1927

    Total Cost: 68 IBPs


    Navy


    10 Nez Perce-class (14,300t) = 151.2 IBPs (construction phase complete June-August 1925, full completion in February-April of 1926)
    6 Sovereign-class (50,428t) = 0 IBPs (construction phase complete in May of 1925, full completion in May 1926)
    6 Sovereign-class (50,428t) = 15.12 IBPs (fitting out phase, completion in March-April 1926)
    2 3 Defiant-class (55,000t) = 165 IBPs (construction phase complete in March 1927, full completion in March 1928)

    Total Cost: 331.32 IBPs


    Air Force


    4 prototype PF-4 biplane fighters = 4 IBPs(Completion July 1925)
    4 prototype BF-3 biplane bombers = 4 IBPs(Completion July 1925_
    40 PF-3 biplane fighters = 4 IBPs (Completion July 1925)
    12 8 T-1 transport aircraft = 4 IBPs (completion July 1925)
    20 10 RC-2 coastal patrol flying boats = 5 IBPs (completion July 1925)

    Total Cost: 21 IBPs

    Overall Expenditures: 545.32/550 IBPs
    ”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt

    "No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia

    American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.

    DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
    User avatar
    Raesene
    Jedi Master
    Posts: 1341
    Joined: 2006-09-09 01:56pm
    Location: Vienna, Austria

    Re: SDN World 3 Construction Queue Thread

    Post by Raesene »

    still to be fleshed out/recalculated/modified

    Available per Quarter: 420pts

    Infrastructure: 20 General improvement to railways, harbours, roads etc
    Economy: 20 focus on promoting Tuscan products in Europe and abroad
    total 40pts
    (Purpose is of course to increase the point value after some time; 20 spent last Q in Inf and Econ)


    Research

    towards Air focus 3: 20
    towards Army focus 4: 20
    total 40pts; 20 points spent last quarter on each



    Ship Construction; bolded vessels are laid down this quarter
    type |# building |pts/ship |pts/class |Q in construction/ of total time
    BB |1x Patria |50 | 50 |Quarter 2/8 | Patria-class under construction
    BB |1x Africa |50 | 50 |Quarter 2/8 | Patria-class under construction
    BB |1x Tasmania |50 | 50 |Quarter 1/8 |Patria-class under construction
    BB |1x Oceano |48 | 2.4 |Quarter 7/8 |1 Il Principe-class fitting out
    BC |1x Lepanto |33 | 0|quarter 8/8 |1 Medici-class finished
    CA |1x ? |17 |17 |quarter 1/5 |1 Tevere-class new ld under construction
    CA |1x ? |17 |17 |quarter 1/5 |1 Tevere-class new ld under construction
    CA |1x Sangro |17 | 0 |quarter 5/5 |1 Tevere-class finished
    CV |1x Cigno |22 |22 |quarter 2/5 |1 as HMS Courageous under construction
    CV |1x Albatro |22 |22 |quarter 2/5 |1 as HMS Courageous under construction
    DD |12x Alkali et… |3 |36 |quarter 2/3 |new DDs under construction
    SS |14x long range |1 |14 |quarter 2/3 under construction
    SS |7 x long range |3 |21 |quarter 1/3 new Submarines, Surcouf-type (3000 ts) under construction


    Point cost of ships on trial/fitting out: 2.4 for Oceano, battlecruiser, carrier and heavy cruiser are in service.


    Aircraft: # Sq|type |pts/sq |pts /type|
    3 Squadron |Blackburn Dart |1 |3 |Bomber; 1 Sq. ready per month
    6 Squadrons |Fairey Flycatcher |1 |6 |Fighter; 2 Sq. ready per month
    Prototype |Fairey Horsely |1 |3 |Bomber/Recon; 3 aircraft; one wooden, one mixed and one completely metal; repeat prototypes

    total 12
    total 376 so far

    "In view of the circumstances, Britannia waives the rules."

    "All you have to do is to look at Northern Ireland, [...] to see how seriously the religious folks take "thou shall not kill. The more devout they are, the more they see murder as being negotiable." George Carlin

    "We need to make gay people live in fear again! What ever happened to the traditional family values of persecution and lies?" - Darth Wong
    "The closet got full and some homosexuals may have escaped onto the internet?"- Stormbringer

    User avatar
    Czechmate
    Jedi Knight
    Posts: 656
    Joined: 2008-08-11 08:59am
    Location: das volkische republik von canadische
    Contact:

    Re: SDN World 3 Construction Queue Thread

    Post by Czechmate »

    Nordic Union - Q2 (Spring), 1925

    525ibp

    * denotes new build for this quarter

    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)

    Army - 290ibp
    Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)

    Air Force - 65ibp
    260 Boeing FB - 26pts (completing Q3 1925)*
    120 Boeing DT - 24pts (completing Q3 1925)*
    3 Zeppelins - 15pts (completing Q3 1925)

    Units Completed:
    260 Boeing FB - 26pts (completing Q2 1925)
    120 Boeing DT - 24pts (completing Q2 1925)
    tiny friendly crab.
    User avatar
    Lonestar
    Keeper of the Schwartz
    Posts: 13321
    Joined: 2003-02-13 03:21pm
    Location: The Bay Area

    Re: SDN World 3 Construction Queue Thread

    Post by Lonestar »

    1927Q1

    Navy
    2XCenturion-BB 92 (laid down Q2 1927, launch Q3 1928)
    2XMercury-BC 88 (laid down Q2 1927 launch Q3 1928)
    2XCenturion-BB 5-Fitting out
    2XMercury-BC 5-fitting out
    6XM1925-DD 8
    2XM1925CL 14
    6XM1926DL-12
    12XM1926MS-8
    3XM1926DMS-4
    1XM1926CV-20
    6XM1927(a)SS-6
    1XM1927"Large Vessel"-45


    30XPursuit Planes- 3
    30XTorpedo bomber-3
    20Xshore-based naval patrol-10

    Research

    Slot 1: 24" "Special longrange" torpedo.
    Started: Dec 1926
    Complete: Feb 1930

    Slot 2: Superheavy Naval Shells (15", 16" and 18" calibers)
    Started: Dec 1926
    Complete: Feb 1928

    Slot 3: Medium Tank M1927
    Started: Dec 1926
    Complete: Dec 1927

    Army
    Corps Motorization: 27
    New M1925 105mm SPG design=10 IBP
    Equipping artillery brigades with M1925 105mm SPG for Motorized/Mechanized/Armored divisions=5 IBP
    Coastal Defense Program=25IBP

    Industrial
    Chemical R&D=20IBP
    Build 2 55,000-70,000 slipways(35IBP)(Q31925)
    Build 2 55,000-70,000 slipways(35IBP)(Q21926)
    Aviation production and R&D Investment=20IBP
    General Industrial investment=60IBP for an additional 15 IBP(1928Q1)

    Transfer of IBP to Manchuria=30IBP.
    MOAR to come
    Last edited by Lonestar on 2010-04-17 09:44am, edited 20 times in total.
    "The rifle itself has no moral stature, since it has no will of its own. Naturally, it may be used by evil men for evil purposes, but there are more good men than evil, and while the latter cannot be persuaded to the path of righteousness by propaganda, they can certainly be corrected by good men with rifles."
    Post Reply