SDN World 3 Construction Queue Thread

Create, read, or participate in text-based RPGs

Moderators: Thanas, Steve

Lascaris
Padawan Learner
Posts: 229
Joined: 2008-08-10 08:43am
Location: Rhodia, Nebular cluster

Re: SDN World 3 Construction Queue Thread

Post by Lascaris »

Britain Q4 1926

Industrial base: 520
Economy bonus:52
Total: 572

Infrastracture:
100 IBP to increase of industrial capacity (complete January 1927)
Upgrade 3 25-40kT Slips to 70kt slips: 60 (complete January 1927)
Create 1 70kt slip: 25 (complete April 1927)
Research Air Tech: 15 (149.95 total invested)
Research Army Tech: 5 (0 total invested)

Navy: Total 367

2 Leopard class BC: 97 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete January 1928)
24 Porpoise class submarines: 21.6 (construction complete January 1927)
8 Hurricane class DD leaders leaders: 14 (construction complete January 1927)
16 Porpoise class submarines: 14.4 (construction complete April 1927)

Completed

None
User avatar
Fingolfin_Noldor
Emperor's Hand
Posts: 11834
Joined: 2006-05-15 10:36am
Location: At the Helm of the HAB Star Dreadnaught Star Fist

Re: SDN World 3 Construction Queue Thread

Post by Fingolfin_Noldor »

1926Q3

Note: additional 22 IBPs for this year

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points (120 points thus far)
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points

Total: 285 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point

General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 52 points

*: To be completed by the Balkan Confederacy

Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)

50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 26 points

**: To be built by the Sultanate

Navy

4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points

4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)

16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
4 Minelayers/Minesweepers (1kt each) in construction till end Q1 1927 = 4 points

Total points: 208 points

***: 1 for the Balkan Confederacy

Total: 571 points (about)

110*4 IBPs surplus
To be spent on

16 Minelayers/Minesweepers (1kt each) in contruction till end Q1 1927 = 16 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 57.6 points
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 16.2 points
198 IBPs aid to an unknown source. (One time in 1926Q2)

Research
Project Confession ~ 5 years (Start Q3 1926)
Project Eagle ~ 4 years (Start Q3 1926)
Project StarStruck ~ 2 years (Star Q3 1926)

Surplus left : 276.4 points (Aid to be repaid later.)
Image
STGOD: Byzantine Empire
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
User avatar
loomer
Sith Marauder
Posts: 4260
Joined: 2005-11-20 07:57am

Re: SDN World 3 Construction Queue Thread

Post by loomer »

Q3 1926
360 points available (200 base + 150 war time + 10 from industrial investment prior year)

Prior Investments:
2 new Fighter-Carrier Zepellins: 10 Points

350 points free, 4/12 quarters of Wartime production so far.
Logistical Support for Coastal Push: 10 points

Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 250 points)
Tank manufactory program: 35 points (total now 70 + 10)
Continuing wartime production investments: 20 points
National Railroad Project: 50 points
Air Force Modernization Program (to AFT:3): 60 points
Fort Modernization Program: 50 points

New Units:
150 new fighters, 1917 grade: 15
100 new heavy bombers, 1917 grade: 50

Research: Project Manpower (Small Arms and support guns)
Research: Project Iron (Taaaaaanks)
Research: Project Toothpaste (Plaaaaaaague)

Q4 1926
360 points available (200 base + 150 war time + 10 from industrial investment prior year)


5/12 quarters of Wartime production so far.
Logistical Support for Coastal Push: 20 points
De-Mobilization Support: 60 points (to continue full force mob until Q2 1927, with steady recalls to staging areas and then back to civilian centres of origin.)

Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 250 points)
Tank manufactory program: 40 points (total now 110 + 10)
Continuing wartime production investments: 20 points
National Railroad Project: 50 points
Air Force Modernization Program (to AFT:3): 60 points
Fort Modernization Program: 50 points

Research: Project Manpower (Small Arms and support guns)
Research: Project Iron (Taaaaaanks)
Research: Project Toothpaste (Plaaaaaaague)
"Doctors keep their scalpels and other instruments handy, for emergencies. Keep your philosophy ready too—ready to understand heaven and earth. In everything you do, even the smallest thing, remember the chain that links them. Nothing earthly succeeds by ignoring heaven, nothing heavenly by ignoring the earth." M.A.A.A
User avatar
Raesene
Jedi Master
Posts: 1341
Joined: 2006-09-09 01:56pm
Location: Vienna, Austria

Re: SDN World 3 Construction Queue Thread

Post by Raesene »

Tuscan Kingdom, Q4 1926:

Infrastructure: 20 General improvements to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and abroad
total 40pts; same amount spent since game start

Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agrochemistry (fertilisers, pesticides, seed quality etc.)
naval ordnance

towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since game start

Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 3/8 | intermediate between Ark Royal and Courageous – 60 aircraft; under construction
DD |12x Nonmetalli e Semimetalli | 3 | 36 quarter 3/4 | repeat Alkalini DDs; under construction

BB |1x Patria |50 | 50 |Quarter 8/12 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 8/12| Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 7/12 |Patria-class under construction
CA |1x Mamberamo |17 | 0.85 |quarter 7/8 | Tevere-class, launched and fitting out
CA |1x Mosca |17 | 0.85 |quarter 7/8 | Tevere-class, launched and fitting out

CV |1x Cigno |22 |1.1 |quarter 8/8 | as HMS Courageous; trials
CV |1x Albatro |22 |1.1 |quarter 8/8 | as HMS Courageous; trials
BB |1x Oceano | 0 | 0 |Quarter 12/12 |1 Il Principe-class finished

Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class 1.5 | 1 |Quarter 4/4 | fitting out

MAS:
100 for Tuscany (150 ts each, 1.5 pts), under construction

completed in previous quarter:
100 for Tuscany (150 ts each)


Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.

Aircraft

Series production:
25 pts for the acquisition of license-built Hawker Horsley bombers (12 Squadrons)
4 points to acquire spare parts to get the four Horsley squadrons in storage into service
4 Squadrons of Flycatcher fighters 4 pts

Army
30 pts: Upgrade of 10 Army brigades to brigades with vehicular transport (Q 2/4)
20 pts: arms and equipment upgrade – new uniforms, better grenades, rifles,…

11,6 points to improve coastal defenses (construct bunkers, etc.)

420 points spent in total for Q4/1926

"In view of the circumstances, Britannia waives the rules."

"All you have to do is to look at Northern Ireland, [...] to see how seriously the religious folks take "thou shall not kill. The more devout they are, the more they see murder as being negotiable." George Carlin

"We need to make gay people live in fear again! What ever happened to the traditional family values of persecution and lies?" - Darth Wong
"The closet got full and some homosexuals may have escaped onto the internet?"- Stormbringer

User avatar
Shinn Langley Soryu
Jedi Council Member
Posts: 1526
Joined: 2006-08-18 11:27pm
Location: COOBIE YOU KNOW WHAT TIME IT IS

Re: SDN World 3 Construction Queue Thread

Post by Shinn Langley Soryu »

Southeast Asian Union

GAME STATS

Basic industrial points: 420 points / quarter (Industry 4 = 400 points / quarter, industrial improvements = +20 points / quarter)
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 441 points / quarter during peacetime, 840 points / quarter during wartime

CONSTRUCTON ORDERS (Q4 1926)

Army

N/A

Air Force

N/A

Navy

18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 3.2 IBPs (laid down January 1926, construction complete October 1926, trials complete January 1927)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1926, construction complete April 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 2.1 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
2 x 55-70kT slipway = 50 IBPs (construction complete January 1928)

Industrial

Industrial improvements = 100 IBPs (+25 IBPs starting January 1927)
Economic improvements = 65 IBPs (185/500 IBPs total, Economy = 5 starting January 1929)

NOTES

80 "free" IBPs have been given retroactively due to revisions of the tech upgrade rule.

Surplus remaining: 30.7 IBPs
I ship Eino Ilmari Juutilainen x Lydia V. Litvyak.

Image
ImageImageImage
Phantasee: Don't be a dick.
Stofsk: What are you, his mother?
The Yosemite Bear: Obviously, which means that he's grounded, and that she needs to go back to sucking Mr. Coffee's cock.

"d-did... did this thread just turn into Thanas/PeZook slash fiction?" - Ilya Muromets[/size]
User avatar
Fingolfin_Noldor
Emperor's Hand
Posts: 11834
Joined: 2006-05-15 10:36am
Location: At the Helm of the HAB Star Dreadnaught Star Fist

Re: SDN World 3 Construction Queue Thread

Post by Fingolfin_Noldor »

1926Q4

Note: additional 22 IBPs for this year

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points (120 points thus far)
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points

Total: 285 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point

General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 52 points

*: To be completed by the Balkan Confederacy

Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)

50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 26 points

**: To be built by the Sultanate

Navy

4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points

4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)

16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
24 US R-class submarines (improved) in trials till end Q4 1926 = 0.05*24*.57 = 0.684 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
6 U-139 (improved) in trials till end Q4 1926 = 0.05*6*1.9 = 0.57 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
8 destroyers laid down (Fubuki class) in trials till end Q4 1926 = 0.05*8 * 1.75 = 0.7 points
4 Minelayers/Minesweepers (1kt each) in construction till end Q1 1927 = 4 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 42.06 points (partial funding, 57.6-41.06 - 1 = 15.54)

Total points: 209 + 18.87 (from surplus) points

***: 1 for the Balkan Confederacy

Total: 572 points (about)

110*4 IBPs surplus
To be spent on

16 Minelayers/Minesweepers (1kt each) in contruction till end Q1 1927 = 16 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 16.54 points (partial)
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 18.87 points
198 IBPs aid to an unknown source. (One time in 1926Q2)

Research
Project Confession ~ 5 years (Start Q3 1926)
Project Eagle ~ 4 years (Start Q3 1926)
Project StarStruck ~ 2 years (Star Q3 1926)

Surplus left : 224.5 points (Aid to be repaid later.)
Image
STGOD: Byzantine Empire
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
User avatar
CmdrWilkens
Emperor's Hand
Posts: 9093
Joined: 2002-07-06 01:24am
Location: Land of the Crabcake
Contact:

Re: SDN World 3 Construction Queue Thread

Post by CmdrWilkens »

Industrial Projects of the Mexican Empire

Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
524 In Use


Q1 1927 Current Projects

Army: (82)
  • Upgrades: (72)
    • Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
    Acquisitions: (10)
    • One Brigade upgrade to New Model (1927 Medium Tank) Armored Brigade (10 pts) [Started Q1 1917, Complete Q4 1927]

Navy: (109)
  • Slipways: (40)
    • Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
    Acquisitions: (69)
    • Four (4) Majestuoso class Battlecruisers: 11pts [(4 ships at 55 kt with .05pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
      Twenty (20) S-class Mk IV Submarines: 24pts [(20 ships at 1.2kt with 1pt/kt) (Started Q1 1927, Compelte Q3 1927, Trials Q4 1927)]
      Twenty (20) Rio Grande-class Destroyers: 34pts [(20 ships at 1.7kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]

Air Force: (138)
  • Aquisitions: (88)
    • 400 Fighters (5 wings) PW-9 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      400 Attack Fighters (5 wings) HP.24 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      Eighty Reconnaissance Planes (1 wing) C-1 (8 pts) [(80 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    Technology: (50)
    • Air Tech 3 to Air Tech 4 [(50pts/qtr for 1 year, 1pt/qtr for 1 year) (Started Q1 1927, Complete Q4 1928)]

Other: (195)
  • Industrial Capacity Increase: 80pts (Started Q1 1927, Round 3 Complete Q4 1927)
    Industrial Capacity Increase: 20pts (Started Q3 1926, Round 2 Complete Q2 1927)
    Infrastructure Improvements (Inf 4 to Inf 5): 45pts (Started Q1 1927, Complete Q4 1929)
    Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)

============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)

=======================
Q1 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q1 1925, Complete Q1 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q1 1925, Complete Q1 1925)
=======================
Q2 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
=======================
Q3 1925:
  • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
    III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
    160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
    One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
    One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
=======================
Q4 1925:
  • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
    7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
    80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
=======================
Q1 1926:
  • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
    80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
    Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
=======================
Q2 1926:
  • Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
    80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
    Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
=======================
Q3 1926:
  • Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
=======================
Q4 1926:
  • Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
    Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
    Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
    Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
    Acceptance testing on HP.24 Attack Fighters [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
=======================
Last edited by CmdrWilkens on 2010-03-13 09:34pm, edited 1 time in total.
Image
SDNet World Nation: Wilkonia
Armourer of the WARWOLVES
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE

"I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
-Kingdom of Heaven
User avatar
Steve
Emperor's Hand
Posts: 9774
Joined: 2002-07-03 01:09pm
Location: Florida USA
Contact:

Re: SDN World 3 Construction Queue Thread

Post by Steve »

Q1 1927 Construction Queue

Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5

National Projects:

Air Tech 4 = 20 IBPs, 160/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date April 1927)
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Infrastructure Upgrades = 65 IBPs, 220/500, started January 1925
Nicaragua Canal Project = 20 IBPs

Total Cost: 200 IBPs


Army

6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
6 Armored Recon Battalions = 12 IBPs, complete in October 1927
2 Artillery Brigades = 6 IBPs, complete in July 1927, max effectiveness in July 1928
2 Motorized Infantry Brigades = 6 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Brigade = 9 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Recon Battalion = 2 IBPs, complete in January 1928, max effectiveness in January 1929
6 Infantry Divisions = 12 IBPs, complete in January 1927, max effectiveness in July 1928
4 Artillery Brigades = 12 IBPs, complete in January 1927, max effectiveness in January 1928
Activating 3 Infantry Divisions from Reserve = 3 IBPs, complete in July 1927


Total Cost: 102 IBPs


Navy

1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete April 1927, completion in October 1927)
10 Horton-class (1,800t) = 18 IBPs (construction phase complete October 1927, completion in January 1928)
4 Defiant-class (55,000t) = 220 IBPs (construction phase complete in April/July 1927, full completion in March-July 1928)

Total Cost: 250.9 IBPs


Air Force

20 1924-model transport aircraft = 10 IBPs (completion April 1927)
20 1924-model heavy bomber aircraft = 10 IBPs (completion January 1927)
4 prototype 1925-model carrier-based fighter/bomber aircraft = 4 IBPs (completion January 1927)

Total Cost: 10 BPs

Overall Expenditures: 564.9/566.5 IBPs


Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928

Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927
”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt

"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia

American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.

DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
User avatar
Siege
Sith Marauder
Posts: 4108
Joined: 2004-12-11 12:35pm

Re: SDN World 3 Construction Queue Thread

Post by Siege »

Egyptian Sultanate

466 pts/quarter

Q1, 1927

National Projects 100

100 Industrial Improvement

Army 95

45 5x Motorized Infantry Division (1/4)
50 5x Armored Brigade (1/4)

Air Corps 186

20 SMI-22R Recon Monoplane Prototype
20 KTW Storm Petrel Biplane Torpedobomber Prototype
25 250x Breguet 19
100 50x SMI Abdullag V/2500
21 210x Blackburn Dart

Navy 80

1 Qansuh al-Ghawri class Fast Battleship (50 KT) (3/8)
1 Leander class cruiser (10 KT) (3/4)
2 Leander class cruiser (10 KT) (1/4)

Foreign Orders

5 50x Reconnaissance fighters (1927)*
10 100x Pursuit fighters (1927)*
5 100x Fighter-bombers (1927)*
12 100x Heavy Bombers (1927)*

* Byzantine orders

RESEARCH SLOTS:

Slot 1: Cruiser Tank Design
Started: January 1925
Complete: October 1927

Slot 2: Point-to-point radio communication
Started: July 1926
Complete: January 1929

Slot 3: Battlefield rocketry
Started: July 1926
Complete: ????
Last edited by Siege on 2010-03-15 10:14am, edited 3 times in total.
Image
SDN World 2: The North Frequesuan Trust
SDN World 3: The Sultanate of Egypt
SDN World 4: The United Solarian Sovereignty
SDN World 5: San Dorado
There'll be a bodycount, we're gonna watch it rise
The folks at CNN, they won't believe their eyes
User avatar
RogueIce
_______
Posts: 13387
Joined: 2003-01-05 01:36am
Location: Tampa Bay, Florida, USA
Contact:

Re: SDN World 3 Construction Queue Thread

Post by RogueIce »

United States of America - Q1 FY1927 (January)

Total: 550 IBPs (5 IND/5 ECON)

National Projects
Air Tech 4: 25 (Upgrade complete!)
Army Tech 4: 25 (Upgrade complete!)
Upgrade Industrial Capacity: 100
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)

United States Navy
Building Fitting out South Dakota class BB (43200t): 43.2 2.16 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Building Fitting out South Dakota class BB (43200t): 43.2 2.16 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Fitting out Lexington class CV (36000t): 18 0.9 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Fitting out Lexington class CV (36000t): 18 0.9 (Construction complete JAN 1927; Fitting out complete JAN 1928)
4x Tampa CA (24610t): 98.4 (Construction complete APR 1927; Fitting out complete JAN 1928)
8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1928)
8x Farragut DD {Fubuki type} (1800t): 14.4 (Construction complete APR 1927; Fitting out complete JUL 1927)
40 FB [Boeing Model 15]: 4 (Complete APR 1927)
30 SC [Curtiss CS]: 3 (Complete APR 1927)

United States Army
Forming 1 Armor Brigade: 10 (Complete OCT 1927)
Forming 2 Infantry Brigades w/vehicular transport: 6 (Complete OCT 1927)
Forming 1 Siege Artillery Brigade: 5 (Complete OCT 1927)
Converting 13th Division (Reserve) to active duty: 1 (Effective APR 1927)
Converting 4th Cavalry Division (Reserve) to active duty: 2 (Effective APR 1927)
Upgrading 1st Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading 4th Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading Artillery Brigade (attached I Corps) to Motorized Towed Artillery: 6 (Complete JAN 1928)
Forming 4 Armored Recon Battalions: 8 (Complete JAN 1928)

United States Army Air Corps
40 P-5 [Boeing Model 15]: 4 (Complete JAN 1927)
20 A-1 [Airco DH.4]: 2 (Complete JAN 1927)
40 A-2 [Curtiss Falcon]: 4 (Complete JAN 1927)
30 O-2 [Curtiss Falcon]: 3 (Complete JAN 1927)
30 B-1 [Martin NBS-1]: 3 (complete JAN 1927)
20 C-1 [Douglas C-1]: 10 (Complete JAN 1927)
40 P-5 [Boeing Model 15]: 4 (Complete APR 1927)
20 A-2 [Curtiss Falcon]: 2 (Complete APR 1927)
10 O-2 [Curtiss Falcon]: 1 (Complete APR 1927)
40 C-1 [Douglas C-1]: 20 (Complete APR 1927)

TOTAL: 505.72 / 550

Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: October 1925
Complete: October 1927

Slot 3: Light Tank with Suspension System
Started: October 1926
Complete: October 1927
Last edited by RogueIce on 2010-03-15 07:44pm, edited 3 times in total.
Image
"How can I wait unknowing?
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)

"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
User avatar
Thanas
Magister
Magister
Posts: 30779
Joined: 2004-06-26 07:49pm

Re: SDN World 3 Construction Queue Thread

Post by Thanas »

Germany Q1 1927

Note: preliminary. May still change.

Q1 1927:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
= 948

Shipyards: -110
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete April 1927)
- 50 for construction of 2 new 55-70 kt (complete August 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete August 1927)

Investments: -145
- 20 for canal project
- infrastructure upgrade Dutch: 62,5 (total invested 187,5/500)
- economy upgrade dutch territories: 62,5 (total invested 187,5/500)

Army: 0

Navy: -659.8
- 1,8 for fitting out CV (complete Q4 1927)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC, launch April 1927)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 4 for fitting out of 4 Heavy cruisers (finished Q3 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 16 for refit of 1 Ziethen class BC (ready Q2 1927)
- 16 for refit of 1 L20alpha class BB (ready Q2 1927)
- 130 for 2 65kt BC (launch Q4 1928)
- 128 for refit of 3 L20alpha and 4 Einheit class BB (ready Q3 1927)

Naval Air Arm: -24,2
- 7,2 for 72 Dornier Do-H
- 18 for 180 torpedo bombers

Air force: - 12
- 10 for first payment to the Balkan Confederacy
- 0,4 for 4 Fokker D. XIV
- 0,4 for 4 Gloster Grebe
- 1 for 10 Fokker D.XIII
- 0,2 for 2 transport planes

Others: +7
- 14 for coastal shipping initiative (total invested: 51)
+ 11 from scrapping SS Bremen
+ 10 surplus from SH shell research

left: 0


New research projects:

- dive bombers started Q1 1927
- standardization/mass production of merchant ships/escorts started Q1 1927
- early radar (may change)


Completed research:
- superheavy shells
- 100kt shipyard
- 20" guns[/s]

Completed at end of this quarter:
- 4 Gloster Grebe
- 10 Fokker D.XIII
- 2 transport planes
- coastal shipping initiative (total invested 65)
- 180 torpedo bombers
- 72 Dornier Do-H
- refit of 1 Ziethen class BC (ready Q2 1927)
- refit of 1 L20alpha class BB (ready Q2 1927)
- upgrade of 2 55kt yards to 55-70kt yards

Ships launched:
- 2 Scharnhorst class BCs
- 2 Imperator class BBs


Gained from Spain in exchange for own technology research:
- long range transport planes
- improved armor manufacturing capabilities
- improved ASDIC
Whoever says "education does not matter" can try ignorance
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
User avatar
Beowulf
The Patrician
Posts: 10621
Joined: 2002-07-04 01:18am
Location: 32ULV

Re: SDN World 3 Construction Queue Thread

Post by Beowulf »

Manchuria

Q4/1925
525 pts available

National projects:
48pts economy improvement

Army:
Units:

5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 2/4
3 Infantry division motorization - 9 points ea - 27 points 2/4
+1 Armor Regiment - 10 points 2/4
40 points

4 Armored Brigades (for upgrade of secondary reserve Corps) 3/4
40 pts

2 Motor Artillery Brigade - 6 points 2/4
4 Armor Regiment - 10 points 2/4
52pt

Complete:
12 Infantry division - 2 points ea - 6 points 1/2

suspended:
2 Motor Artillery Brigade - 6 points 2/4
8 Armor Regiment - 10 points 1/4


Cancelled:
12 Motor Infantry division - 9 points ea - 27 points 2/4
12 Motor Infantry division - 9 points ea - 27 points 1/4
12 Infantry division - 2 points ea - 27 points 1/2
International Volunteer Division - 3 pts 1/2
4 Artillery Brigade - 3 points 2/4
4 Motor Artillery Brigade - 6 points 1/4
4 Artillery Brigade - 3 points 1/4


Aircraft:
30 J-2 - 3 points

183 pts total

Fortresses:
Defense line Yat densification
Hailar He/Heilongjiang Section - 3 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 33 pts 3/4 complete

Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts 3/4 complete
44pts total

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 3/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 3/8 complete Winter 1927- Incheon Naval Shipyard
35pts total

Ships:
4 CA1923 - 2.5pts/qtr ea 8/8 complete 3/4 fitting out
2 BB1925 - 40 pts/qtr ea 3/8 complete
2 CA1925 - 53 pts/qtr ea 3/8 complete
4 CS1923 - 12.1 pts/qtr ea 3/5.33 complete
12 DD1923 - 1.2pts/qtr 1/3 complete

4 DD1923 - 1.2 pts/qtr 3/3 complete

258.8pts total

Aircraft:

Remaining 4.2 pts

Q1/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:

5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 3/4
3 Infantry division motorization - 9 points ea - 27 points 3/4
+1 Armor Regiment - 10 points 3/4
40 points

2 Motor Artillery Brigade - 6 points 3/4
4 Armor Regiment - 10 points 3/4
4 Armor Regiment - 10 points 1/4
2 Motor Artillery Brigade - 6 points 2/4

Complete:
4 Armored Brigades (for upgrade of secondary reserve Corps) 4/4

suspended:
4 Armor Regiment - 10 points 1/4

Aircraft:
30 Q-3 - 3 points

183 pts total

Fortresses:
Defense line Yat densification
Hailar He/Heilongjiang Section - 3 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 33 pts 4/4 complete
Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts 4/4 complete
44pts total

Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 0/4 complete

Repair of war damaged fortifications
11 pts 0/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 0/4 complete
48 pts total

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 4/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 4/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 0/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 4/8 complete
2 CA1925 - 53 pts/qtr ea 4/8 complete
4 CS1923 - 12.1 pts/qtr ea 4/5.33 complete
12 DD1923 - 1.2pts/qtr 2/3 complete

4 CA1923 - 2.5pts/qtr ea 8/8 complete 4/4 fitting out
Aircraft:
30 Q-3

226.8pts total

Remaining 7.2 pts

Q2/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
60pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
2 Motor Artillery Brigade - 6 points 3/4
92pts

Complete:
5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 4/4
3 Infantry division motorization - 9 points ea - 27 points 4/4
+1 Armor Regiment - 10 points 4/4
2 Motor Artillery Brigade - 6 points 4/4
4 Armor Regiment - 10 points 4/4


Aircraft:
30 Q-3 - 3 points

143 pts total

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 1/4 complete

Repair of war damaged fortifications
11 pts 1/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 1/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 0/4 complete


Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 5/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 5/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 1/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 5/8 complete
2 CA1925 - 53 pts/qtr ea 5/8 complete
4 CS1923 - 12.1 pts/qtr ea 5/5.33 complete
12 DD1923 - 1.2pts/qtr 3/3 complete 0/1 fitting out

Aircraft:
30 Q-3

226.8pts total

Remaining 6.2 pts

Q3/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
3 Infantry Div
1 Artillery Regt
9 pts


Complete:
2 Motor Artillery Brigade - 6 points 4/4

Aircraft:
30 Q-3 - 3 points

143 pts total

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 2/4 complete

Repair of war damaged fortifications
11 pts 2/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 2/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 1/4 complete

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 6/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 6/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 2/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 6/8 complete
2 CA1925 - 53 pts/qtr ea 6/8 complete
4 CS1923 - 0.6 pts/qtr ea 5.33/5.33 complete .67/2.67 fitting out
12 DD1923 - 1.2pts/qtr 3/3 complete 1/1 fitting out

Aircraft:
20 Q-3

191.4 pts total

Remaining 0.6 pts

Q4/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
3 Infantry Div 1/2
1 Artillery Regt 1/4
9 pts


Complete:
4 Armor Regiment - 10 points 4/4

Aircraft:
30 Q-3 - 3 points

143 pts total

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 3/4 complete

Repair of war damaged fortifications
11 pts 3/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 3/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 2/4 complete

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 7/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 7/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 3/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 7/8 complete
2 CA1925 - 53 pts/qtr ea 7/8 complete
4 CS1923 - 0.6 pts/qtr ea 5.33/5.33 complete 1.67/2.67 fitting out

Aircraft:
20 Q-3

191.4 pts total

Remaining 0.6 pts

Q1/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
3 Infantry Div 1/2
1 Artillery Regt 1/4
9 pts

Reserve Infantry divisions:
6 inf div 0/2
12 pts


Complete:
4 Armor Regiment - 10 points 4/4

Aircraft:
30 Q-3 - 3 points

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 4/4 complete

Repair of war damaged fortifications
11 pts 4/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 4/4 complete
48 pts total


Defense line San creation
16 fortress brigades - 3pts ea 0/4 complete
48 pts total


Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 3/4 complete

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 8/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 8/8 complete Winter 1927- Incheon Naval Shipyard
35pts total

1 new 70kton slips - 25 points, 4/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 0/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 0/4 fitting out
2 CA1925 - 53 pts/qtr ea 0/8 complete 0/4 fitting out
4 CS1923 - 0.6 pts/qtr ea 5.33/5.33 complete 2.67/2.67 fitting out
3 CS1927 - 15 pts/qtr ea 0/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 0/5 complete 0/3 fitting out
5 SS1927 - 1.8 pts/qtr ea 0/3 complete 0/1 fitting out

Aircraft:
30 Q-3

222.3 pts total

Remaining 3.7 pts

Q2/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
56pts economy improvement - economy improvement cost satisfied, completion by 1928q1

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
1 Artillery Regt 2/4
3 pts

Reserve Infantry divisions:
6 inf div 1/2
12 pts

Motor Infantry Divisions:
5 motor inf div 0/4
45 pts


Complete:
4 Armor Regiment - 10 points 4/4
3 Infantry Div 1/2


Aircraft:
30 Q-3 - 3 points

Fortresses:

Defense line San creation
16 fortress brigades - 3pts ea 1/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 4/4 complete


Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 5/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 1/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 1/4 fitting out
2 CA1925 - 53 pts/qtr ea 1/8 complete 0/4 fitting out
3 CS1927 - 15 pts/qtr ea 1/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 1/5 complete 0/3 fitting out
5 SS1927 - 1.8 pts/qtr ea 1/3 complete 0/1 fitting out

Aircraft:
30 Q-3

222.3 pts total

Remaining 0.7 pts

Q3/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
0pts economy improvement - economy improvement cost satisfied, completion by 1928q1
40 pts industrial improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
1 Artillery Regt 3/4
3 pts

Reserve Infantry divisions:
6 inf div 0/2
12 pts


Motor Infantry Divisions:
5 motor inf div 1/4
45 pts


Complete:
4 Armor Regiment - 10 points 4/4
6 inf div 2/2


Aircraft:
30 Q-3 - 3 points
10 J-3 prototype - 10 pts

Fortresses:

Defense line San creation
16 fortress brigades - 3pts ea 2/4 complete
48 pts total

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 6/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 2/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 2/4 fitting out
2 CA1925 - 53 pts/qtr ea 2/8 complete 0/4 fitting out
3 CS1927 - 15 pts/qtr ea 2/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 2/5 complete 0/3 fitting out
5 SS1927 - 1.8 pts/qtr ea 2/3 complete 0/1 fitting out

Aircraft:
30 Q-3

222.3 pts total

Remaining 6.7 pts

Q4/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
0pts economy improvement - economy improvement cost satisfied, completion by 1928q1
40 pts industrial improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts


Reserve Infantry divisions:
6 inf div 1/2
12 pts

Motor Infantry Divisions:
5 motor inf div 2/4
45 pts


Complete:
1 Artillery Regt 4/4
4 Armor Regiment - 10 points 4/4


Aircraft:
30 Q-3 - 3 points
10 J-3 prototype - 10 pts

Fortresses:

Defense line San creation
16 fortress brigades - 3pts ea 3/4 complete
48 pts total

4 fortress brigades - 3pts ea 0/4 complete
12 pts total


Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 7/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 3/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 3/4 fitting out
2 CA1925 - 53 pts/qtr ea 3/8 complete 0/4 fitting out
3 CS1927 - 15 pts/qtr ea 3/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 3/5 complete 0/3 fitting out
5 SS1927 - .09 pts/qtr ea 3/3 complete 0/1 fitting out

Aircraft:
30 Q-3

217.8 pts total

Remaining 9.2 pts
"preemptive killing of cops might not be such a bad idea from a personal saftey[sic] standpoint..." --Keevan Colton
"There's a word for bias you can't see: Yours." -- William Saletan
User avatar
Fingolfin_Noldor
Emperor's Hand
Posts: 11834
Joined: 2006-05-15 10:36am
Location: At the Helm of the HAB Star Dreadnaught Star Fist

Re: SDN World 3 Construction Queue Thread

Post by Fingolfin_Noldor »

1927Q1

Base: 500 IBP
Added: 40 IBP
Bonus: 54 IBP
Total: 594 IBP

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points (160 points thus far)
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
Investment: 100 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points

Total: 210 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
Motorization: 7 infantry divisions till end Q4 1927 = 7 * 7 = 49 points *
3 Varangian Guard Bde = 3*3 = 9 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point

General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 61 points

*: To be completed by the Balkan Confederacy

Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)

50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **

50 Reconnaissance fighters (1927) = 5 points **
100 Pursuit fighters (1927) = 10 points **
50 Fighter-bombers (1927) = 5 points **
24 Heavy Bombers (1927) = 12 points **

General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 32 points

**: To be built by the Sultanate

Navy

4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points

4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)

16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
6 U-139 (improved) in trials till end Q4 1926 = 0.05*6*1.9 = 0.57 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
8 destroyers laid down (Fubuki class) in trials till end Q4 1926 = 0.05*8 * 1.75 = 0.7 points
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
24 US R-class submarines (improved) in trials till end Q4 1926 = 0.05*24*.57 = 0.684 points
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
2 Heraclius class Battleships under construction till end of end Q4 1928 (65,000tonnes) = 65*2 = 125+5 points (5 from surplus)
4 Minelayers/Minesweepers (1kt each) in construction till end Q1 1927 = 4 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 42.06 points (partial funding, 57.6-41.06 - 1 = 15.54)
32 destroyers laid down (Fubuki class) in trials till end Q1 1927 = 0.05*16* 1.8 = 0.144

Total points: 289.15 points

***: 1 for the Balkan Confederacy

Total: 594 points (about. This also accounts for 6 additional IBPs paid by Balkan Confederacy)

110*4 IBPs surplus
To be spent on

16 Minelayers/Minesweepers (1kt each) in contruction till end Q1 1927 = 16 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 16.54 points (partial)
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 16.2 points
198 IBPs aid to an unknown source. (One time in 1926Q2)

Research
Project Confession I ~ 3 years (Start Q1 1925)
Project Eagle I ~ 2 years (Start Q1 1925)
Improved Armor Manufacturing Techniques ~ 3 years (Start Q1 1927)
Project StarStruck ~ 2 years (Start Q1 1925)


Surplus left : 222.0 points (Aid to be repaid later.)
Last edited by Fingolfin_Noldor on 2010-03-29 10:01am, edited 3 times in total.
Image
STGOD: Byzantine Empire
Your spirit, diseased as it is, refuses to allow you to give up, no matter what threats you face... and whatever wreckage you leave behind you.
Kreia
User avatar
DarthShady
Jedi Council Member
Posts: 1872
Joined: 2007-09-15 10:46am
Location: Sarajevo, Bosnia and Herzegovina
Contact:

Re: SDN World 3 Construction Queue Thread

Post by DarthShady »

The Balkan Confederacy
Construction Queue - (Q1, Q2, Q3, Q4) - 1926

Total IBP's: 400 IBPs(4 Industry) + 5%(4 Economy) = 420 IBP's

Q1, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (5/8)
2x 55-70kT Slip =50 IBP's (5/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (5/8)
3x Armored Brigade = 30 IBP's (5/8)

5x Armored Recon Battalion = 10 IBP's (1/4)
5x Motorized Artillery Brigade =30 IBP's (1/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (1/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (1/4)

*: For the Byzantine Empire

Air Force
100 Avia BH-21 = 10 IBP's
200 Fokker D.XIV = 20 IBP's
200 Gloster Grebe = 20 IBP's

100 Blackburn Dart = 10 IBP's
80 Vickers Virginia = 40 IBP's

4 Airship Carrier = 20 IBP's (1/2)

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (1/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (1/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (1/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Q2, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (6/8)
2x 55-70kT Slip =50 IBP's (6/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (6/8)
3x Armored Brigade = 30 IBP's (6/8)

5x Armored Recon Battalion = 10 IBP's (2/4)
5x Motorized Artillery Brigade =30 IBP's (2/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (2/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (2/4)

*: For the Byzantine Empire

Air Force
100 Avia BH-21 = 10 IBP's
200 Fokker D.XIV = 20 IBP's
200 Gloster Grebe = 20 IBP's

100 Blackburn Dart = 10 IBP's
80 Vickers Virginia = 40 IBP's

4 Airship Carrier = 20 IBP's (2/2)

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (2/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (2/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (2/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Q3, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (7/8)
2x 55-70kT Slip =50 IBP's (7/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (7/8)
3x Armored Brigade = 30 IBP's (7/8)

5x Armored Recon Battalion = 10 IBP's (3/4)
5x Motorized Artillery Brigade =30 IBP's (3/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (1/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (3/4)

*: For the Byzantine Empire

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (3/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (3/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (3/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Q4, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (8/8)
2x 55-70kT Slip =50 IBP's (8/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (8/8)
3x Armored Brigade = 30 IBP's (8/8)

5x Armored Recon Battalion = 10 IBP's (4/4)
5x Motorized Artillery Brigade =30 IBP's (4/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (2/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (4/4)

*: For the Byzantine Empire

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (4/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (4/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (4/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's
Doomriser
Padawan Learner
Posts: 484
Joined: 2002-07-03 05:08pm

Re: SDN World 3 Construction Queue Thread

Post by Doomriser »

Bolivarian Union

Q1 1927

National Projects

40 IBP for industrial expansion
15 IBP for 5 100/200-line (interlaced) television transmitters and television distribution
20 IBP for employment equity

= 75 IBP

Air

20 NiD 42 = 2 IBP
20 Dewoitine D 21 = 2 IBP
20 F8C = 2 IBP
100 Siskin IIIA = 10 IBP
24 TB-1 = 12 IBP
70 Trainers = 7 IBP
Horsely Prototype = 5 IBP
Horsely engine replacements = 10 IBP
R-6 Escort Fighter Prototype [Model 1924] = 2 IBP
Savoia-Marchetti S.55 Flying Boat [Model 1924] Prototype = 5 IBP

= 57 IBP

Naval

(See Q4 1926) 106 IBP
4 IBP for begin build of 9 H21-class coastal submarines
5 IBP for begin build of 5 Evolved Mittel-U submarines

= 115 IBP

Army

Continuing production of 6 motorized infantry brigades = 18 IBP
Upgrade two coastal fortresses to 16.5-inch guns purchased from Brazil = 30 IBP
Begin light amphibious tank prototype = 15 IBP

= 63 IBP

= 310 IBP

--

Q2 1927


National Projects

75 IBP (see Q1)

Air force

20 NiD 42 - 2 IBP
60 Siskin IIIA - 3 IBP
36 TB-1 - 18 IBP
50 Trainers - 5 IBP
R-6 Escort Fighter Prototype Evaluation - 4 IBP
S-55 Flying Boat Prototype Evaluation - 5 IBP

Undisclosed number of aircraft for Tuscan Kingdom [paid for by Tuscan Kingdom] + 1 IBP Profit)

Begin construction of coastal "sisters" to Talara and Lima AFB = 10 IBP (Complete Q2 1929)

= 47 IBP

Navy

(see Q1, 1927)

= 115 IBP

Army

Complete upgrade of 6 brigades to fully-motorized status = 18 IBP
Complete upgrade of two coastal fortresses to 16.5-inch guns purchased from Brazil - 30 IBP
Continue light amphibious tank prototype - 25 IBP

= 73 IBP

= 310 IBP

Q3 1927

National Projects

40 IBP for industrial expansion
20 IBP for employment equity
10 IBP for 3 100/200-line (interlaced) television transmitters and television distribution

= 70 IBP

Air

12 Squadrons of Hawker Horsely = 25 IBP
100 NID 42 = 10 IBP
20 F8C = 2 IBP
100 Siskin IIIA = 10 IBP
48 TB-1 = 24 IBP
30 Trainers = 3 IBP
Fairey Fox Prototype = 1 IBP
R-6 Escort Fighter Second Prototype [Model 1924] = 3 IBP
Savoia-Marchetti S.55 Flying Boat Production Prototype = 5 IBP
Night Bomber Prototype = 5 IBP
Coastal Airbases - 10 IBP

Total = 98 IBP

Army

Continue Light Amphibious Tank Prototype - 20 IBP
Upgrade 12 brigades to fully-motorized status - 36 IBP

= 56 IBP

Naval

86 IBP [See Q2 minus 29 IBP for ships from Q4 1926 that are now in trials]

= 310 IBP

Q4 1927

National Projects

40 IBP for industrial expansion
20 IBP for employment equity
10 IBP for 3 100/200-line (interlaced) television transmitters and television distribution

= 70 IBP

Air

6 Squadrons of Hawker Horsely = 13 IBP
40 NID 42 = 4 IBP
30 Siskin IIIA = 3 IBP
48 TB-1 = 24 IBP
20 Trainers = 2 IBP
Fairey Fox Prototype Evaluation = 1 IBP
R-6 Escort Fighter Second Prototype Evaluation [Model 1924] = 3 IBP
Savoia-Marchetti S.55 Flying Boat Production Prototype Evaluation = 5 IBP
Night Bomber Prototype Evaluation = 5 IBP
Coastal Airbases - 10 IBP

= 70 IBP

Naval

75 IBP existing construction (30 of which is Sparta-class cruisers)
Begin build of 20 Rupicola-class torpedo boats = 19 IBP
Begin build of 6 Fubuki-class destroyers = 11 IBP
Prototype Super Rupicola Torpedo Boat = 1 IBP
1 IBP trials

=107 IBP

Army

Complete Light Amphibious Tank Prototype - 20 IBP
Upgrade 10 brigades to fully-motorized status - 30 IBP

= 56 IBP


Research

Slot 1: Project 940 (With Brazil)
Started: January, 1926
Complete: January, 1931

Slot 2: 22.4-inch Air-dropped Torpedo
Started: July, 1926
Complete: July, 1929

Slot 3: Television Applications Program
Started: January, 1927
Complete: June, 1927

Slot 3: Project Owl
Started: June, 1927
Complete: ?
Last edited by Doomriser on 2010-06-12 05:31pm, edited 5 times in total.
User avatar
loomer
Sith Marauder
Posts: 4260
Joined: 2005-11-20 07:57am

Re: SDN World 3 Construction Queue Thread

Post by loomer »

Afghanistan, Q1 1927
Total allowance: 210

New Projects:
25-40kT slipway in Kandahar (why yes, it's a desert. All part of the sinister plan.): 15 points

Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 300 points, final invest for AF:2 unless anyone objects)
Tank manufactory program: 40 points (total now 150 + 10, final invest)
Production investments: 20 points
National Railroad Project: 10 points (for IF:2/3. At somewhere around ~80 points now)
Air Force Modernization Program (to AFT:3): 20 points (now 80 total)
Fort Modernization Program: 20 points (Now 70 total)

War Payments to Unknown Beneficiaries: 30 points

Research: Project Manpower Mark 2 (Small Arms and support guns)
Research: Project Iron (Taaaaaanks)
Research: Project Toothpaste (Plaaaaaaague)

Surplus: 5 points
"Doctors keep their scalpels and other instruments handy, for emergencies. Keep your philosophy ready too—ready to understand heaven and earth. In everything you do, even the smallest thing, remember the chain that links them. Nothing earthly succeeds by ignoring heaven, nothing heavenly by ignoring the earth." M.A.A.A
User avatar
CmdrWilkens
Emperor's Hand
Posts: 9093
Joined: 2002-07-06 01:24am
Location: Land of the Crabcake
Contact:

Re: SDN World 3 Construction Queue Thread

Post by CmdrWilkens »

Industrial Projects of the Mexican Empire

Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
522.8 In Use


Q2 1927 Current Projects

Army: (58)
  • Upgrades: (48)
    • Sixteen (16) Brigades upgrade to Motor Transport (3 pts) [Started Q2 1927 Complete Q1 1928]
      One (1) Brigade upgraded to Armored Bde (see below) (2 pts) [Started Q2 1927 Complete Q1 1928]
    Acquisitions: (10)
    • Brigade acceptance testing New Model (1927 Medium and 1925 Light Tank) (10 pts) [Started Q1 1917, Complete Q4 1927]

Navy: (157.8)
  • Slipways: (40)
    • Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
    Acquisitions: (117.8)
    • Two (2) Hispaniola class Aircraft Carriers: 48.8 pts [(2 ships at 24.4 kt with 1pt/1 kt) (Started Q2 1927, Complete Q2 1928, Trials Q1 1929)]
      Four (4) Majestuoso class Battlecruisers: 11pts [(4 ships at 55 kt with .05pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
      Twenty (20) S-class Mk IV Submarines: 24pts [(20 ships at 1.2kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]
      Twenty (20) Rio Grande-class Destroyers: 34pts [(20 ships at 1.7kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]

Air Force: (112)
  • Aquisitions: (62)
    • 160 Fighters (2 wings) PW.9 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      160 Attack Fighters (2 wings) HP.24 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      20 Transport Planes (1 Squadron plus fill out) T.11 (10 pts) [(20 planes at 1pt/2) )Started Q2 1927 Complete Q2 1927)]
      Acceptance testing on TBN.1 Torpedo Plane [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
      Acceptance testing on FN.1 Naval Fighter [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
    Technology: (50)
    • Air Tech 3 to Air Tech 4 [(50pts/qtr for 1 year, 0pt/qtr for 1 year) (Started Q1 1927, Complete Q4 1928)]

Other: (195)
  • Industrial Capacity Increase: 80pts (Started Q1 1927, Round 3 Complete Q4 1927)
    Industrial Capacity Increase: 20pts (Started Q3 1926, Round 2 Complete Q2 1927)
    Infrastructure Improvements (Inf 4 to Inf 5): 45pts (Started Q1 1927, Complete Q4 1929)
    Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)

============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)

=======================
Q1 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q1 1925, Complete Q1 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q1 1925, Complete Q1 1925)
=======================
Q2 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
=======================
Q3 1925:
  • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
    III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
    160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
    One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
    One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
=======================
Q4 1925:
  • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
    7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
    80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
=======================
Q1 1926:
  • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
    80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
    Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
=======================
Q2 1926:
  • Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
    80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
    Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
=======================
Q3 1926:
  • Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
=======================
Q4 1926:
  • Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
    Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
    Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
    Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
    Acceptance testing on HP.24 Attack Fighters [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
=======================
Q1 1927:
  • Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
    400 Fighters (5 wings) PW-9 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    400 Attack Fighters (5 wings) HP.24 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    Eighty Reconnaissance Planes (1 wing) C-1 (8 pts) [(80 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
Last edited by CmdrWilkens on 2010-04-01 06:23pm, edited 2 times in total.
Image
SDNet World Nation: Wilkonia
Armourer of the WARWOLVES
ASVS Vet's Association (Class of 2000)
Former C.S. Strowbridge Gold Ego Award Winner
MEMBER of the Anti-PETA Anti-Facist LEAGUE

"I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
-Kingdom of Heaven
User avatar
Steve
Emperor's Hand
Posts: 9774
Joined: 2002-07-03 01:09pm
Location: Florida USA
Contact:

Re: SDN World 3 Construction Queue Thread

Post by Steve »

Q2 1927 Construction Queue

Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5

National Projects:

Air Tech 4 = 20 IBPs, 180/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date April 1927)
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Infrastructure Upgrades = 90 IBPs, 285/500, started January 1925
Nicaragua Canal Project = 20 IBPs

Total Cost: 105 IBPs


Army

6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
6 Armored Recon Battalions = 12 IBPs, complete in October 1927
2 Artillery Brigades = 6 IBPs, complete in July 1927, max effectiveness in July 1928
2 Motorized Infantry Brigades = 6 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Brigade = 9 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Recon Battalion = 2 IBPs, complete in January 1928, max effectiveness in January 1929
Activating 3 Infantry Divisions from Reserve = 3 IBPs, complete in July 1927


Total Cost: 102 IBPs


Navy

1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete April 1927, completion in October 1927)
1 Eagle-class (12,933t) = .7 IBPs (construction complete, completion in October 1927)
10 Horton-class (1,800t) = 18 IBPs (construction phase complete October 1927, completion in January 1928)
4 2 Defiant-class (55,000t) = 110 IBPs (construction phase complete April/July 1927, full completion in March-July 1928)
2 Defiant-class (55,000t) = 5.5 IBPs (construction complete, full completion in April 1928)
2 Excalibur-class (64,400t) = 128.8 IBPs (construction phase complete April 1929, full completion in October 1930)
5 Seattle-class (10,600t) = 53 IBPs (construction phase complete July 1928, full completion in April 1929)

Total Cost: 328.9 IBPs


Air Force

20 1924-model transport aircraft = 10 IBPs (completion April 1927)
5 1926-model fighter aircraft = 5 IBPs (completion July 1927)

Total Cost: 5 BPs

Overall Expenditures: 565.9/566.5 IBPs


Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928

Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927
”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt

"No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia

American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.

DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
User avatar
RogueIce
_______
Posts: 13387
Joined: 2003-01-05 01:36am
Location: Tampa Bay, Florida, USA
Contact:

Re: SDN World 3 Construction Queue Thread

Post by RogueIce »

United States of America - Q2 FY1927 (April)

Total: 550 IBPs (5 IND/5 ECON)

National Projects
Upgrade Industrial Capacity: 100
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)

United States Navy
Fitting out South Dakota class BB (43200t): 2.16 (Fitting out complete JAN 1928)
Fitting out South Dakota class BB (43200t): 2.16 (Fitting out complete JAN 1928)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Fitting out Lexington class CV (36000t): 0.9 (Fitting out complete JAN 1928)
Fitting out Lexington class CV (36000t): 0.9 (Fitting out complete JAN 1928)
Fitting out 4x Tampa CA (24610t): 98.4 4.92 (Construction complete APR 1927; Fitting out complete JAN 1928)
Building 8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1928)
Fitting out 8x Farragut DD {Fubuki type} (1800t): 14.4 0.72 (Construction complete APR 1927; Fitting out complete JUL 1927)
Building 10x Farragut DD {Fubuki type} (1800t): 18 (Construction complete JAN 1928; Fitting out complete APR 1928)
40 FB [Boeing Model 15]: 4 (Complete APR 1927)
30 SC [Curtiss CS]: 3 (Complete APR 1927)
40 FB [Boeing Model 15]: 4 (Complete JUL 1927)
40 SC [Curtiss CS]: 4 (Complete JUL 1927)
20 TD [Douglas C-1]: 10 (Complete JUL 1927)

United States Army
Forming 1 Armor Brigade: 10 (Complete OCT 1927)
Forming 2 Infantry Brigades w/vehicular transport: 6 (Complete OCT 1927)
Forming 1 Siege Artillery Brigade: 5 (Complete OCT 1927)
Converting 13th Division (Reserve) to active duty: 1 (Effective APR 1927)
Converting 4th Cavalry Division (Reserve) to active duty: 2 (Effective APR 1927)
Upgrading 1st Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading 4th Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading Artillery Brigade (attached I Corps) to Motorized Towed Artillery: 6 (Complete JAN 1928)
Forming 4 Armored Recon Battalions: 8 (Complete JAN 1928)

United States Army Air Corps
40 P-5 [Boeing Model 15]: 4 (Complete APR 1927)
20 A-2 [Curtiss Falcon]: 2 (Complete APR 1927)
10 O-2 [Curtiss Falcon]: 1 (Complete APR 1927)
40 C-1 [Douglas C-1]: 20 (Complete APR 1927)
30 P-5 [Boeing Model 15]: 3 (Complete JUL 1927)
10 A-2 [Curtiss Falcon]: 1 (Complete JUL 1927)
20 O-2 [Curtiss Falcon]: 2 (Complete JUL 1927)

TOTAL: 531.56 / 550

Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: October 1925
Complete: October 1927

Slot 3: Light Tank with Suspension System
Started: October 1926
Complete: October 1927
Image
"How can I wait unknowing?
This is the price of war,
We rise with noble intentions,
And we risk all that is pure..." - Angela & Jeff van Dyck, Forever (Rome: Total War)

"On and on, through the years,
The war continues on..." - Angela & Jeff van Dyck, We Are All One (Medieval 2: Total War)
"Courage is not the absence of fear, but rather the judgment that something else is more important than fear." - Ambrose Redmoon
"You either die a hero, or you live long enough to see yourself become the villain." - Harvey Dent, The Dark Knight
User avatar
Raesene
Jedi Master
Posts: 1341
Joined: 2006-09-09 01:56pm
Location: Vienna, Austria

Re: SDN World 3 Construction Queue Thread

Post by Raesene »

Tuscan Kingdom, Q1 1927:

Infrastructure: 20 General improvements to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and abroad
total 40pts; same amount spent since game start

Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agrochemistry (fertilisers, pesticides, seed quality etc.)
naval ordnance

towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since game start

Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 4/8 | intermediate between Ark Royal and Courageous – 60 aircraft; under construction
DD |12x Artigleri | 3 | 36 quarter 1/4 | repeat Alkalini DDs; under construction
DL |12x Diamante | 4.5 | 54 quarter 1/4 | Diamante-class (very) large destroyers/small cruisers; under construction

DD |12x Nonmetalli e Semimetalli | 4 | 1.8 quarter 4/4 | repeat Alkalini DDs; trials
BB |1x Patria |50 | 2.5 |Quarter 9/12 | Patria-class fitting out
BB |1x Africa |50 | 2.5 |Quarter 9/12| Patria-class fitting out

BB |1x Tasmania |50 | 50 |Quarter 8/12 |Patria-class under construction
CA |1x Mamberamo |17 | 0.85 |quarter 8/8 | Tevere-class, trials
CA |1x Mosca |17 | 0.85 |quarter 8/8 | Tevere-class, trials
CV |1x Cigno | as HMS Courageous; finished
CV |1x Albatro |as HMS Courageous; finished
Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class finished


MAS:
50 for Tuscany (150 ts each, 7.5 pts), under construction

60 MAS (30ts each) for Germany (1.8 pts, 2 pts payment-> +0.2pts; vessels to be delivered April 1927)

completed in previous quarter: 100 for Tuscany (150 ts each)

Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.

Aircraft

Series production:
25 pts for the acquisition of license-built Hawker Horsley bombers (12 Squadrons)
10 Squadrons of Dart bombers 20 pts
18 Squadrons of Flycatcher fighters 18 pts

Army
30 pts: Upgrade of 10 Army brigades to brigades with vehicular transport (Q 3/4)
40 points to improve coastal defenses (construct bunkers, etc.)

420.2 points spent in total for Q1/1927

"In view of the circumstances, Britannia waives the rules."

"All you have to do is to look at Northern Ireland, [...] to see how seriously the religious folks take "thou shall not kill. The more devout they are, the more they see murder as being negotiable." George Carlin

"We need to make gay people live in fear again! What ever happened to the traditional family values of persecution and lies?" - Darth Wong
"The closet got full and some homosexuals may have escaped onto the internet?"- Stormbringer

User avatar
Thanas
Magister
Magister
Posts: 30779
Joined: 2004-06-26 07:49pm

Re: SDN World 3 Construction Queue Thread

Post by Thanas »

German Empire Q2 1927:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
= 948

Shipyards: - 80
- 50 for construction of 2 new 55-70 kt yards (complete Q2 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q2 1927)

Investments: - 159
- 20 for canal project
- infrastructure upgrade Dutch: 62,5 (total invested 250/500)
- economy upgrade dutch territories: 62,5 (total invested 250/500)
- 14 for Rhein Donau canal

Army: 0

Navy: - 669.8
- 1,8 for fitting out CV conversion (complete Q4 1927)
- 11 for fitting out new ships (2 Imperator BB, 2 Scharnhorst class BC) (complete Q2 1928)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q2 1927, finished Q3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q2 1927, finished Q3 1928)
- 4 for fitting out of 4 Heavy cruisers (finished Q3 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 3 for fitting out of 6 Hamburg class light cruisers (finished Q3 1927)
- 90 for 9 Utrecht class light cruisers (launch Q1 1928, ready Q3 1928)
- 128 for refitting 3 L20alpha and 4 Einheit class BB (ready Q2 1927)
- 130 for 2 65kt BC (launch Q4 1928)
- 120 for 2 60kt BB (launch Q1 1929)
- 52 for 3 Bremen class liners (launch Q1 1929, ready Q2 1930)
- 25 for 1 25kt Aircraft carrier (launch Q2 1928)
- 21 for 6 Rapidkreuzer (3,5kt each) (launch Q4 1927)

Naval Air Arm: - 25,2

- 7,2 for 72 Dornier Do-H
- 18 for 180 torpedo bombers


Air force: -16

- 15 for second payment to Balkan Confederacy
- 1 for 20 Transport planes

Others: +2
+12 from sale of ships to the USA
- 5 for SPG technology from the Dominion (1/3 payments)
- 5 for Paratrooper technology from the Egyptian Sultanate (1/3)

left: 0


Completed at end of this quarter:
- 20 Transport planes
- 72 Dornier Do-H
- 180 torpedo bombers
- 2 new 55-70 kt yards
- Upgrade of 2 55kt yards to 55-70kt yards
- refit of 3 L20alpha and 4 Einheit class BB

Ships launched:
- liner to design of RMS Aquitania
- liner to design of SS Ille de France
Whoever says "education does not matter" can try ignorance
------------
A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
------------
My LPs
User avatar
CmdrWilkens
Emperor's Hand
Posts: 9093
Joined: 2002-07-06 01:24am
Location: Land of the Crabcake
Contact:

Re: SDN World 3 Construction Queue Thread

Post by CmdrWilkens »

The game may be "dead" but damnit I'm building the Nicaraguan Canal....

Industrial Projects of the Mexican Empire

Industry Level: 5 (+10 pts investment, +5% Econ=4)
535.5 pts available
526.8 In Use


Q3 1927 Current Projects

Army: (168)
  • Upgrades: (48)
    • Sixteen (16) Brigades upgrade to Motor Transport (3 pts) [Started Q2 1927 Complete Q1 1928]
      One (1) Brigade upgraded to Armored Bde (see below) (2 pts) [Started Q2 1927 Complete Q1 1928]
    Acquisitions: (120)
    • Brigade acceptance testing New Model (1927 Medium and 1925 Light Tank) (10 pts) [Started Q1 1927, Complete Q4 1927]
      Eleven Brigades upgrade to New Model (10 pts) [Started Q3 1927, Complete Q2 1928, Fully effective Q1 1929]

Navy: (117.8)
  • Slipways: ()
      Acquisitions: (117.8)
      • Two (2) Hispaniola class Aircraft Carriers: 48.8 pts [(2 ships at 24.4 kt with 1pt/1 kt) (Started Q2 1927, Complete Q2 1928, Trials Q1 1929)]
        Four (4) Majestuoso class Battlecruisers: 11pts [(4 ships at 55 kt with .05pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
        Twenty (20) S-class Mk IV Submarines: 24pts [(20 ships at 1.2kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]
        Twenty (20) Rio Grande-class Destroyers: 34pts [(20 ships at 1.7kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]

    Air Force: (66)
    • Aquisitions: (16)
      • 160 Attack fighters (2 wings) DH.10 16pts [(160 planes at 1pt/10) (Started Q3 1927, Complete Q3 1927)]
      Technology: (50)
      • Air Tech 3 to Air Tech 4 [(50pts/qtr for 4 qtrs, 0pts/qtr for 4 quarters) (Started Q1 1927, Complete Q4 1928)]

    Other: (175)
    • Industrial Capacity Increase: 80pts (Started Q1 1927, Round 3 Complete Q4 1927)
      Infrastructure Improvements (Inf 4 to Inf 5): 45pts (Started Q1 1927, Complete Q4 1929)
      Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)

    ============================================================
    Completed Items
    As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)

    =======================
    Q1 1925:
    • 80 Fighters (1 wing) PW-6 8pts (Started Q1 1925, Complete Q1 1925)
      80 Attack fighters (1 wing DH.10 8pts (Started Q1 1925, Complete Q1 1925)
    =======================
    Q2 1925:
    • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
      80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
    =======================
    Q3 1925:
    • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
      III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
      160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
      One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
      One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
    =======================
    Q4 1925:
    • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
      7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
      80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
    =======================
    Q1 1926:
    • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
      80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
      Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
    =======================
    Q2 1926:
    • Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
      80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
      Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
      Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
      Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
    =======================
    Q3 1926:
    • Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
    =======================
    Q4 1926:
    • Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
      Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
      Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
      Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
      Acceptance testing on HP.24 Attack Fighters [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
    =======================
    Q1 1927:
    • Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
      400 Fighters (5 wings) PW-9 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      400 Attack Fighters (5 wings) HP.24 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      Eighty Reconnaissance Planes (1 wing) C-1 (8 pts) [(80 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    =======================
    Q2 1927:
    • 160 Fighters (2 wings) PW.9 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      160 Attack Fighters (2 wings) HP.24 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      20 Transport Planes (1 Squadron plus fill out) T.11 (10 pts) [(20 planes at 1pt/2) )Started Q2 1927 Complete Q2 1927)]
      Acceptance testing on TBN.1 Torpedo Plane [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
      Acceptance testing on FN.1 Naval Fighter [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
      Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
      Industrial Capacity Increase: 20pts (Started Q3 1926, Round 2 Complete Q2 1927)
    Image
    SDNet World Nation: Wilkonia
    Armourer of the WARWOLVES
    ASVS Vet's Association (Class of 2000)
    Former C.S. Strowbridge Gold Ego Award Winner
    MEMBER of the Anti-PETA Anti-Facist LEAGUE

    "I put no stock in religion. By the word religion I have seen the lunacy of fanatics of every denomination be called the will of god. I have seen too much religion in the eyes of too many murderers. Holiness is in right action, and courage on behalf of those who cannot defend themselves, and goodness. "
    -Kingdom of Heaven
    User avatar
    Thanas
    Magister
    Magister
    Posts: 30779
    Joined: 2004-06-26 07:49pm

    Re: SDN World 3 Construction Queue Thread

    Post by Thanas »

    Construction Queue for Nordic Union NPC:
    Population: 3
    Home Territory: 4 (Norway, Sweden, Denmark, Gotland, Aland, Bornholm)
    Colonial Territory: 3 (Iceland, Svalbardia, the Faroe Islands, Labrador, Greenland*)
    Industry: 5
    Economy: 4
    Infrastructure: 4
    SML: 3
    Naval Focus: 4
    Army Focus: 0+3 ( bonus from Industry)
    Air Focus: 1
    525 IBPS
    Population: 75,000,000 (70M in Denmark/Norway/Sweden, 1.4M in Iceland, 3.5M in Vinland/Markland, about 50K apiece in Svalbard and Greenland)
    Mobilization Pool: 12,000,000 (Infrastructure 4 + Economy 4 = 16%)


    Q1 1925:

    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)

    Army - 290ibp
    Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)

    Air Force - 65ibp
    260 Boeing FB - 26pts (completing Q2 1925)
    120 Boeing DT - 24pts (completing Q2 1925)
    3 Zeppelins - 15pts (completing Q3 1925)

    left: 0



    Q2 1925:
    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)

    Army - 290ibp
    Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)

    Air Force - 65ibp
    260 Boeing FB - 26pts (completing Q3 1925)*
    120 Boeing DT - 24pts (completing Q3 1925)*
    3 Zeppelins - 15pts (completing Q3 1925)


    left: 0



    Q3 1925

    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)


    Army - 330ibp
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)
    Raising 40 infantry divisions - 80 IBP (complete Q1 1926)

    Air Force - 25 Ibp
    25 for 250 Boeing FB (1 month)


    left: 0


    Q4 1925

    Navy - 154,9 ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    Trials for 16x S-class submarine - 0,9 ibp (commissioning Q4 1925)

    Army - 290ibp
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 40 infantry divisions - 80 IBP (complete Q1 1926)
    Raising 28 infantry divisions - 56 IBP (complete Q2 1926)

    Airforce:
    24 for 240 Boeing DT


    left: 0,1



    Q1 1926

    525 points

    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)


    Navy - 154ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)

    Army: - 56 ibp
    Raising 28 infantry divisions - 56 IBP (complete Q2 1926)

    Air force:
    15 for 150 Boeing DT


    left: 0




    Q2 1926

    525 points


    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)

    Navy - 154ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)

    left: 11

    Air force:
    11 for 110 Boeing FB



    Q3 1926

    525 points


    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)



    Navy - 225 ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - trials - 2ibp (commissioning Q1 1927)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    49 for 44 V+W class destroyers (launching Q1 1927, commissioning Q2 1927)


    left: 0






    Q4 1926

    525 points


    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)


    Navy - 116ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - trials - 2ibp (commissioning Q1 1927)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    49 for 44 V+W class destroyers (launching Q1 1927, commissioning Q2 1927)

    left: 0



    Q1 1927

    550 points

    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1927)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)


    Navy - 250
    1x Frederik VII-class superdreadnought - 2,4ibp - trials - (commissioning Q1 1928)
    2x Revenge II-class dreadnought - 3,3ib - trials (commissioning Q1 1928)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    49 for 44 V+W class destroyers (launching Q1 1927, commissioning Q2 1927)
    4x Hawkins-class heavy cruiser (40 IBP, launching Q1 1928, commissioning Q3 1928)
    2 Frederik VII class superdreadnoughts (launch Q1 1929, commissioning Q1 1930)


    Air force: 0

    left: 0




    Q2 1927


    550 points

    Navy - 150
    1x Frederik VII-class superdreadnought - 2,4ibp - trials - (commissioning Q1 1928)
    2x Revenge II-class dreadnought - 3,3ib - trials (commissioning Q1 1928)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    44 V+W class destroyers - trials - 2,5, commissioning Q3 1927
    2 Frederik VII class superdreadnoughts (launch Q1 1929, commissioning Q1 1930)
    4x Hawkins-class heavy cruiser (40 IBP, launching Q1 1928, commissioning Q3 1928)

    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1927)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)

    Army:
    Raising 20 horse artillery brigades - 60 IBP, completing Q2 1928
    Raising 20 infantry divisions - 40 IBP, completing Q3 1927

    Air force:
    0,8 for 8 Boeing FB

    0 left



    Units Completed:

    888 Boeing FB
    630 Boeing DT
    3 Zeppelins
    10 cavalry divisions w/ flying artillery
    40 infantry divisions from reserve to active
    68 infantry divisions
    30 motorized infantry brigades
    20 horse artillery brigades
    10 motor artillery brigades
    4 Hawkins-class heavy cruiser
    16x S-class submarine

    Units fitting out/in trials:

    1x Frederik VII-class superdreadnought
    2x Revenge II-class dreadnought
    44 V+W class destroyers
    Whoever says "education does not matter" can try ignorance
    ------------
    A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
    ------------
    My LPs
    User avatar
    Steve
    Emperor's Hand
    Posts: 9774
    Joined: 2002-07-03 01:09pm
    Location: Florida USA
    Contact:

    Re: SDN World 3 Construction Queue Thread

    Post by Steve »

    Q3 1927 Construction Queue

    Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5

    National Projects:

    Air Tech 4 = 20 IBPs, 200/200, started January 1925, minimum completion January 1927 (Completed July 1927)
    Infrastructure Upgrades = 75 IBPs, 375/500, started January 1925
    Nicaragua Canal Project = 20 IBPs

    Total Cost: 95 IBPs


    Army

    6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
    2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
    6 Armored Recon Battalions = 12 IBPs, complete in October 1927
    2 Artillery Brigades = 6 IBPs, complete in July 1927, max effectiveness in July 1928
    2 Motorized Infantry Brigades = 6 IBPs, complete in January 1928, max effectiveness in January 1929
    1 Armored Brigade = 9 IBPs, complete in January 1928, max effectiveness in January 1929
    1 Armored Recon Battalion = 2 IBPs, complete in January 1928, max effectiveness in January 1929
    Activating 3 Infantry Divisions from Reserve = 3 IBPs, complete in July 1927


    Total Cost: 93 IBPs


    Navy

    1 Eagle-class (12,933t) = .7 IBPs (construction complete, completion in October 1927)
    10 Horton-class (1,800t) = 18 IBPs (construction phase complete October 1927, completion in January 1928)
    2 Defiant-class (55,000t) = 110 IBPs (construction phase complete April/July 1927, full completion in March-July 1928)
    2 4 Defiant-class (55,000t) = 11 IBPs (construction complete, full completion in April 1928)
    2 Excalibur-class (64,400t) = 128.8 IBPs (construction phase complete April 1929, full completion in October 1930)
    2 Excalibur-class (64,400t) = 128.8 IBPs (construction phase complete July 1929, full completion in January 1931)
    5 Seattle-class (10,600t) = 53 IBPs (construction phase complete July 1928, full completion in April 1929)
    2 Seattle-class (10,600t) = 21.2 IBPs (construction phase complete October 1928, full completion in July 1929)

    Total Cost: 361.5 IBPs


    Air Force

    5 1926-model fighter aircraft = 5 IBPs (completion July 1927)
    60 1925-model fighter/bomber carrier aircraft = 6 IBPs (completion October 1927)
    20 1925-model B-4 heavy bomber aircraft = 10 IBPs (completion October 1927)

    Total Cost: 16 IBPs

    Overall Expenditures: 565.5/566.5 IBPs


    Research

    Slot 1: Amphibious Landing Boat Designs
    Started: October 1925
    Complete: October 1928

    Slot 2: Superheavy Naval Shells (16" and 18" calibers)
    Started: July 1926
    Complete: July 1928

    Slot 3: Light Tank with Suspension System (Complete!)
    Started: July 1926
    Complete: July 1927

    Slot 3: Automatic Infantry Weapon Studies
    Started: July 1927
    Complete: July 1930
    ”A Radical is a man with both feet planted firmly in the air.” – Franklin Delano Roosevelt

    "No folly is more costly than the folly of intolerant idealism." - Sir Winston L. S. Churchill, Princips Britannia

    American Conservatism is about the exercise of personal responsibility without state interference in the lives of the citizenry..... unless, of course, it involves using the bludgeon of state power to suppress things Conservatives do not like.

    DONALD J. TRUMP IS A SEDITIOUS TRAITOR AND MUST BE IMPEACHED
    User avatar
    Thanas
    Magister
    Magister
    Posts: 30779
    Joined: 2004-06-26 07:49pm

    Re: SDN World 3 Construction Queue Thread

    Post by Thanas »

    Build queue for NPC China:
    Population: 5
    Territory: 5
    Colonies: 0
    Industry: 4
    Economy: 3
    Infastructure: 4
    Starting Military Limit: 2
    Naval Focus: 3
    Army Focus: 5 (3+2)
    Air Focus: 3
    IBP total: 410



    Q1 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (20/200)
    Infrastructure: 10 (10/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)


    Total: 410



    Q2 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (40/200)
    Infrastructure: 10 (20/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)

    Total: 410




    Q3 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (60/200)
    Infrastructure: 10 (30/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)

    Total: 410



    Q4 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (80/200)
    Infrastructure: 10 (40/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)

    Total: 410



    Q1-4 1926:
    Total: 415

    Navy:
    240 for 4 BC and 2 BB (launch Q1 1927, ready Q1 1928)


    Investments:
    Air Tech 4: 30
    Infrastructure: 115
    Industry: 20

    Air Force: 10 for 100 fighters


    Q1 1927:

    Total: 420

    Navy:
    12 for fitting out of 4 BCs and 2 BBs
    106.8 for 60 Fubuki-class analogues (launch Q3 1927, commissioned Q4 1927)

    Investments:
    Industry: 100
    Economy: 50 for Economy 4 (ready Q1 1929)

    Army:
    150 for 75 infantry divisions (ready Q3 1928)

    Air Force:
    1,2 for 12 fighters.

    0 left


    Q2 1927:

    Total: 420

    Navy:
    12 for fitting out of 4 BCs and 2 BBs
    106.8 for 60 Fubuki-class analogues (launch Q3 1927, commissioned Q4 1927)

    Investments:
    Industry: 100
    Economy: 50 for Economy 4 (ready Q1 1929)

    Army:
    150 for 75 infantry divisions (ready Q3 1928)

    Air Force:
    1,2 for 12 fighters.

    0 left

    Completed units:
    412 fighters
    5 armored recon bataillons
    motorization of 5 divisions
    Infrastructure level of 5
    Air tech 4



    NPC Portugal
    Population: 2 (4 with boost from colonies)
    -100 million citizens
    Territory: 1
    Colonies: 4
    Industry: 5
    Economy: 4
    Infrastructure: 3
    Standing Military Limit: 3
    Naval Focus: 2 (5 with boost from Industry)
    Army Focus: 3
    Air Focus: 3

    Manpower pool: 14 million
    4,2 million soldiers
    0,84 active solders
    3,36 reserve soldiers
    Q1 1926:
    525 points to spend

    Investments:
    Economy: 105 points (econ 4 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 23.2 for 1 23.2kt Cidade-class Battleships, launch Q2 1926, ready Q4 1926
    - 2,5 for trials of 20 2,5kt cruiser submarines (ready Q2 1926)

    Army:
    - 20 for 4 siege artillery brigades
    left: 0


    Q2 1926:

    525 points to spend

    Investments:
    Economy: 105 points (econ 5 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 23.2 for 1 23.2kt Cidade-class Battleships, launch Q2 1926, ready Q4 1926

    Army:
    - 20 for 4 siege artillery brigades

    left: 0

    Q3 1926:
    525 points to spend

    Investments:
    Economy: 105 points (econ 5 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 35,6 for 20 Fubuki-class analogues (launch Q1 1927, ready Q2 1927)

    Army:
    - 20 for 4 siege artillery brigades

    left: 0


    Q4 1926:
    550 points to spend

    Investments:
    Economy: 105 points (econ 5 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 35,6 for 20 Fubuki-class analogues (launch Q1 1927, ready Q2 1927)

    Army:
    - 20 for 4 siege artillery brigades

    left: 0


    Q1 1927:
    577.5 points to spend

    Investments: 292.5
    Industry: 100 points
    Infrastructure: 62,5 points (infrastructure 5 finished Q4 1928)
    50 for 2 new 70kt slipways (ready Q1 1929)
    80 for upgrading 4 25-40kt to 70kt slipways

    Navy: 145,9
    - 5 for trials of 2 50kt Gigante-class Dreadnoughts (ready Q1 1928)
    - 5,3 for trials of 4 26.3kt Intervenção-class BB, ready Q1 1928
    - 35,6 for 20 Fubuki-class analogues (launch Q1 1927, ready Q2 1927)
    - 100 for 2 50kt Gigante-class Dreadnoughts (launch Q4 1928, ready Q1 1929)

    Army:
    60 for 30 new infantry divisions (ready Q3 1927)

    Air force:
    48 for 480 fighters
    31,1 for 311 torpedo bombers

    left: 0


    Q2 1927:
    577.5 points to spend

    Investments: 292.5
    Industry: 100 points
    Infrastructure: 62,5 points (infrastructure 5 finished Q4 1928)
    50 for 2 new 70kt slipways (ready Q1 1929)
    80 for upgrading 4 25-40kt to 70kt slipways (ready Q1 1929)

    Navy: 112.1
    - 5 for trials of 2 50kt Gigante-class Dreadnoughts (ready Q1 1928)
    - 5,3 for trials of 4 26.3kt Intervenção-class BB, ready Q1 1928
    - 1.8 for 20 Fubuki-class analogues (ready Q3 1927)
    - 100 for 2 50kt Gigante-class Dreadnoughts (launch Q4 1928, ready Q1 1929)

    Army:
    60 for 30 new infantry divisions (ready Q3 1927)


    Air force:
    60 for 600 fighters
    52,9 for 529 light bombers

    left: 0

    Completed units (Q3 1927):
    4 Siege artillery brigades
    1080 fighters
    311 torpedo bombers
    529 light bombers
    20 Fubuki-class analogues
    30 infantry divisions


    New manpower at end of Q2 1927: 18 million (due to raising of econ to 5)
    active soldiers: 1,31 million
    reserve: 3,36 million
    Manpower pool left: 13,33 million
    Whoever says "education does not matter" can try ignorance
    ------------
    A decision must be made in the life of every nation at the very moment when the grasp of the enemy is at its throat. Then, it seems that the only way to survive is to use the means of the enemy, to rest survival upon what is expedient, to look the other way. Well, the answer to that is 'survival as what'? A country isn't a rock. It's not an extension of one's self. It's what it stands for. It's what it stands for when standing for something is the most difficult! - Chief Judge Haywood
    ------------
    My LPs
    Post Reply