SDN World 3 Construction Queue Thread
Re: SDN World 3 Construction Queue Thread
German Empire Q1 1926:
base points = 560 * 1.10 = 616
rest of Dutch territories IBPs used for incentive programs, repairs of war damange and general subsidies/programs to ensure their loyalty.
+ 75 for sale of 4 cruisers to Raj Ahten
+ 40 for building ships for Grand Columbia
+5 for license of ship to Bolivian Union
+ 12,7 for sale of Dutch ships
+ 11,2 for scrapping of two pantserships not sold to Brazil
= 759,9
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 20
- 20 for canal project
- airtech investment: 0 (total invested: 80)
Navy: 572,9
- 72 for two Lexington class CV
- 15 for fitting out BB
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 105 for 60 ZD class destroyers (Fubuki-class analogues) (60*1,75) (launch Q1 1926, finished Q2 1926)
- 42 for 80 UBIIIB class u-boats
- 9,9 for 272 MAS craft
Fortifications: 7
- 7 points for coastal guns
left: 0
base points = 560 * 1.10 = 616
rest of Dutch territories IBPs used for incentive programs, repairs of war damange and general subsidies/programs to ensure their loyalty.
+ 75 for sale of 4 cruisers to Raj Ahten
+ 40 for building ships for Grand Columbia
+5 for license of ship to Bolivian Union
+ 12,7 for sale of Dutch ships
+ 11,2 for scrapping of two pantserships not sold to Brazil
= 759,9
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 20
- 20 for canal project
- airtech investment: 0 (total invested: 80)
Navy: 572,9
- 72 for two Lexington class CV
- 15 for fitting out BB
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 105 for 60 ZD class destroyers (Fubuki-class analogues) (60*1,75) (launch Q1 1926, finished Q2 1926)
- 42 for 80 UBIIIB class u-boats
- 9,9 for 272 MAS craft
Fortifications: 7
- 7 points for coastal guns
left: 0
Whoever says "education does not matter" can try ignorance
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
- Karmic Knight
- Jedi Master
- Posts: 1005
- Joined: 2007-04-03 05:42pm
Re: SDN World 3 Construction Queue Thread
Unified Congolese Republic
Q1 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 160 IBPs
Rail Line Improvement (Infrastructure 4): 50 IBPs (0/400 Complete Date: Q1 1927, 8 quarters)
Army Tech 4: 40 IBPs ( 0/400 Complete Date: Q3 1927, 10 Quarters)
Air Tech 4: 40 IBPs ( 0/400 Complete Date: Q3 1927, 10 Quarters)
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2
2x 1924 Model Battleship (50.5kt) - 101pts(Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 50 IBPs
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
Total Q1 1925 IBPs Spent: 419/420
Q1 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 160 IBPs
Rail Line Improvement (Infrastructure 4): 50 IBPs (0/400 Complete Date: Q1 1927, 8 quarters)
Army Tech 4: 40 IBPs ( 0/400 Complete Date: Q3 1927, 10 Quarters)
Air Tech 4: 40 IBPs ( 0/400 Complete Date: Q3 1927, 10 Quarters)
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2
2x 1924 Model Battleship (50.5kt) - 101pts(Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 50 IBPs
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
Total Q1 1925 IBPs Spent: 419/420
Last edited by Karmic Knight on 2010-02-09 09:23pm, edited 1 time in total.
This is an empty country and I am it's king, and I should not be allowed to touch anything.
- Karmic Knight
- Jedi Master
- Posts: 1005
- Joined: 2007-04-03 05:42pm
Re: SDN World 3 Construction Queue Thread
Unified Congolese Republic
Q2 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 210
Rail Line Improvement (Infrastructure 4): 50 IBPs ( 50/400 Complete Date: Q1 1927, 7 quarters)
Army Tech 4: 40 IBPs ( 40/400 Complete Date: Q3 1927, 9 Quarters)
Air Tech 4: 40 IBPs ( 40/400 Complete Date: Q3 1927, 9 Quarters)
Industrial Expansion:50 IBPs for 12.5 at Q2 1926
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2 IBPs
2x 1924 Model Battleship (50.5kt) - 101pts(Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 0
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
Total Q2 IBPs Spent: 419/420
Q2 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 210
Rail Line Improvement (Infrastructure 4): 50 IBPs ( 50/400 Complete Date: Q1 1927, 7 quarters)
Army Tech 4: 40 IBPs ( 40/400 Complete Date: Q3 1927, 9 Quarters)
Air Tech 4: 40 IBPs ( 40/400 Complete Date: Q3 1927, 9 Quarters)
Industrial Expansion:50 IBPs for 12.5 at Q2 1926
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2 IBPs
2x 1924 Model Battleship (50.5kt) - 101pts(Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 0
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
Total Q2 IBPs Spent: 419/420
Last edited by Karmic Knight on 2010-02-09 09:26pm, edited 1 time in total.
This is an empty country and I am it's king, and I should not be allowed to touch anything.
Re: SDN World 3 Construction Queue Thread
Afghanistan, Q2 1926
360 points available (200 base + 150 war time + 10 from industrial investment prior year)
Prior Investments (due to prior accounting errors re: artillery, construction from prior quarters is being spent here to avoid unfair advantage in industrial freedom without causing continuity errors, with an additional ten point penalty).
Total cost prior artillery: 60 points + 10 penalty
300 points free, 3 quarters of Wartime production so far.
Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 200 points)
Fortification CW proofing using Dominion advisors: 30 points
Tularemia and Plague Research and Cultivation Project: 40 points (total now 155)
Infantry Weapon Design: 30 points (total now 97)
Artillery design: 30 points (total now 120)
Tank design program: 35 points (total now 35)
Modernization program (for AT:3): 30 points (total now to 120)
Continuing wartime production investments: 20 points
New Units:
2 fighter-carrier zeppellins: 10 points
5 new divisions horse-artillery: 15 points
360 points available (200 base + 150 war time + 10 from industrial investment prior year)
Prior Investments (due to prior accounting errors re: artillery, construction from prior quarters is being spent here to avoid unfair advantage in industrial freedom without causing continuity errors, with an additional ten point penalty).
Total cost prior artillery: 60 points + 10 penalty
300 points free, 3 quarters of Wartime production so far.
Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 200 points)
Fortification CW proofing using Dominion advisors: 30 points
Tularemia and Plague Research and Cultivation Project: 40 points (total now 155)
Infantry Weapon Design: 30 points (total now 97)
Artillery design: 30 points (total now 120)
Tank design program: 35 points (total now 35)
Modernization program (for AT:3): 30 points (total now to 120)
Continuing wartime production investments: 20 points
New Units:
2 fighter-carrier zeppellins: 10 points
5 new divisions horse-artillery: 15 points
"Doctors keep their scalpels and other instruments handy, for emergencies. Keep your philosophy ready too—ready to understand heaven and earth. In everything you do, even the smallest thing, remember the chain that links them. Nothing earthly succeeds by ignoring heaven, nothing heavenly by ignoring the earth." M.A.A.A
Re: SDN World 3 Construction Queue Thread
Britain Q2 1926
Industrial base: 520
Economy bonus:52
Total: 572
Infrastracture: 185
100 IBP to increase of industrial capacity (complete January 1927)
Upgrade 3 25-40kT Slips to 70kt slips: 60 (complete January 1927)
Create 1 70kt slip: 25 (complete April 1927)
Research Air Tech : 6.25 (123.7 total invested)
Navy: Total 365.75
2 Majestic class carriers trials: 2.75 (trials complete Q2 1926)
1 Superb class battleship trials: 2.425 (trials complete Q2 1926)
3 Leopard class battleship trials: 7.275 (trials complete Q2 1926)
8 Hurricane class DD leaders leaders: 0.7 (trials complete July 1926)
2 Leopard class BC: 97 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete January 1928)
24 Porpoise class submarines: 21.6 (construction complete January 1927)
8 Hurricane class DD leaders leaders: 14 (construction complete January 1927)
Air Force: Total 15
90 FB-5: 9 (complete July 1926)
60 Blackburn Dart: 6 (complete July 1926)
Completed
2 Majestic class carriers trials: 2.75 (trials complete Q1 1926)
2 Superb class battleships trials: 4.85 (trials complete Q1 1926)
32 Amazon class destroyers trials: 2.16 (trials complete April 1926)
12 Oberon class submarines trials: 0.885 (trials complete April 1926)
16 Porpoise class submarines trials: 0.72 (trials complete April 1926)
32 E50 class submarines trials: 0.895 (trials complete April 1926)
90 FB-5: 9 (complete April 1926)
60 Blackburn Dart: 6 (complete April 1926)
Industrial base: 520
Economy bonus:52
Total: 572
Infrastracture: 185
100 IBP to increase of industrial capacity (complete January 1927)
Upgrade 3 25-40kT Slips to 70kt slips: 60 (complete January 1927)
Create 1 70kt slip: 25 (complete April 1927)
Research Air Tech : 6.25 (123.7 total invested)
Navy: Total 365.75
2 Majestic class carriers trials: 2.75 (trials complete Q2 1926)
1 Superb class battleship trials: 2.425 (trials complete Q2 1926)
3 Leopard class battleship trials: 7.275 (trials complete Q2 1926)
8 Hurricane class DD leaders leaders: 0.7 (trials complete July 1926)
2 Leopard class BC: 97 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete January 1928)
24 Porpoise class submarines: 21.6 (construction complete January 1927)
8 Hurricane class DD leaders leaders: 14 (construction complete January 1927)
Air Force: Total 15
90 FB-5: 9 (complete July 1926)
60 Blackburn Dart: 6 (complete July 1926)
Completed
2 Majestic class carriers trials: 2.75 (trials complete Q1 1926)
2 Superb class battleships trials: 4.85 (trials complete Q1 1926)
32 Amazon class destroyers trials: 2.16 (trials complete April 1926)
12 Oberon class submarines trials: 0.885 (trials complete April 1926)
16 Porpoise class submarines trials: 0.72 (trials complete April 1926)
32 E50 class submarines trials: 0.895 (trials complete April 1926)
90 FB-5: 9 (complete April 1926)
60 Blackburn Dart: 6 (complete April 1926)
- Karmic Knight
- Jedi Master
- Posts: 1005
- Joined: 2007-04-03 05:42pm
Re: SDN World 3 Construction Queue Thread
Unified Congolese Republic
Q3 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 210
Rail Line Improvement (Infrastructure 4): 50 IBPs ( 100/400 Complete Date: Q1 1927, 6 quarters)
Army Tech 4: 40 IBPs ( 80/400 Complete Date: Q3 1927, 8 Quarters)
Air Tech 4: 40 IBPs ( 80/400 Complete Date: Q3 1927, 8 Quarters)
Industrial Expansion: 50 IBPs for 12.5 at Q2 1926
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
]7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2 IBPs
2x 1924 Model Battleship (50.5kt) - 101pts(Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 0
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925,, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925,, Full Training Q4 1925)
Total Q2 IBPs Spent: 419/420
Q3 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 210
Rail Line Improvement (Infrastructure 4): 50 IBPs ( 100/400 Complete Date: Q1 1927, 6 quarters)
Army Tech 4: 40 IBPs ( 80/400 Complete Date: Q3 1927, 8 Quarters)
Air Tech 4: 40 IBPs ( 80/400 Complete Date: Q3 1927, 8 Quarters)
Industrial Expansion: 50 IBPs for 12.5 at Q2 1926
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
]7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2 IBPs
2x 1924 Model Battleship (50.5kt) - 101pts(Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 0
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925,, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925,, Full Training Q4 1925)
Total Q2 IBPs Spent: 419/420
This is an empty country and I am it's king, and I should not be allowed to touch anything.
- Karmic Knight
- Jedi Master
- Posts: 1005
- Joined: 2007-04-03 05:42pm
Re: SDN World 3 Construction Queue Thread
Unified Congolese Republic
Q4 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 210
Rail Line Improvement (Infrastructure 4): 50 IBPs ( 150/400 Complete Date: Q1 1927, 5 quarters)
Army Tech 4: 40 IBPs ( 120/400 Complete Date: Q3 1927, 7 Quarters)
Air Tech 4: 40 IBPs ( 120/400 Complete Date: Q3 1927, 7 Quarters)
Industrial Expansion: 50 IBPs for 12.5 at Q2 1926
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
]7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2 IBPs
2x 1924 Model Battleship (50.5kt) - 101pts (Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 0
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925,, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925],, Full Training Q4 1925)
Total Q2 IBPs Spent: 419/420
Q4 1925
420 IBPs (Industry 4 + Economy 4)
National Projects: 210
Rail Line Improvement (Infrastructure 4): 50 IBPs ( 150/400 Complete Date: Q1 1927, 5 quarters)
Army Tech 4: 40 IBPs ( 120/400 Complete Date: Q3 1927, 7 Quarters)
Air Tech 4: 40 IBPs ( 120/400 Complete Date: Q3 1927, 7 Quarters)
Industrial Expansion: 50 IBPs for 12.5 at Q2 1926
New 25-40kt Slipway - 15 pts(Q1 1927)
Expand 40-55kt Slipway to 55-70kt - 15pts (Q1 1927)
Army Projects: 63 IBPs
]7x Upgrading Infantry to Motorized Capability: 63 (Complete Date: Q1 1926, Lowered Effectiveness: Q3 1926)
Naval Projects: 145.2 IBPs
2x 1924 Model Battleship (50.5kt) - 101pts (Q1 1927, Q1 1928)
1x 1924 Model Aircraft Carrier (21.6kt) - 21.6pts (Q3 1926, Q4 1926)
1x 1924 Model Aircraft Carrier (10.6kt) - 10.6pts (Q1 1926, Q3 1926)
8x 1924 Model Destroyer (1.5kt) - 12 pts (Q4 1925, Q1 1926)
Air Force Projects: 0
100x Air Tech 3 Fighters, 10 IBPs, (Complete Date, Q1 1925, Basic Training Q2 1925,, Full Training Q4 1925)
40x Air Tech 3 Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925, Full Training Q4 1925)
40x Air Tech 3 Naval Bombers, 20 IBPs (Complete Date, Q1 1925, Basic Training Q2 1925],, Full Training Q4 1925)
Total Q2 IBPs Spent: 419/420
This is an empty country and I am it's king, and I should not be allowed to touch anything.
Re: SDN World 3 Construction Queue Thread
RogueIce wrote:United States of America - Q1 FY1926 (January)
Total: 550 IBPs (5 IND/5 ECON)
National Projects
Air Tech 4: 25
Army Tech 4: 25
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
United States Army
Converting 10th Division (Reserve) to active duty: 1 (Effective MAR 1926)
Converting 11th Division (Reserve) to active duty: 1 (Effective MAR 1926)
Converting 3rd Cavalry Division (Reserve) to active duty: 2 (Effective MAR 1926)
Converting 12th Division (Reserve) to active duty: 1 (Effective APR 1926)
Converting 3 Artillery Brigades (Reserve) to active duty: 3 (Effective APR 1926)
Converting Artillery Brigade (Reserve) to active duty: 1 (Effective July 1926)
Forming 1 Infantry Brigade w/vehicular transport: 3 (Complete OCT 1926)
United States Army Air Corps
36 P-5 [Boeing Model 15]: 3.6 (Complete FEB 1926)
20 B-1 [Martin NBS-1]: 2 (Complete FEB 1926)
4 Prototype A-2 [Curtiss Falcon]: 4 (Complete FEB 1926)
United States Navy
Fitting out South Dakota class BB (43200t): 2.16 (Complete AUG 1926)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
15x Bainbridge DD (1400t): 21 (Construction complete MAY 1926; Fitting out complete AUG 1926)
4x Tampa CA (24610t): 98.4 (Construction complete FEB 1927; Fitting out complete OCT 1927)
16 FB [Boeing Model 15]: 1.6 (Complete FEB 1926)
4 Prototype Curtiss CS: 4 (Complete FEB 1926)
TOTAL: 441.16 / 550
RogueIce wrote:United States of America - Q2 FY1926 (April)
Total: 550 IBPs (5 IND/5 ECON)
National Projects
Air Tech 4: 25
Army Tech 4: 25
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
United States Army
Converting 10th Division (Reserve) to active duty: 1 (Effective MAR 1926)
Converting 11th Division (Reserve) to active duty: 1 (Effective MAR 1926)
Converting 3rd Cavalry Division (Reserve) to active duty: 2 (Effective MAR 1926)
Converting 12th Division (Reserve) to active duty: 1 (Effective APR 1926)
Converting 3 Artillery Brigades (Reserve) to active duty: 3 (Effective APR 1926)
Converting Artillery Brigade (Reserve) to active duty: 1 (Effective July 1926)
Forming 1 Infantry Brigade w/vehicular transport: 3 (Complete OCT 1926)
United States Army Air Corps
36 P-5 [Boeing Model 15]: 3.6 (Complete FEB 1926)
20 B-1 [Martin NBS-1]: 2 (Complete FEB 1926)
4 6 Prototype Curtiss Falcon: 4 6 (Complete FEB 1926)
20 P-5 [Boeing Model 15]: 2 (Complete June 1926)
20 O-1 [Airco DH.4]: 2 (Complete June 1926)
United States Navy
Fitting out South Dakota class BB (43200t): 2.16 (Complete AUG 1926)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
15x Bainbridge DD (1400t): 21 (Construction complete MAY 1926; Fitting out complete AUG 1926)
4x Tampa CA (24610t): 98.4 (Construction complete FEB 1927; Fitting out complete OCT 1927)
16 FB [Boeing Model 15]: 1.6 (Complete FEB 1926)
4 6 Prototype Curtiss CS: 4 6 (Complete FEB MAY 1926)
TOTAL: 431.96 / 550
Last edited by RogueIce on 2010-03-14 02:10pm, edited 1 time in total.
"How can I wait unknowing?
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)
"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)
"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
Re: SDN World 3 Construction Queue Thread
July 1926 Construction Queue
Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550
National Projects:
Air Tech 4 = 25 IBPs, 110/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date March 1927)
Infrastructure Upgrades = 60 IBPs, 100/500, started January 1925
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Nicaragua Canal Project = 20 IBPs
Industrial Expansion = 60 IBPs for gain of 15 IBPs (Started August 1925: Completion August 1926)
Total Cost: 260 IBPs
Army
6 Infantry Divisions = 12 IBPs, complete in January 1927, max effectiveness in July 1928
2 Artillery Brigade = 6 IBPs, complete in July 1927, max effectiveness in July 1928
4 Artillery Brigades = 12 IBPs, complete in January 1927, max effectiveness in January 1928
Total Cost: 30 IBPs
Navy
1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete February 1927, completion in October 1927)
10 Horton-class (1,800t) = 18 IBPs (construction phase complete July 1926, completion in October 1926)
10 Horton-class (1,800t) = .9 IBPs (fitting out, completion in October 1926)
2 Sovereign-class (50,428t) = 5.04 IBPs (fitting out phase, completion in March-May 1926)
4 Defiant-class (55,000t) = 220 IBPs (construction phase complete in April-July 1927, full completion in March-July 1928)
Total Cost: 233.8 IBPs
Air Force
100 PF-4 biplane fighters = 10 IBPs (Completion October 1926)
60 BF-3 biplane bombers = 6 IBPs (Completion October 1926)
20 RC-2 coastal patrol flying boats = 10 IBPs (completion October 1926)
Total Cost: 26 IBPs
Overall Expenditures: 549.8/550 IBPs
Research
Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928
Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928
Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927
Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550
National Projects:
Air Tech 4 = 25 IBPs, 110/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date March 1927)
Infrastructure Upgrades = 60 IBPs, 100/500, started January 1925
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Nicaragua Canal Project = 20 IBPs
Industrial Expansion = 60 IBPs for gain of 15 IBPs (Started August 1925: Completion August 1926)
Total Cost: 260 IBPs
Army
6 Infantry Divisions = 12 IBPs, complete in January 1927, max effectiveness in July 1928
2 Artillery Brigade = 6 IBPs, complete in July 1927, max effectiveness in July 1928
4 Artillery Brigades = 12 IBPs, complete in January 1927, max effectiveness in January 1928
Total Cost: 30 IBPs
Navy
1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete February 1927, completion in October 1927)
10 Horton-class (1,800t) = 18 IBPs (construction phase complete July 1926, completion in October 1926)
10 Horton-class (1,800t) = .9 IBPs (fitting out, completion in October 1926)
2 Sovereign-class (50,428t) = 5.04 IBPs (fitting out phase, completion in March-May 1926)
4 Defiant-class (55,000t) = 220 IBPs (construction phase complete in April-July 1927, full completion in March-July 1928)
Total Cost: 233.8 IBPs
Air Force
100 PF-4 biplane fighters = 10 IBPs (Completion October 1926)
60 BF-3 biplane bombers = 6 IBPs (Completion October 1926)
20 RC-2 coastal patrol flying boats = 10 IBPs (completion October 1926)
Total Cost: 26 IBPs
Overall Expenditures: 549.8/550 IBPs
Research
Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928
Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928
Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927
”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt
"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia
American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.
DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia
American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.
DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
- CmdrWilkens
- Emperor's Hand
- Posts: 9093
- Joined: 2002-07-06 01:24am
- Location: Land of the Crabcake
- Contact:
Re: SDN World 3 Construction Queue Thread
*Note Q2 1926 queue was already posted however it initially listed only Q4 Wartime production. Since, per my IG post, mobilization will remain in effect in to Q1 1926 while negotiations are ongoing the wartime queue has been updated to reflect. Please see the previous post for details.
SDNet World Nation: Wilkonia
Armourer of the WARWOLVES
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE
"I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
-Kingdom of Heaven
- Shinn Langley Soryu
- Jedi Council Member
- Posts: 1526
- Joined: 2006-08-18 11:27pm
- Location: COOBIE YOU KNOW WHAT TIME IT IS
Re: SDN World 3 Construction Queue Thread
Southeast Asian Union
GAME STATS
Basic industrial points: 420 points / quarter (Industry 4 = 400 points / quarter, industrial improvements = +20 points / quarter)
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 441 points / quarter during peacetime, 840 points / quarter during wartime
CONSTRUCTON ORDERS (Q2 1926)
Army
Reactivation of 1st and 2nd Guangxi Guards Reserve Armies + 1st and 2nd Guangdong Guards Reserve Armies = 32 IBPs (complete July 1926)
Reactivation of 3rd and 4th Guangxi Guards Reserve Armies + 3rd and 4th Guangdong Guards Reserve Armies = 32 IBPs (complete October 1926)
Air Force
N/A
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 3.2 IBPs (laid down July 1925, construction complete April 1926, trials complete July 1926)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1926, construction complete October 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 2.1 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1927)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1928)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
2 x 55-70kT slipway = 50 IBPs (construction complete January 1928)
Industrial
Industrial improvements = 100 IBPs (+25 IBPs starting January 1927)
Economic improvements = 40 IBPs (80/500 IBPs total, Economy = 5 starting January 1929)
NOTES
80 "free" IBPs have been given retroactively due to revisions of the tech upgrade rule.
Surplus remaining: 66.2 IBPs
GAME STATS
Basic industrial points: 420 points / quarter (Industry 4 = 400 points / quarter, industrial improvements = +20 points / quarter)
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 441 points / quarter during peacetime, 840 points / quarter during wartime
CONSTRUCTON ORDERS (Q2 1926)
Army
Reactivation of 1st and 2nd Guangxi Guards Reserve Armies + 1st and 2nd Guangdong Guards Reserve Armies = 32 IBPs (complete July 1926)
Reactivation of 3rd and 4th Guangxi Guards Reserve Armies + 3rd and 4th Guangdong Guards Reserve Armies = 32 IBPs (complete October 1926)
Air Force
N/A
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 3.2 IBPs (laid down July 1925, construction complete April 1926, trials complete July 1926)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1926, construction complete October 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 2.1 IBPs (laid down January 1925, construction complete January 1926, trials complete July 1926)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1927)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1928)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
2 x 55-70kT slipway = 50 IBPs (construction complete January 1928)
Industrial
Industrial improvements = 100 IBPs (+25 IBPs starting January 1927)
Economic improvements = 40 IBPs (80/500 IBPs total, Economy = 5 starting January 1929)
NOTES
80 "free" IBPs have been given retroactively due to revisions of the tech upgrade rule.
Surplus remaining: 66.2 IBPs
Last edited by Shinn Langley Soryu on 2010-03-02 12:06am, edited 3 times in total.
I ship Eino Ilmari Juutilainen x Lydia V. Litvyak.
Phantasee: Don't be a dick.
Stofsk: What are you, his mother?
The Yosemite Bear: Obviously, which means that he's grounded, and that she needs to go back to sucking Mr. Coffee's cock.
"d-did... did this thread just turn into Thanas/PeZook slash fiction?" - Ilya Muromets[/size]
Phantasee: Don't be a dick.
Stofsk: What are you, his mother?
The Yosemite Bear: Obviously, which means that he's grounded, and that she needs to go back to sucking Mr. Coffee's cock.
"d-did... did this thread just turn into Thanas/PeZook slash fiction?" - Ilya Muromets[/size]
- Fingolfin_Noldor
- Emperor's Hand
- Posts: 11834
- Joined: 2006-05-15 10:36am
- Location: At the Helm of the HAB Star Dreadnaught Star Fist
Re: SDN World 3 Construction Queue Thread
1925Q4
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date January 1927, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points
Total: 315 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 125 points
Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 10 points
Navy
4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 99.02 points
Total: 549.02 points
1926Q1
Note: additional 20 IBPs for this year
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsena, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points
Total: 285 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 18 points
*: To be completed by the Balkan Confederacy
Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 26 points
**: To be built by the Sultanate
Navy
4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 241.08 points
***: 1 for the Balkan Confederacy
Total: 570 points (about)
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date January 1927, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points
Total: 315 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 125 points
Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 10 points
Navy
4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 99.02 points
Total: 549.02 points
1926Q1
Note: additional 20 IBPs for this year
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsena, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points
Total: 285 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 18 points
*: To be completed by the Balkan Confederacy
Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 26 points
**: To be built by the Sultanate
Navy
4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 241.08 points
***: 1 for the Balkan Confederacy
Total: 570 points (about)
Last edited by Fingolfin_Noldor on 2010-02-20 08:08pm, edited 1 time in total.
STGOD: Byzantine Empire
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
Re: SDN World 3 Construction Queue Thread
Tuscan Kingdom, Q2 1926:
To spend: 441
Infrastructure: 30 General improvements to railways, harbours, roads etc
Economy: 30 focus on promoting Tuscan products in Europe and abroad
total 60pts; spent since gamestart: 80 in 1925, 60 in 1926
Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agriculture (fertilisers, pesticides, seed quality etc.)
naval ordnance
(one free)
towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since gamestart
Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.
Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 1/8 | intermediate between Ark Royal and Courageous – 60 aircraft, 30 kts ; laid down
DD |12x Nonmetalli e Semimetalli | 3 | 36 quarter 1/4 | repeat Alkalini DDs; laid own
BB |1x Patria |50 | 50 |Quarter 6/12 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 6/12| Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 5/12 |Patria-class under construction
CA |1x Mamberamo |17 |17 |quarter 5/8 | Tevere-class under construction
CA |1x Mosca |17 |17 |quarter 5/8 | Tevere-class under construction
CV |1x Cigno |22 |1.1 |quarter 6/8 | as HMS Courageous; trials
CV |1x Albatro |22 |1.1 |quarter 6/8 | as HMS Courageous; trials
DD |14x Lantanoidi | 3 | 2.1quarter 4/4 | repeat Alkalini DDs; trials
BB |1x Oceano |48 | 2.4 |Quarter 11/12 |1 Il Principe-class trials
SS |7 x long range |3 | 0 | quarter 4/4 new Submarines, Surcouf-type (3000 ts) completed
Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class 1.5 | 15 |Quarter 2/4 | under construction
MAS:
100 for Tuscany (150 ts each, 3.7 pts), under construction
Sale of 300 MAS to Germany, completed end of Q2/1926 (+ 1,3 pts from the sale)
completed
200 for Tuscany (150 ts each)
and
100 MAS craft sold to Germany
Aircraft
Series production:
8 Squadrons of Dart bombers 16 pts
8 Squadrons of Flycatcher fighters 8 pts
Army
pts army upgrade (infantry weapons and transportation)
421.3 points spent in total for Q2/1926
To spend: 441
Infrastructure: 30 General improvements to railways, harbours, roads etc
Economy: 30 focus on promoting Tuscan products in Europe and abroad
total 60pts; spent since gamestart: 80 in 1925, 60 in 1926
Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agriculture (fertilisers, pesticides, seed quality etc.)
naval ordnance
(one free)
towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since gamestart
Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.
Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 1/8 | intermediate between Ark Royal and Courageous – 60 aircraft, 30 kts ; laid down
DD |12x Nonmetalli e Semimetalli | 3 | 36 quarter 1/4 | repeat Alkalini DDs; laid own
BB |1x Patria |50 | 50 |Quarter 6/12 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 6/12| Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 5/12 |Patria-class under construction
CA |1x Mamberamo |17 |17 |quarter 5/8 | Tevere-class under construction
CA |1x Mosca |17 |17 |quarter 5/8 | Tevere-class under construction
CV |1x Cigno |22 |1.1 |quarter 6/8 | as HMS Courageous; trials
CV |1x Albatro |22 |1.1 |quarter 6/8 | as HMS Courageous; trials
DD |14x Lantanoidi | 3 | 2.1quarter 4/4 | repeat Alkalini DDs; trials
BB |1x Oceano |48 | 2.4 |Quarter 11/12 |1 Il Principe-class trials
SS |7 x long range |3 | 0 | quarter 4/4 new Submarines, Surcouf-type (3000 ts) completed
Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class 1.5 | 15 |Quarter 2/4 | under construction
MAS:
100 for Tuscany (150 ts each, 3.7 pts), under construction
Sale of 300 MAS to Germany, completed end of Q2/1926 (+ 1,3 pts from the sale)
completed
200 for Tuscany (150 ts each)
and
100 MAS craft sold to Germany
Aircraft
Series production:
8 Squadrons of Dart bombers 16 pts
8 Squadrons of Flycatcher fighters 8 pts
Army
pts army upgrade (infantry weapons and transportation)
421.3 points spent in total for Q2/1926
Last edited by Raesene on 2010-02-15 01:13pm, edited 2 times in total.
"In view of the circumstances, Britannia waives the rules."
"All you have to do is to look at Northern Ireland, [...] to see how seriously the religious folks take "thou shall not kill. The more devout they are, the more they see murder as being negotiable." George Carlin
"We need to make gay people live in fear again! What ever happened to the traditional family values of persecution and lies?" - Darth Wong
"The closet got full and some homosexuals may have escaped onto the internet?"- Stormbringer
Re: SDN World 3 Construction Queue Thread
Tuscan Kingdom, Q3 1926:
To spend: 441
Infrastructure: 30 General improvements to railways, harbours, roads etc
Economy: 30 focus on promoting Tuscan products in Europe and abroad
spent since game start 80 in 1925, 90 in 126
Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agrochemistry (fertilisers, pesticides, seed quality etc.)
naval ordnance
(one free)
towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since game start
Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 2/8 | intermediate between Ark Royal and Courageous – 60 aircraft; under construction
DD |12x Nonmetalli e Semimetalli | 3 | 36 quarter 2/4 | repeat Alkalini DDs; under construction
BB |1x Patria |50 | 50 |Quarter 7/12 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 7/12| Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 6/12 |Patria-class under construction
CA |1x Mamberamo |17 | 0.85 |quarter 6/8 | Tevere-class, launched and fitting out
CA |1x Mosca |17 | 0.85 |quarter 6/8 | Tevere-class, launched and fitting out
CV |1x Cigno |22 |1.1 |quarter 7/8 | as HMS Courageous; trials
CV |1x Albatro |22 |1.1 |quarter 7/8 | as HMS Courageous; trials
BB |1x Oceano |48 | 2.4 |Quarter 12/12 |1 Il Principe-class trials
DD |14x Lantanoidi | 3 | 0 | quarter 4/4 | repeat Alkalini DDs; completed
Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class 1.5 | 15 |Quarter 3/4 | under construction
MAS:
100 for Tuscany (150 ts each, 1.5 pts), under construction
completed in previous quarter:
100 for Tuscany (150 ts each) and
300 MAS craft sold to Germany
Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.
Aircraft
Series production:
4 Squadrons of Dart bombers 8 pts
4 Squadrons of Flycatcher fighters 4 pts
Army
30 pts: Upgrade of 10 Army brigades to brigades with vehicular transport (Q 1/4)
20 pts: arms and equipment upgrade – new uniforms, better grenades, rifles,…
436.8 points spent in total for Q3/1926
(may still change based on in-game developments)
To spend: 441
Infrastructure: 30 General improvements to railways, harbours, roads etc
Economy: 30 focus on promoting Tuscan products in Europe and abroad
spent since game start 80 in 1925, 90 in 126
Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agrochemistry (fertilisers, pesticides, seed quality etc.)
naval ordnance
(one free)
towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since game start
Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 2/8 | intermediate between Ark Royal and Courageous – 60 aircraft; under construction
DD |12x Nonmetalli e Semimetalli | 3 | 36 quarter 2/4 | repeat Alkalini DDs; under construction
BB |1x Patria |50 | 50 |Quarter 7/12 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 7/12| Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 6/12 |Patria-class under construction
CA |1x Mamberamo |17 | 0.85 |quarter 6/8 | Tevere-class, launched and fitting out
CA |1x Mosca |17 | 0.85 |quarter 6/8 | Tevere-class, launched and fitting out
CV |1x Cigno |22 |1.1 |quarter 7/8 | as HMS Courageous; trials
CV |1x Albatro |22 |1.1 |quarter 7/8 | as HMS Courageous; trials
BB |1x Oceano |48 | 2.4 |Quarter 12/12 |1 Il Principe-class trials
DD |14x Lantanoidi | 3 | 0 | quarter 4/4 | repeat Alkalini DDs; completed
Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class 1.5 | 15 |Quarter 3/4 | under construction
MAS:
100 for Tuscany (150 ts each, 1.5 pts), under construction
completed in previous quarter:
100 for Tuscany (150 ts each) and
300 MAS craft sold to Germany
Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.
Aircraft
Series production:
4 Squadrons of Dart bombers 8 pts
4 Squadrons of Flycatcher fighters 4 pts
Army
30 pts: Upgrade of 10 Army brigades to brigades with vehicular transport (Q 1/4)
20 pts: arms and equipment upgrade – new uniforms, better grenades, rifles,…
436.8 points spent in total for Q3/1926
(may still change based on in-game developments)
"In view of the circumstances, Britannia waives the rules."
"All you have to do is to look at Northern Ireland, [...] to see how seriously the religious folks take "thou shall not kill. The more devout they are, the more they see murder as being negotiable." George Carlin
"We need to make gay people live in fear again! What ever happened to the traditional family values of persecution and lies?" - Darth Wong
"The closet got full and some homosexuals may have escaped onto the internet?"- Stormbringer
Re: SDN World 3 Construction Queue Thread
Britain Q3 1926
Industrial base: 520
Economy bonus:52
Total: 572
Infrastracture: 200
100 IBP to increase of industrial capacity (complete January 1927)
Upgrade 3 25-40kT Slips to 70kt slips: 60 (complete January 1927)
Create 1 70kt slip: 25 (complete April 1927)
Research Air Tech : 20 (129.95 total invested)
Navy: Total 367
2 Leopard class BC: 97 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete January 1928)
24 Porpoise class submarines: 21.6 (construction complete January 1927)
8 Hurricane class DD leaders leaders: 14 (construction complete January 1927)
16 Porpoise class submarines: 14.4 (construction complete April 1927)
Completed
2 Majestic class carriers trials: 2.75 (trials complete Q2 1926)
1 Superb class battleship trials: 2.425 (trials complete Q2 1926)
3 Leopard class battleship trials: 7.275 (trials complete Q2 1926)
8 Hurricane class DD leaders leaders: 0.7 (trials complete July 1926)
90 FB-5: 9 (complete July 1926)
60 Blackburn Dart: 6 (complete July 1926)
Industrial base: 520
Economy bonus:52
Total: 572
Infrastracture: 200
100 IBP to increase of industrial capacity (complete January 1927)
Upgrade 3 25-40kT Slips to 70kt slips: 60 (complete January 1927)
Create 1 70kt slip: 25 (complete April 1927)
Research Air Tech : 20 (129.95 total invested)
Navy: Total 367
2 Leopard class BC: 97 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete January 1928)
24 Porpoise class submarines: 21.6 (construction complete January 1927)
8 Hurricane class DD leaders leaders: 14 (construction complete January 1927)
16 Porpoise class submarines: 14.4 (construction complete April 1927)
Completed
2 Majestic class carriers trials: 2.75 (trials complete Q2 1926)
1 Superb class battleship trials: 2.425 (trials complete Q2 1926)
3 Leopard class battleship trials: 7.275 (trials complete Q2 1926)
8 Hurricane class DD leaders leaders: 0.7 (trials complete July 1926)
90 FB-5: 9 (complete July 1926)
60 Blackburn Dart: 6 (complete July 1926)
Re: SDN World 3 Construction Queue Thread
Needs reworking, will post at a later date.
Re: SDN World 3 Construction Queue Thread
Q1 1926:
base points = 560 * 1.10 = 616
rest of Dutch territories IBPs used for incentive programs and war damage
+ 75 for sale of 4 cruisers to Raj Ahten
+ 40 for building ships for Grand Columbia
+5 for license of ship to Bolivian Union
+ 12,7 for sale of Dutch ships
+ 11,2 for scrapping of two pantserships not sold to Brazil
= 759,9
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 20
- 20 for canal project
- airtech investment: 0 (total invested: 80)
Navy building: 572,9
- 36 for two Lexington class CV
- 15 for fitting out BB
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 105 for 60 ZD class destroyers (Fubuki-class analogues) (60*1,75) (launched Q1 1926, finished Q2 1926)
- 42 for 80 UBIIIB class u-boats
- 9,9 for 272 MAS craft
- 36 for 2 BlücherII class heavy cruisers
Fortifications: 7
- 7 points for coastal guns
left: 0
Q2 1926:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
+ 75 for sale of 4 cruisers to Raj Ahten
+ 40 for building ships for Grand Columbia
+ 5 for selling ships to the Bolivian Union
= 1068 points
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 195
- 20 for canal project
- airtech investment: 50 (total invested: 80/200)
- infrastructure upgrade Dutch: 62,5 (total invested 0/500)
- economy upgrade dutch territories: 62,5 (total invested 0/500)
Army: 84
- 84 for motorizing Corps I-IV (28 Brigades in need of mot. total) (complete Q1 1927)
Navy: 597,6
- 36 for two Lexington class CV conversions (complete Q4 1926)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC, launch Q1 1927)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 5,3 for fitting out of 60 ZD class destroyers (Fubuki-class analogues) (finished Q2 1926)
- 42 for 80 UBIIIB class u-boats (24 of the minelaying variant)
- 10,3 for 300 MAS craft
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 24 for refit of 2 Österreich class dreadnoughts (ready Q4 1926)
- 1,8 for fitting out of 2 BlücherII class cruiser (ready Q4 1926)
- 32 for refit of 2 Ziethen class BC (ready Q4 1926)
Airforce: 31,4
- 0,4 for 4 Fokker D.XIV
- 22 for 84 Fokker D.VIII, 182 Handley Page V/1500, 156 Fokker D.XIV bought from Egypt
- 9 for 90 Dornier Do-H
- 1,2 for 12 Fokker DXIII
left: 0
Kosten Q3 1926:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
+ 75 for sale of 4 cruisers to Raj Ahten
+ 5 for ships sold to bolivian union
= 1028
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 195
- 20 for canal project
- airtech investment: 50 (total invested: 130/200)
- infrastructure upgrade Dutch: 62,5 (total invested 62,5/500)
- economy upgrade dutch territories: 62,5 (total invested 62,5/500)
Army: 84
- 84 for motorizing Corps I-IV (28 Brigades in need of mot. total) (complete Q1 1927)
Navy: 542
- 36 for two Lexington class CV conversions (complete Q4 1926)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 2 for fitting out of 80 UBIIIB class u-boats (24 of the minelaying variant)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 24 for refit of 2 Österreich class dreadnoughts (ready Q4 1926)
- 1,8 for fitting out of 2 BlücherII class cruiser (ready Q4 1926)
- 32 for refit of 2 Ziethen class BC (ready Q4 1926)
Air force:
- 30 for 344 Fokker D.XIV bought from Egypt
- 9 for 90 Torpedo Bombers
- 1,2 for 12 Fokker DXIII
Others:
- 11 for joint coastal shipping initiative with France
left: 0
Kosten Q4 1926:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
= 948
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 165
- 20 for canal project
- airtech investment: 20 (total invested: 180/200)
- infrastructure upgrade Dutch: 62,5 (total invested 125/500)
- economy upgrade dutch territories: 62,5 (total invested 125/500)
Army: 84
- 84 for motorizing Corps I-IV (28 Brigades in need of mot. total) (complete Q4 1926)
Navy: 516
- 36 for two Lexington class CV conversions (complete Q4 1926)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 1,8 for fitting out of 2 BlücherII class cruiser (ready Q4 1926)
- 16 for refit of 1 Ziethen class BC (ready Q2 1927)
- 16 for refit of 1 L20alpha class BB (ready Q2 1927)
Airforce:
- 1,2 for 12 Fokker DXIII
Others:
- 23 for joint coastal shipping initiative with France
left: 0
Overall completed in 1926:
- 60 ZD class destroyers (Fubuki-class analogues)
- 80 UBIIIB class u-boats (24 of the minelaying variant)
- refit of 2 Österreich class dreadnoughts
- refit of 2 Ziethen class BCs
- 2 Blücher II class CAs
- 2 70kt shipyards
- airtech 4
- motorization of Korps I-IV of the German Army
- 572 MAS craft purchased from the Tuscan Kingdom
- coastal guns
- 4 transport planes
- 500 Fokker D.XIV bought from Egypt
- 84 Fokker D.VIII bought from Egypt
- 4 Fokker D.XIV
- 36 Fokker D.XIII
- 182 Handley Page V/1500 bought from Egypt
- 90 Dornier Do-H
- 90 Torpedo bombers.
Research:
- secret research project 1 (completed Q1 1927, weapons currently in testing)
- secret research project 2 (completed Q1 1927, not a weapon)
- secret research project 3 (completed end of Q2 1927, weapons currently in testing)
This also marks the end of Germany profiting from the current sale of warships as all profits are finished.
base points = 560 * 1.10 = 616
rest of Dutch territories IBPs used for incentive programs and war damage
+ 75 for sale of 4 cruisers to Raj Ahten
+ 40 for building ships for Grand Columbia
+5 for license of ship to Bolivian Union
+ 12,7 for sale of Dutch ships
+ 11,2 for scrapping of two pantserships not sold to Brazil
= 759,9
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 20
- 20 for canal project
- airtech investment: 0 (total invested: 80)
Navy building: 572,9
- 36 for two Lexington class CV
- 15 for fitting out BB
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 105 for 60 ZD class destroyers (Fubuki-class analogues) (60*1,75) (launched Q1 1926, finished Q2 1926)
- 42 for 80 UBIIIB class u-boats
- 9,9 for 272 MAS craft
- 36 for 2 BlücherII class heavy cruisers
Fortifications: 7
- 7 points for coastal guns
left: 0
Q2 1926:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
+ 75 for sale of 4 cruisers to Raj Ahten
+ 40 for building ships for Grand Columbia
+ 5 for selling ships to the Bolivian Union
= 1068 points
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 195
- 20 for canal project
- airtech investment: 50 (total invested: 80/200)
- infrastructure upgrade Dutch: 62,5 (total invested 0/500)
- economy upgrade dutch territories: 62,5 (total invested 0/500)
Army: 84
- 84 for motorizing Corps I-IV (28 Brigades in need of mot. total) (complete Q1 1927)
Navy: 597,6
- 36 for two Lexington class CV conversions (complete Q4 1926)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC, launch Q1 1927)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 5,3 for fitting out of 60 ZD class destroyers (Fubuki-class analogues) (finished Q2 1926)
- 42 for 80 UBIIIB class u-boats (24 of the minelaying variant)
- 10,3 for 300 MAS craft
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 24 for refit of 2 Österreich class dreadnoughts (ready Q4 1926)
- 1,8 for fitting out of 2 BlücherII class cruiser (ready Q4 1926)
- 32 for refit of 2 Ziethen class BC (ready Q4 1926)
Airforce: 31,4
- 0,4 for 4 Fokker D.XIV
- 22 for 84 Fokker D.VIII, 182 Handley Page V/1500, 156 Fokker D.XIV bought from Egypt
- 9 for 90 Dornier Do-H
- 1,2 for 12 Fokker DXIII
left: 0
Kosten Q3 1926:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
+ 75 for sale of 4 cruisers to Raj Ahten
+ 5 for ships sold to bolivian union
= 1028
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 195
- 20 for canal project
- airtech investment: 50 (total invested: 130/200)
- infrastructure upgrade Dutch: 62,5 (total invested 62,5/500)
- economy upgrade dutch territories: 62,5 (total invested 62,5/500)
Army: 84
- 84 for motorizing Corps I-IV (28 Brigades in need of mot. total) (complete Q1 1927)
Navy: 542
- 36 for two Lexington class CV conversions (complete Q4 1926)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 2 for fitting out of 80 UBIIIB class u-boats (24 of the minelaying variant)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 24 for refit of 2 Österreich class dreadnoughts (ready Q4 1926)
- 1,8 for fitting out of 2 BlücherII class cruiser (ready Q4 1926)
- 32 for refit of 2 Ziethen class BC (ready Q4 1926)
Air force:
- 30 for 344 Fokker D.XIV bought from Egypt
- 9 for 90 Torpedo Bombers
- 1,2 for 12 Fokker DXIII
Others:
- 11 for joint coastal shipping initiative with France
left: 0
Kosten Q4 1926:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
= 948
Shipyards: 160
- 50 for construction of 2 new 55-70kt yards (complete Q4 1926)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q1 1927)
- 50 for construction of 2 new 55-70 kt (complete Q3 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q3 1927)
Investments: 165
- 20 for canal project
- airtech investment: 20 (total invested: 180/200)
- infrastructure upgrade Dutch: 62,5 (total invested 125/500)
- economy upgrade dutch territories: 62,5 (total invested 125/500)
Army: 84
- 84 for motorizing Corps I-IV (28 Brigades in need of mot. total) (complete Q4 1926)
Navy: 516
- 36 for two Lexington class CV conversions (complete Q4 1926)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 80 for 4 new Heavy cruisers (launch Q4 1926, finished Q3 1927)
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 1,8 for fitting out of 2 BlücherII class cruiser (ready Q4 1926)
- 16 for refit of 1 Ziethen class BC (ready Q2 1927)
- 16 for refit of 1 L20alpha class BB (ready Q2 1927)
Airforce:
- 1,2 for 12 Fokker DXIII
Others:
- 23 for joint coastal shipping initiative with France
left: 0
Overall completed in 1926:
- 60 ZD class destroyers (Fubuki-class analogues)
- 80 UBIIIB class u-boats (24 of the minelaying variant)
- refit of 2 Österreich class dreadnoughts
- refit of 2 Ziethen class BCs
- 2 Blücher II class CAs
- 2 70kt shipyards
- airtech 4
- motorization of Korps I-IV of the German Army
- 572 MAS craft purchased from the Tuscan Kingdom
- coastal guns
- 4 transport planes
- 500 Fokker D.XIV bought from Egypt
- 84 Fokker D.VIII bought from Egypt
- 4 Fokker D.XIV
- 36 Fokker D.XIII
- 182 Handley Page V/1500 bought from Egypt
- 90 Dornier Do-H
- 90 Torpedo bombers.
Research:
- secret research project 1 (completed Q1 1927, weapons currently in testing)
- secret research project 2 (completed Q1 1927, not a weapon)
- secret research project 3 (completed end of Q2 1927, weapons currently in testing)
This also marks the end of Germany profiting from the current sale of warships as all profits are finished.
Whoever says "education does not matter" can try ignorance
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
- CmdrWilkens
- Emperor's Hand
- Posts: 9093
- Joined: 2002-07-06 01:24am
- Location: Land of the Crabcake
- Contact:
Re: SDN World 3 Construction Queue Thread
Industrial Projects of the Mexican Empire
Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
524 In Use
Q3 1926 Current Projects
Army: (90)
Navy: (354)
Air Force: (10)
Other: (70)
============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)
=======================
Q1 1925:
Q2 1925:
Q3 1925:
Q4 1925:
Q1 1926:
Q2 1926:
Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
524 In Use
Q3 1926 Current Projects
Army: (90)
- Upgrades: (90)
- Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
- Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
Navy: (354)
- Slipways: (130)
- Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
- Four (4) Majestuoso class Battlecruisers: 220pts [(4 ships at 55 kt with 1pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
- Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
Air Force: (10)
- Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
Other: (70)
- Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)
============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)
=======================
Q1 1925:
- 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
Q2 1925:
- 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
Q3 1925:
- IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
Q4 1925:
- Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
Q1 1926:
- VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
Q2 1926:
- Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
Last edited by CmdrWilkens on 2010-03-02 10:27pm, edited 3 times in total.
SDNet World Nation: Wilkonia
Armourer of the WARWOLVES
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE
"I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
-Kingdom of Heaven
Re: SDN World 3 Construction Queue Thread
Q4 1926 Construction Queue
Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5
National Projects:
Air Tech 4 = 25 IBPs, 135/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date April 1927)
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Infrastructure Upgrades = 60 IBPs, 160/500, started January 1925
Nicaragua Canal Project = 20 IBPs
Industrial Expansion = 60 IBPs for gain of 15 IBPs (Started August 1925: Completion August 1926)
Total Cost: 200 IBPs
Army
6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
6 Armored Recon Battalions = 12 IBPs, complete in October 1927
6 Infantry Divisions = 12 IBPs, complete in January 1927, max effectiveness in July 1928
2 Artillery Brigades = 6 IBPs[, complete in July 1927, max effectiveness in July 1928
4 Artillery Brigades = 12 IBPs, complete in January 1927, max effectiveness in January 1928
Total Cost: 108 IBPs
Navy
1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete April 1927, completion in October 1927)
10 Horton-class (1,800t) = .9 IBPs (fitting out, completion in October 1926)
4 Defiant-class (55,000t) = 220 IBPs (construction phase complete in April/July 1927, full completion in March-July 1928)
Total Cost: 232.9 IBPs
Air Force
100 PF-4 biplane fighters = 10 IBPs (Completion October 1926)
60 BF-3 biplane bombers = 6 IBPs (Completion October 1926)
20 RC-2 coastal patrol flying boats = 10 IBPs (completion October 1926)
20 1924-model transport aircraft = 10 IBPs (completion January 1927)
20 1924-model heavy bomber aircraft = 10 IBPs (completion January 1927)
4 prototype 1925-model carrier-based fighter/bomber aircraft = 4 IBPs (completion January 1927)
Total Cost: 24 IBPs
Overall Expenditures: 564.9/566.5 IBPs
Research
Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928
Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928
Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927
Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5
National Projects:
Air Tech 4 = 25 IBPs, 135/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date April 1927)
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Infrastructure Upgrades = 60 IBPs, 160/500, started January 1925
Nicaragua Canal Project = 20 IBPs
Industrial Expansion = 60 IBPs for gain of 15 IBPs (Started August 1925: Completion August 1926)
Total Cost: 200 IBPs
Army
6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
6 Armored Recon Battalions = 12 IBPs, complete in October 1927
6 Infantry Divisions = 12 IBPs, complete in January 1927, max effectiveness in July 1928
2 Artillery Brigades = 6 IBPs[, complete in July 1927, max effectiveness in July 1928
4 Artillery Brigades = 12 IBPs, complete in January 1927, max effectiveness in January 1928
Total Cost: 108 IBPs
Navy
1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete April 1927, completion in October 1927)
10 Horton-class (1,800t) = .9 IBPs (fitting out, completion in October 1926)
4 Defiant-class (55,000t) = 220 IBPs (construction phase complete in April/July 1927, full completion in March-July 1928)
Total Cost: 232.9 IBPs
Air Force
100 PF-4 biplane fighters = 10 IBPs (Completion October 1926)
60 BF-3 biplane bombers = 6 IBPs (Completion October 1926)
20 RC-2 coastal patrol flying boats = 10 IBPs (completion October 1926)
20 1924-model transport aircraft = 10 IBPs (completion January 1927)
20 1924-model heavy bomber aircraft = 10 IBPs (completion January 1927)
4 prototype 1925-model carrier-based fighter/bomber aircraft = 4 IBPs (completion January 1927)
Total Cost: 24 IBPs
Overall Expenditures: 564.9/566.5 IBPs
Research
Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928
Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928
Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927
”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt
"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia
American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.
DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia
American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.
DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
Re: SDN World 3 Construction Queue Thread
United States of America - Q3 FY1926 (August)
Total: 550 IBPs (5 IND/5 ECON)
National Projects
Air Tech 4: 25
Army Tech 4: 25
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
United States Army
Forming 1 Infantry Brigade w/vehicular transport: 3 (Complete OCT 1926) CANCELED
United States Army Air Corps
80 P-5 [Boeing Model 15]: 8 (Complete OCT 1926)
10 B-1 [Martin NBS-1]: 1 (Complete OCT 1926)
10 O-1 [Airco DH.4]: 1 (Complete OCT 1926)
6 Prototype Curtiss Falcon: 6 (Complete JUN 1926)
20 P-5 [Boeing Model 15]: 2 (Complete JUN 1926)
20 O-1 [Airco DH.4]: 2 (Complete JUN 1926)
United States Navy
Fitting out South Dakota class BB (43200t): 2.16 (Complete AUG 1926)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
15x Bainbridge DD (1400t): 21 (Construction complete MAY 1926; Fitting out complete AUG 1926)
4x Tampa CA (24610t): 98.4 (Construction complete APR 1927; Fitting out complete OCT 1927)
8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1927)
8x Farragut DD {Fubuki type} (1800t): 14.4 (Construction complete APR 1927; Fitting out complete JUL 1927)
TOTAL: 492 / 550
Total: 550 IBPs (5 IND/5 ECON)
National Projects
Air Tech 4: 25
Army Tech 4: 25
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
United States Army
Forming 1 Infantry Brigade w/vehicular transport: 3 (Complete OCT 1926) CANCELED
United States Army Air Corps
80 P-5 [Boeing Model 15]: 8 (Complete OCT 1926)
10 B-1 [Martin NBS-1]: 1 (Complete OCT 1926)
10 O-1 [Airco DH.4]: 1 (Complete OCT 1926)
6 Prototype Curtiss Falcon: 6 (Complete JUN 1926)
20 P-5 [Boeing Model 15]: 2 (Complete JUN 1926)
20 O-1 [Airco DH.4]: 2 (Complete JUN 1926)
United States Navy
Fitting out South Dakota class BB (43200t): 2.16 (Complete AUG 1926)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete FEB 1927; Fitting out complete FEB 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
15x Bainbridge DD (1400t): 21 (Construction complete MAY 1926; Fitting out complete AUG 1926)
4x Tampa CA (24610t): 98.4 (Construction complete APR 1927; Fitting out complete OCT 1927)
8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1927)
8x Farragut DD {Fubuki type} (1800t): 14.4 (Construction complete APR 1927; Fitting out complete JUL 1927)
TOTAL: 492 / 550
Last edited by RogueIce on 2010-03-14 02:13pm, edited 1 time in total.
"How can I wait unknowing?
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)
"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)
"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
Re: SDN World 3 Construction Queue Thread
Here is the tentative build queue for Spain. Minister of Pigeonry has charged me with keeping his country safe in his abscence.
Point spread of Spain:
Build queues:
Q1-Q4 1925:
Total to spend: 300
Investments:
- 8 towards airtech 4
- 20 towards economy improvement (Econ=4)
Navy:
- 240 for 4 40ktBB, 2 40kt BC (2 BB, 1 BC to be built in Germany)
- 32 for export price of Germany
left: 0
total invested at end of Q4 1925: 32 towards airtech 4, 80 towards econ=4
Q1-Q4 1926:
Total to spend: 300
Investments:
- 10 towards airtech 4
- 50 towards economy improvement (Econ=4)
Navy:
- 240 for 4 40ktBB, 2 40kt BC (2 BB, 1 BC to be built in Germany)
total invested at end of Q4 1926:
Airtech 4: 72/200
Economy 4: 280/280, taking effect Q1 1927
Note:
- Q1 1925-Q4 1926 is essentially the same build queue as MoP posted earlier on, with modifications due to rules changes made.
- value ncessary for reaching econ 4 reduced to 280 due to gains made during the Dutch war, especially the incorporation of resource-rich Guyana.
Budget Q1 1927:
Total to spend: 300*1.05 (economy=4) = 315
Investments: -219.5
- Air tech 4: 32 (total invested: 72/200)
- Industrial improvement: 100
- Army tech 4: 25 (total invested: 0/200)
- Economy level 5: 62.5 (total invested: 0/500)
Navy:
- 12 for fitting out of 4 BB, 2 BC (2 BB, 1 BC fitted out in Germany)
- 35 for 70 G Type Submarines (launch Q3 1927, ready Q4 1927)
Air force:
- 24 for 240 Dornier Do-H fighters
- 24 for 240 Torpedo bombers
- 0,5 for 5 Transport planes
0 left
Total shipbuilding capacity:
160.000 tons
left: 125000 tons
Budget Q2 1927:
Total to spend: 300*1.05 (economy=4) = 315
Investments: -219.5
- Air tech 4: 32 (total invested: 104/200)
- Industrial improvement: 100
- Army tech 4: 25 (total invested: 25/200)
- Economy level 5: 62.5 (total invested: 62.5/500)
Navy:
- 12 for fitting out of 4 BB, 2 BC (2 BB, 1 BC fitted out in Germany, rady Q4 1928)
- 35 for 70 G Type Submarines (launch Q3 1927, ready Q4 1927)
Air force:
- 24 for 240 Dornier Do-H fighters
- 24 for 240 Torpedo bombers
- 0,5 for 5 Transport planes
0 left
Total shipbuilding capacity:
160.000 tons
left: 125000 tons
Completed end of Q2 1927:
480 Dornier Do-H fighters
480 torpedo planes
10 transport planes
Completed research:
- ASDIC
- long range transport planes (with Junkers as partner)
- improved armor manufacturing (with Krupp as partner)
Technologies given to Germany in exchange for their research innovations
Point spread of Spain:
Population: 2
Home Territory: 2
Colonial Territory: 2 (Roughly 500,000 sq. km in all)
Industry: 3 (300pts/quarter, ship size limit 50kt)
Economy: 3 (3 years of mobilization, + 0% PT, + 75% WT); 4 after Q4 1926
Infrastructure: 4
Standing Military Limit: 3 (20% Standing Army, 80% Reserve)
Naval Focus: 2 (+1) = 3 (3 slipways for ships 25-40,000T Standard, 2 slipways for ships 40-55,000T Standard.)
Army Focus: 5
Mobilization Pool: 7,000,000. (14% Pop)
Base Army Manpower: 3,500,000. (50% MP)
Standing Army 700,000. (20%)
Reserves: 2,800,000. (80%)
Air Focus - 4 (You have 480 aircraft)
Air Tech Level: 3
Army Tech Level: 3
Build queues:
Q1-Q4 1925:
Total to spend: 300
Investments:
- 8 towards airtech 4
- 20 towards economy improvement (Econ=4)
Navy:
- 240 for 4 40ktBB, 2 40kt BC (2 BB, 1 BC to be built in Germany)
- 32 for export price of Germany
left: 0
total invested at end of Q4 1925: 32 towards airtech 4, 80 towards econ=4
Q1-Q4 1926:
Total to spend: 300
Investments:
- 10 towards airtech 4
- 50 towards economy improvement (Econ=4)
Navy:
- 240 for 4 40ktBB, 2 40kt BC (2 BB, 1 BC to be built in Germany)
total invested at end of Q4 1926:
Airtech 4: 72/200
Economy 4: 280/280, taking effect Q1 1927
Note:
- Q1 1925-Q4 1926 is essentially the same build queue as MoP posted earlier on, with modifications due to rules changes made.
- value ncessary for reaching econ 4 reduced to 280 due to gains made during the Dutch war, especially the incorporation of resource-rich Guyana.
Budget Q1 1927:
Total to spend: 300*1.05 (economy=4) = 315
Investments: -219.5
- Air tech 4: 32 (total invested: 72/200)
- Industrial improvement: 100
- Army tech 4: 25 (total invested: 0/200)
- Economy level 5: 62.5 (total invested: 0/500)
Navy:
- 12 for fitting out of 4 BB, 2 BC (2 BB, 1 BC fitted out in Germany)
- 35 for 70 G Type Submarines (launch Q3 1927, ready Q4 1927)
Air force:
- 24 for 240 Dornier Do-H fighters
- 24 for 240 Torpedo bombers
- 0,5 for 5 Transport planes
0 left
Total shipbuilding capacity:
160.000 tons
left: 125000 tons
Budget Q2 1927:
Total to spend: 300*1.05 (economy=4) = 315
Investments: -219.5
- Air tech 4: 32 (total invested: 104/200)
- Industrial improvement: 100
- Army tech 4: 25 (total invested: 25/200)
- Economy level 5: 62.5 (total invested: 62.5/500)
Navy:
- 12 for fitting out of 4 BB, 2 BC (2 BB, 1 BC fitted out in Germany, rady Q4 1928)
- 35 for 70 G Type Submarines (launch Q3 1927, ready Q4 1927)
Air force:
- 24 for 240 Dornier Do-H fighters
- 24 for 240 Torpedo bombers
- 0,5 for 5 Transport planes
0 left
Total shipbuilding capacity:
160.000 tons
left: 125000 tons
Completed end of Q2 1927:
480 Dornier Do-H fighters
480 torpedo planes
10 transport planes
Completed research:
- ASDIC
- long range transport planes (with Junkers as partner)
- improved armor manufacturing (with Krupp as partner)
Technologies given to Germany in exchange for their research innovations
Whoever says "education does not matter" can try ignorance
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
- Fingolfin_Noldor
- Emperor's Hand
- Posts: 11834
- Joined: 2006-05-15 10:36am
- Location: At the Helm of the HAB Star Dreadnaught Star Fist
Re: SDN World 3 Construction Queue Thread
1926Q2
Note: additional 20 IBPs for this year
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points
Total: 285 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 52 points
*: To be completed by the Balkan Confederacy
Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 26 points
**: To be built by the Sultanate
Navy
4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 205.80 points
***: 1 for the Balkan Confederacy
Total: 568.8 points (about)
110*4 IBPs surplus
To be spent on
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 57.6 points
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 16.2 points
150 IBPs aid to an unknown source.
Surplus left : 366.2 points (Aid to be repaid later.)
Note: additional 20 IBPs for this year
Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points
Total: 285 points
Army
Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point
General research = 10 points (e.g. guns, vehicle suspension etc.)
Total = 52 points
*: To be completed by the Balkan Confederacy
Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.
Air Force
4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)
50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)
Total: 26 points
**: To be built by the Sultanate
Navy
4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points
4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)
16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
Total points: 205.80 points
***: 1 for the Balkan Confederacy
Total: 568.8 points (about)
110*4 IBPs surplus
To be spent on
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 57.6 points
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 16.2 points
150 IBPs aid to an unknown source.
Surplus left : 366.2 points (Aid to be repaid later.)
Last edited by Fingolfin_Noldor on 2010-03-02 07:14pm, edited 1 time in total.
STGOD: Byzantine Empire
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
- Shinn Langley Soryu
- Jedi Council Member
- Posts: 1526
- Joined: 2006-08-18 11:27pm
- Location: COOBIE YOU KNOW WHAT TIME IT IS
Re: SDN World 3 Construction Queue Thread
Southeast Asian Union
GAME STATS
Basic industrial points: 420 points / quarter (Industry 4 = 400 points / quarter, industrial improvements = +20 points / quarter)
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 441 points / quarter during peacetime, 840 points / quarter during wartime
CONSTRUCTON ORDERS (Q3 1926)
Army
Reactivation of 3rd and 4th Guangxi Guards Reserve Armies + 3rd and 4th Guangdong Guards Reserve Armies = 32 IBPs (complete October 1926)
Air Force
N/A
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1926, construction complete October 1926, trials complete January 1927)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1926, construction complete April 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 2.1 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
2 x 55-70kT slipway = 50 IBPs (construction complete January 1928)
Industrial
Industrial improvements = 100 IBPs (+25 IBPs starting January 1927)
Economic improvements = 40 IBPs (120/500 IBPs total, Economy = 5 starting January 1929)
NOTES
80 "free" IBPs have been given retroactively due to revisions of the tech upgrade rule.
Surplus remaining: 30.7 IBPs
GAME STATS
Basic industrial points: 420 points / quarter (Industry 4 = 400 points / quarter, industrial improvements = +20 points / quarter)
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 441 points / quarter during peacetime, 840 points / quarter during wartime
CONSTRUCTON ORDERS (Q3 1926)
Army
Reactivation of 3rd and 4th Guangxi Guards Reserve Armies + 3rd and 4th Guangdong Guards Reserve Armies = 32 IBPs (complete October 1926)
Air Force
N/A
Navy
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down January 1926, construction complete October 1926, trials complete January 1927)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1926, construction complete April 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 2.1 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
2 x 55-70kT slipway = 50 IBPs (construction complete January 1928)
Industrial
Industrial improvements = 100 IBPs (+25 IBPs starting January 1927)
Economic improvements = 40 IBPs (120/500 IBPs total, Economy = 5 starting January 1929)
NOTES
80 "free" IBPs have been given retroactively due to revisions of the tech upgrade rule.
Surplus remaining: 30.7 IBPs
Last edited by Shinn Langley Soryu on 2010-03-02 12:07am, edited 3 times in total.
I ship Eino Ilmari Juutilainen x Lydia V. Litvyak.
Phantasee: Don't be a dick.
Stofsk: What are you, his mother?
The Yosemite Bear: Obviously, which means that he's grounded, and that she needs to go back to sucking Mr. Coffee's cock.
"d-did... did this thread just turn into Thanas/PeZook slash fiction?" - Ilya Muromets[/size]
Phantasee: Don't be a dick.
Stofsk: What are you, his mother?
The Yosemite Bear: Obviously, which means that he's grounded, and that she needs to go back to sucking Mr. Coffee's cock.
"d-did... did this thread just turn into Thanas/PeZook slash fiction?" - Ilya Muromets[/size]
Re: SDN World 3 Construction Queue Thread
United States of America - Q4 FY1926 (October)
Total: 550 IBPs (5 IND/5 ECON)
National Projects
Air Tech 4: 25
Army Tech 4: 25
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
United States Army
Forming 1 Armor Brigade: 10 (Complete OCT 1927)
Forming 2 Infantry Brigades w/vehicular transport: 6 (Complete OCT 1927)
Forming 1 Siege Artillery Brigade: 5 (Complete OCT 1927)
Converting 13th Division (Reserve) to active duty: 1 (Effective APR 1927)
Converting 4th Cavalry Division (Reserve) to active duty: 2 (Effective APR 1927)
United States Army Air Corps
80 P-5 [Boeing Model 15]: 8 (Complete OCT 1926)
10 B-1 [Martin NBS-1]: 1 (Complete OCT 1926)
10 O-1 [Airco DH.4]: 1 (Complete OCT 1926)
40 P-5 [Boeing Model 15]: 4 (Complete JAN 1927)
20 A-1 [Airco DH.4]: 2 (Complete JAN 1927)
40 A-2 [Curtiss Falcon]: 4 (Complete JAN 1927)
30 O-2 [Curtiss Falcon]: 3 (Complete JAN 1927)
30 B-1 [Martin NBS-1]: 3 (complete JAN 1927)
20 C-1 [Douglas C-1]: 10 (Complete JAN 1927)
United States Navy
Building South Dakota class BB (43200t): 43.2 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
4x Tampa CA (24610t): 98.4 (Construction complete APR 1927; Fitting out complete JAN 1928)
8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1928)
8x Farragut DD {Fubuki type} (1800t): 14.4 (Construction complete APR 1927; Fitting out complete JUL 1927)
TOTAL: 533 / 550
Research
Slot 1: Amphibious Landing Boat Designs
Started: October 1926
Complete: October 1927
Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: October 1926
Complete: October 1927
Slot 3: Light Tank with Suspension System
Started: October 1926
Complete: October 1927
Total: 550 IBPs (5 IND/5 ECON)
National Projects
Air Tech 4: 25
Army Tech 4: 25
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 40-55kt Slipway: 20 (Complete AUG 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
United States Army
Forming 1 Armor Brigade: 10 (Complete OCT 1927)
Forming 2 Infantry Brigades w/vehicular transport: 6 (Complete OCT 1927)
Forming 1 Siege Artillery Brigade: 5 (Complete OCT 1927)
Converting 13th Division (Reserve) to active duty: 1 (Effective APR 1927)
Converting 4th Cavalry Division (Reserve) to active duty: 2 (Effective APR 1927)
United States Army Air Corps
80 P-5 [Boeing Model 15]: 8 (Complete OCT 1926)
10 B-1 [Martin NBS-1]: 1 (Complete OCT 1926)
10 O-1 [Airco DH.4]: 1 (Complete OCT 1926)
40 P-5 [Boeing Model 15]: 4 (Complete JAN 1927)
20 A-1 [Airco DH.4]: 2 (Complete JAN 1927)
40 A-2 [Curtiss Falcon]: 4 (Complete JAN 1927)
30 O-2 [Curtiss Falcon]: 3 (Complete JAN 1927)
30 B-1 [Martin NBS-1]: 3 (complete JAN 1927)
20 C-1 [Douglas C-1]: 10 (Complete JAN 1927)
United States Navy
Building South Dakota class BB (43200t): 43.2 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Building South Dakota class BB (43200t): 43.2 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Lexington class CV (36000t): 18 (Construction complete JAN 1927; Fitting out complete JAN 1928)
4x Tampa CA (24610t): 98.4 (Construction complete APR 1927; Fitting out complete JAN 1928)
8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1928)
8x Farragut DD {Fubuki type} (1800t): 14.4 (Construction complete APR 1927; Fitting out complete JUL 1927)
TOTAL: 533 / 550
Research
Slot 1: Amphibious Landing Boat Designs
Started: October 1926
Complete: October 1927
Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: October 1926
Complete: October 1927
Slot 3: Light Tank with Suspension System
Started: October 1926
Complete: October 1927
Last edited by RogueIce on 2010-03-14 02:13pm, edited 3 times in total.
"How can I wait unknowing?
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)
"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)
"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
- CmdrWilkens
- Emperor's Hand
- Posts: 9093
- Joined: 2002-07-06 01:24am
- Location: Land of the Crabcake
- Contact:
Re: SDN World 3 Construction Queue Thread
Industrial Projects of the Mexican Empire
Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
524 In Use
Q4 1926 Current Projects
Army: (90)
Navy: (354)
Air Force: (10)
Other: (70)
============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)
=======================
Q1 1925:
Q2 1925:
Q3 1925:
Q4 1925:
Q1 1926:
Q2 1926:
Q3 1925:
Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
524 In Use
Q4 1926 Current Projects
Army: (90)
- Upgrades: (90)
- Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
- Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
Navy: (354)
- Slipways: (130)
- Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
- Four (4) Majestuoso class Battlecruisers: 220pts [(4 ships at 55 kt with 1pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
- Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
Air Force: (10)
- Acceptance testing on HP.24 Attack Plane [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
Other: (70)
- Industrial Capacity Increase: 20pts (Started Q3 1926, Round 1 Complete Q2 1927)
Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)
============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)
=======================
Q1 1925:
- 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
Q2 1925:
- 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
Q3 1925:
- IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
Q4 1925:
- Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
Q1 1926:
- VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
Q2 1926:
- Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
Q3 1925:
- Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
SDNet World Nation: Wilkonia
Armourer of the WARWOLVES
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE
"I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
-Kingdom of Heaven